Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 5 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Numberdown Events StartTime EndTime
  16   Wed Aug 19 15:37:37 2009 Christian IrmlerITE128internal calibrationcal001 15:31:29 

8 modules, HV=70V, 40MHz, 1 sample
no beam

APV 4,5: inverter off, higher baseline = PAD modules

  32   Thu Aug 20 15:50:58 2009 Manfred Valentanalignment_laserslow control: HV graphall alignemnt_laser runs 20.08.09 10:364h 43m 52s later

blue graph: h03

white graph: h04

Attachment 1: slow_control_alignment_sensors.gif
slow_control_alignment_sensors.gif
  1   Mon Jul 6 12:22:47 2009 Stephan HänselSiLCMeasurements - hybrids with APV    

Pt Modules:

Optical Modules:

ITE Modules:

  2   Mon Jul 6 12:24:53 2009 Stephan HänselSiLCModule Drawings    

Pt Modules:

Optical Modules:

ITE Modules: :

 

  5   Mon Jul 6 12:29:20 2009 Stephan HänselSiLCSensors - layout    

Pt Modules:

CMS OB1 Sensors:

 

Optical Modules:

Sensors:

 

ITE Modules:

Attachment 1: Wafer-Screenshot.png
Wafer-Screenshot.png
  6   Mon Jul 6 14:30:45 2009 Marko Dragicevic Equipment List    
Slow Control:
Source Measurement Unit Keithley K2410, Inv.Nr.: 540-702, 2000EUR
-- Koax-Kabel + Adapter auf Banane
Scanning Voltmeter Keithley K2700 , Inv.Nr.: 540-698, 2000EUR
-- Shunt-Widerstand-Platine
-- Flachbandkabel fuer Verbindung Shunt-Platine<->K2700
TRHX
-- 3 Sensoren
-- 2 lange Flachbandkabel, 1 serielles Kabel
LV-Power-Supplies, je 150EUR
-- GW Instek GPC-1850, SN.: 4080392
-- GW Instek GPC-1850D, Inv.Nr.: 545-059
-- GW Instek GPC-1850D, Inv.Nr.: 545-062
-- Systron Donner HR 20-10A, SN.: 781-092
-- Systron Donner HR 20-10A, SN.: 781-096
Oszilloskop Tektronix TDS 3054, SN.: B011109, 4000EUR
-- 4 probes
Die Katze (Belle-HV-Supply)
-- HV-Kabel 30m
GBIP-Kabel, 1x lang, 1x kurz
Signalgenerator Agilent 81110A, Inv.Nr.: 541-054, 3000EUR

DAQ:
Chrisu-PC, Inv.Nr.: 401-925
-- Monitore
---- Belinea, Inv.Nr.: 401-696
---- Gericom, SN.: M1132GR5467345
-- Keyboard & Maus
Wiener 9U-VME-Crate, Inv.Nr.: 545-043, 3000EUR
-- Power Supply
-- VME-Controller
-- 4 VME-Module (1x Buffer, 3x FADC)
DOCK-Box
-- Power Kabel
VME-Kabel (bockig) + Verlaengerung
30m-Kabel (8xCat7, 2xCat5, 2xgrau)
Lemo-Kabel
100pin-Flachkabel Neco-Buffer
Bananenkabel
Hybridkabel (8x SiLC, Belle-Kabel)
Special TLU-Adapter (flipping pin order of RJ45)
Schrauben für Crate-Montage
Erdungskabel (liegen am CERN im Labor)
THRX + Hum. Sensoren!
Magic Box

