ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
67
|
Sat Aug 22 13:28:53 2009 |
Wolfgang Kiesenhofer | Pt_ITE512 | runlist for pt-module angle-scan | | | | |
Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6
run |
angle[deg] |
pos |
height (xy-table) |
importance |
events |
1 |
1 |
center module |
|
+ |
10k |
2 |
2 |
center module |
|
+ |
10k |
3 |
3 |
center module |
|
+ |
10k |
4 |
4 |
center module |
|
+ |
10k |
5 |
5 |
center module |
|
+ |
10k |
6 |
6 |
center module |
|
+ |
10k |
7 |
7 |
center module |
|
+ |
10k |
8 |
8 |
center module |
|
+ |
10k |
9 |
9 |
center module |
|
+ |
10k |
10 |
10 |
center module |
|
+ |
10k |
11 |
12 |
center module |
|
+ |
10k |
12 |
14 |
center module |
|
- |
10k |
13 |
16 |
center module |
|
- |
10k |
14 |
0 |
center module |
|
+ |
? depends on ite512 |
15 |
0 |
upper pos |
|
+ |
10k |
16 |
0 |
lower pos |
|
+ |
10k |
|
71
|
Sat Aug 22 15:12:44 2009 |
Thomas Bergauer | common | beam profile | | | | |
playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
Rate: 3.35E5 particles/spill (measured with SCINT8 in beamline)
Particle Production Applet
Calculator applet
For +120 Gev/c beam:
Pi+ |
55.67 % |
p |
38.95 % |
K+ |
5.38 % |
|
Attachment 1: 20090822_1511_beam_conditions.jpg
|
|
80
|
Sun Aug 23 13:15:42 2009 |
Marko Dragicevic | Pt_ITE512 | Current and Humindity during first Run | | | | |
Current of Pt modules during first run
Data of the run was dicarded.
Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.
Timescales for RH and I graph are different!!!
after 3 hours first bottle of compressed air (dewpoint -170 degree C) is gone and sensor Pt-h01 starts to fluctuate again
Current of ITE512 plus 2 SiLC08 modules
HV=70V, Current: 25uA first, 29uA then, 35uA latest. now stable
|
Attachment 1: IandRH_first_Pt_run.png
|
|
Attachment 2: Picture_1.png
|
|
84
|
Sun Aug 23 23:38:27 2009 |
Georg Auzinger | | Phone numbers | | | | |
Georg #70
Wolfgang - Building: 41, Room: 204, Tel: ?
Manfred: Building 38, Room 522, Tel: 70522
Chrisu: B39, room 309, Tel: 79309
Bergi: Tel Zimmer: 79112, Handy: 16-2471
Maks: Tel Zimmer: 79117 |
94
|
Tue Aug 25 09:00:51 2009 |
Thomas Bergauer | | beam conditions | | | | |
manually changed TRIM3, TRIM4 and TRIM6 |
Attachment 1: magnet_settings_withH6B.802.jpg
|
|
Attachment 2: 20090825_0859_beam_conditions.jpg
|
|
114
|
Fri Dec 4 12:21:56 2009 |
Wolfgang Kiesenhofer | | ITE128 strip correlation kendall tau (preliminary result) | | | | |
Kendall tau (rank correlation) for module 1 (single layer 1 / h13), module 2 (single layer 2 / h14), module 6 (standard sensor 2 / h12)
|
Attachment 1: stripcorr_mod1_thrs5_ktau_ev100000_run002_strip.pdf
|
Attachment 2: stripcorr_mod2_thrs5_ktau_ev100000_run002_strip.pdf
|
Attachment 3: stripcorr_mod6_thrs5_ktau_ev100000_run002_strip.pdf
|