| 
| ID | Date | Author  | Project | Subject | Run Number | Events | StartTime | EndTime | Text |  |  | 76 | Sat Aug 22 23:06:22 2009 | Christian Irmler | BELLE | pedestal correction 40 MHz  transparent mode + cooling | pedcorr007 |  | 22.08.2009  23:04:29 | 22.08.2009  23:13:51 | Belle DUT, HV=80V, 40 MHz, beam off 1 sample, transparent mode
 pedestal correction
 |  |  | 82 | Sun Aug 23 17:18:25 2009 | Christian Irmler | Pt_ITE512 | pedestal correction | pedcorr008 |  | 23.08.2009  17:17:36 |  | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
 ITE512: HV=70V,
 |  |  | 83 | Sun Aug 23 17:19:50 2009 | Christian Irmler | Pt_ITE512 | internal calibration | cal011 |  | 23.08.2009  16:30:43 | 23.08.2009  17:02:14 | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
 ITE512: HV=70V,
 |  |  | 103 | Tue Aug 25 20:21:31 2009 | Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode | run042 | 85189 | 25.08.2009  20:18:18 | 26.08.2009  01:27:12 | Belle DUT, HV=80V,  40 MHz, 120 GeV 6 samples, transparent mode
 no cooling
 |  |  | 104 | Wed Aug 26 01:32:25 2009 | Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run043 | 100600 | 26.08.2009  01:46:38 | 26.08.2009  07:10:14 | Belle DUT, HV=80V,  40 MHz, 120 GeV 6 samples, transparent mode
 w cooling, chiller set to 13 deg,
 |  |  | 105 | Wed Aug 26 07:19:42 2009 | Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run044 | 13504 | 26.08.2009  07:18:19 | 26.08.2009  08:46:11  (beam shut down @ 8:00) | Belle DUT, HV=80V,  31.8 MHz, 120 GeV
 6 samples, transparent mode
 |  |  |