| ID | 
Date | 
Author | 
Project | 
Subject | 
Run Number | 
Events | 
StartTime | 
EndTime  | 
Text | 
  |  
| 
  82  
 | 
Sun Aug 23 17:18:25 2009 | 
Christian Irmler | Pt_ITE512 | pedestal correction | pedcorr008 |   | 23.08.2009  17:17:36  |   | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam 
off
 
ITE512: HV=70V, | 
   |  | 
  84  
 | 
Sun Aug 23 23:38:27 2009 | 
Georg Auzinger |   | Phone numbers |   |   |   |   |  Georg #70
 
Wolfgang - Building: 41, Room: 204, 
Tel: ? | 
   |  | 
  94  
 | 
Tue Aug 25 09:00:51 2009 | 
Thomas Bergauer |   | beam conditions |   |   |   |   | manually changed TRIM3, TRIM4 and TRIM6 | 
     |  | 
  106  
 | 
Wed Aug 26 14:26:13 2009 | 
Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 |   |   |   | Most probable S/N, Single Metal Layer, 
2D histogram fitted with langau in 5 bin 
(strips) slices. | 
    |  | 
  107  
 | 
Wed Sep  2 14:15:17 2009 | 
Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 |   |   |   | Preliminary strip correlation (Kendalls 
Tau) for threshold = 3*stripnoise. | 
    |  | 
  114  
 | 
Fri Dec  4 12:21:56 2009 | 
Wolfgang Kiesenhofer |   | ITE128 strip correlation kendall tau (preliminary result) |   |   |   |   | Kendall tau (rank correlation) for module 
1 (single layer 1 / h13), module 2 (single 
layer 2 / h14),  module 6 (standard | 
      |   
 |