Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 8 of 8  Not logged in ELOG logo
Entry  Mon Oct 4 21:01:25 2010, Christian Irmler, BELLE, run, run43, 30000, 04.10.2010 20:59:48, 04.10.2010 23:04:24 
angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C
Entry  Tue Oct 5 17:50:23 2010, Christian Irmler, ITE, cal, cal012, 83800, 05.10.2010 17:50:26, 05.10.2010 18:09:48  
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
Entry  Tue Oct 5 18:13:05 2010, Christian Irmler, ITE, run, run048, 533125, 05.10.2010 18:14:57, 06.10.2010 09:27:44 LongtermITERun2.png
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
Entry  Fri Oct 8 18:12:15 2010, Christian Irmler, BELLE, run, run053, 98000, 08.10.2010 00:33:14, 08.10.2010 13:36:57 
Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
Entry  Fri Oct 8 23:43:07 2010, Christian Irmler, BELLE, run, run055, 12316, 08.10.2010 23:42:51, 09.10.2010 00:14:56  
Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA 
cooling: Origami only, chiller set to -25°C, 
Entry  Sat Oct 9 12:00:55 2010, Christian Irmler, BELLE, cal, cal017, 83800, 09.10.2010 11:59:37,  
Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73°
HV=100V / 40 µA 
    Reply  Mon Oct 11 11:18:17 2010, Christian Irmler, common, end of success, , , 09.10.2010 19:44:23, NaN IMG_9033.JPG
der Beiweis  :-)
ELOG V3.1.5-fc6679b