Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 6 of 6  Not logged in ELOG logo
Entry  Fri Aug 21 13:38:20 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz hit mode, run011, 75000, 21.08.2009 13:35:25 ,  
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
Entry  Fri Aug 21 18:07:57 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz, pedcorr004, , 21.08.2009 17:49:10, 21.08.2009 18:24:31 
4 Belle DUTs
HV=80V, 31.8 MHz
pedestal correction
Entry  Fri Aug 21 18:35:13 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode, run012, 60000, 21.08.2009 18:31:01, 21.08.2009 23:25:03 
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
Entry  Sun Aug 23 08:13:31 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (4mm below center), run023, 100k, 23.08.2009 08:06:58, 23.08.2009 09:30:53 
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
Entry  Sun Aug 23 02:18:20 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (3mm below center); during night, run022, 407895, 23.08.2009 02:16:21, 23.08.2009 08:04:09 Picture_1.png
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
Entry  Sun Aug 23 01:46:03 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: central position, run021, 100k, 23.08.09 00:10 (ca.), 23.08.2009 02:15:10 Picture_1.png
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
ELOG V3.1.5-fc6679b