ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Text |
|
83
|
Sun Aug 23 17:19:50 2009 |
Christian Irmler | Pt_ITE512 | internal calibration | cal011 | | 23.08.2009 16:30:43 | 23.08.2009 17:02:14 | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam
off
ITE512: HV=70V, |
|
84
|
Sun Aug 23 23:38:27 2009 |
Georg Auzinger | | Phone numbers | | | | | Georg #70
Wolfgang - Building: 41, Room: 204,
Tel: ? |
|
94
|
Tue Aug 25 09:00:51 2009 |
Thomas Bergauer | | beam conditions | | | | | manually changed TRIM3, TRIM4 and TRIM6 |
|
106
|
Wed Aug 26 14:26:13 2009 |
Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 | | | | Most probable S/N, Single Metal Layer,
2D histogram fitted with langau in 5 bin
(strips) slices. |
|
107
|
Wed Sep 2 14:15:17 2009 |
Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 | | | | Preliminary strip correlation (Kendalls
Tau) for threshold = 3*stripnoise. |
|
114
|
Fri Dec 4 12:21:56 2009 |
Wolfgang Kiesenhofer | | ITE128 strip correlation kendall tau (preliminary result) | | | | | Kendall tau (rank correlation) for module
1 (single layer 1 / h13), module 2 (single
layer 2 / h14), module 6 (standard |
|
|