Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 3 of 8  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Thu Sep 30 18:12:53 2010, Markus Friedl, Micron Baby, run, run017, 35000, 30.09.2010 18:11:53, 30.09.2010 20:22:43 number_of_clusters_telescope.png
micron baby: 4 DUTs
HV=100V I=13.5uA, I_stop=17uA
Beam on
Entry  Thu Sep 30 20:47:01 2010, Markus Friedl, Micron Baby, run, run018, 26938, 30.09.2010 20:45:48, 30.09.2010 22:25:25 
micron baby: 4 DUTs
HV=100V I=13.7uA, I_stop=15.6uA
Beam on
Entry  Fri Oct 1 23:18:34 2010, Markus Friedl, CNM, run, run022, 8139, 01.10.2010 23:17:02 , 01.10.2010 23:45:51 
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Sat Oct 2 17:24:12 2010, Markus Friedl, ITE, run, run026, 5834, 02.10.2010 17:23:46 , 02.10.2010 17:31:51 
2 x SILC + 2 x ITE
HV=100V
 
Entry  Sat Oct 2 17:35:51 2010, Markus Friedl, ITE, run, run027, 2999, 02.10.2010 17:34:51 , 02.10.2010 17:38:39 
2 x SILC + 2 x ITE
HV=100V
telescope position: 107
Entry  Sat Oct 2 18:36:57 2010, Markus Friedl, ITE, run, run028, 162263, 02.10.2010 18:34:06, 03.10.2010 08:11:13  
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
Entry  Sun Oct 3 08:14:39 2010, Markus Friedl, ITE, cal, cal008, 83800, 03.10.2010 08:13:06,  
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
Entry  Sun Oct 3 08:19:13 2010, Markus Friedl, ITE, run, run029, 75000, 03.10.2010 08:33:28, 03.10.2010 10:50:27 
same as previous run
telescope run 20127
Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample!
Entry  Wed Oct 6 11:59:29 2010, Markus Friedl, Micron Baby, run, run050, 90000, 06.10.2010 11:57:55, 06.10.2010 15:30:37 
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
Entry  Wed Oct 6 16:33:55 2010, Markus Friedl, Micron Baby, run, run051, 90000, 06.10.2010 16:32:03, 06.10.2010 20:59:58 
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=209uA (start of run, still rising); 203uA (end of run)
beam on, NIM trigger from TLU (no handshake)
Entry  Wed Oct 6 23:48:49 2010, Markus Friedl, BELLE, run, run052, 165789, 06.10.2010 23:47:12, 07.10.2010 08:43:42 
Belle stack without Origami2
HV=80V I=217uA
telescope setting 103 / 30 / 277.5
Entry  Fri Oct 8 17:26:36 2010, Markus Friedl, BELLE, cal, cal015, 83800, 08.10.2010 17:22:44,  
Belle stack without Origami2
HV=11V I=32uA
beam on
Entry  Fri Oct 8 18:12:43 2010, Markus Friedl, BELLE, run, run054, 90000, 08.10.2010 18:08:48, 08.10.2010 21:49:36  
Belle stack w/o Origami2 after irradiation
HV=80V I=224uA (beginning of run)
2 suspicious APVs on Micron n side
Entry  Fri Oct 8 23:05:03 2010, Markus Friedl, BELLE, cal, cal016, 83800, 08.10.2010 23:03:16,  
Belle stack w/o Origami2 after irradiation
HV=80V / 258 µA 
cooling: Origami only, chiller set to -25°C, 
Entry  Sat Oct 9 00:17:02 2010, Markus Friedl, BELLE, run, run056, 225k, 09.10.2010 00:15:53, 09.10.2010 09:54:28 
Belle stack w/o Origami2 after irradiation
HV=80V / I_start=255 µA, I_stop=243 µA  
cooling: Origami only, chiller set to -25°C, 
Entry  Sat Oct 9 15:29:09 2010, Markus Friedl, BELLE, run, run058, 30000, 09.10.2010 15:26:50, 09.10.2010 16:21:37 
Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73 - now with multi6 (previous run was single)
HV=100V / 35uA (beginning of run) 34uA (end of run)
Entry  Sat Oct 9 19:44:36 2010, Markus Friedl, common, end of success, , , 09.10.2010 19:44:23, NaN 
 
Entry  Wed Sep 15 10:25:13 2010, Marko Dragicevic, common, Equipment List, , , ,  
[B]Slow Control:[/B]
3x Source Measurement Unit Keithley K2410
-- Inv.Nr.: 540-702, 1000EUR
Entry  Sun Oct 3 14:35:12 2010, Marko Dragicevic, CNM, cal, cal009, 83800, 03.10.2010 13:50:54,  cal009_cal_apv6.pngcal009_cal_apv7.pngslowcontrol_CNM_cal009.gif
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Mon Oct 4 10:43:45 2010, Marko Dragicevic, Pt, run, run036, 25600, 04.10.2010 10:33:05, 04.10.2010 11:35:51 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.9A h02=12.5A
ELOG V3.1.5-fc6679b