DUT:
Schrauben für Montage am Drehteller
4mm Steckschlauch Stickstoff (Laenge?)
Anschluss 1/8" auf 4mm Steckschlauch
Druckminderer, SN.: 717.06143
-- 6mm Snap-In
-- 6mm Schlauch
Chiller Huber ministat 230, Inv.Nr.: 482-021, 4000EUR
-- Manual
-- Netzteil
-- langes serielles Kabel
-- 5-6mm Schlauch
-- Adapter
-- 5 Liter dest. Wasser (falls noch Platz ist)
-- LabView (falls ferngesteuert)
Box-Deckel
Baseplates (4?)
Gaffa
Doppelscotch
Schwarze Selbstklebefolie
Alufolie
Sockel (2 verschiedene)
Schablonen für SiLC-Angle Scan (08-Modules)
gscheites Verlängerungskabel
genug Schrauben, Gewindestangen, Flügelmuttern
2 Balken für Pt-Module Drehungen (+ genug "Bolzen")
GROSSES SCHWARZES LICHTDICHTES TUCH !!!!
THRX-Kabel & Sensoren
25 Module
-- 4 Belle-Module (1 Stack)
-- 2 pt-Module
-- 2 Alignment-Module
-- 2 Stacks mit Warschau-Sensoren (1x 6 Sensoren, 1x 3 Sensoren)
-- 8 SiLC-Module (1 Stack)


EDV:
Netzwerkkabel
Netzwerk-Switch:
-- 3com Gigabit Switch 8, SN.: AB/9XRQ9J00171B0
-- D-Link 8-Port GBit-Switch
WLAN-Router: Linksys WRT54GL-DE, SN.: CL7B1H502248, 60 EUR
1TB externe Festplatte: Western Digital MyBook, SN.: WCA551469094
-- Netzgeraet
-- USB-Kabel
-- Firewire 400/800 Kabel
Webcam
USB-Stick
Etikettiergeraet: Brother P-touch 1000
Verlaengerungskabel ohne Ende…
1 Dose Druckluft zur Reinigung
Laptops
-- Apple MacBook (MV) Inv.Nr.: 401-810
-- Apple MacBook Pro (MD) Inv Nr.: 401-831
-- Apple MacBook (GA) SN.:W87411Q3Z5Z
2x PCI Express-Karten (noch zu kaufen), je 30EUR
2x USB-Seriell Adapter
1 Trommel Ethernet-Kabel (100m, vom Walzel)
einige RJ-45 Stecker
2.5" externe HD
CD und DVD Rohlinge

Tools:
Diverse Adaptoren Lemo-BNC, Lemo-Lemo
Taschenlampe + 2x Hirnbirn
Massband
Multimeter
Werkzeug (Schraubenzieher & Co)
Pinzetten
Laserpointer
Schwarze Fetzen
Scotch tape
Kabelbinder
Adapter f. Steckdosen
Verteiler-Leisten
Tixo klein & gross
Loetstation Advanced JBC, SN.: 76841165, inkl. Zubehoer
Ethernet-Crimp-Zange
Eisensagl
Schublehre

Misc:
Fondueset Wink
Spiegelreflex Digitalkamera Canon 450D (400EUR)
-- Stativ
-- Reflexionszelt
SLR Marko
Stativ
Scheinwerfer (fuer ordentliche Fotos)
Akkus+Ladegerät
Dickes Logbook
Kugelschreiber/Bleistifte
Pflaster
Carnet ATA
Attachment 1: carnet_aug09.xls
  7   Mon Jul 6 16:22:36 2009 Stephan HänselSiLCMeasurements - Sensors    

Pt Modules:

 

Optical Modules:

 

ITE Modules:

 

 

  8   Mon Jul 6 16:23:51 2009 Stephan HänselSiLCModule Components    

Pt Modules:


Pt-1:
hybrid: h01-4APV
bottom sensor: 30210331516116
top sensor: 30210332911309

Pt-2:
hybrid: h02-4APV
bottom sensor: 30210331415917
top sensor: 30210314845402

 

Optical Modules:


Opt_AC-Test-1:
hybrid: h21-2APV
sensor: HPK-ILC-TS-SPL-6687-05

Opt_AC-Test-2:
hybrid: h22-2APV
sensor: HPK-ILC-TS-SPL-6687-07


modules with SiLC alignment sensors:
Opt-1:
hybrid: h03
sensor: HPK-SPL-6686-03

Opt-2:
hybrid: h04
sensor: HPK-SPL-6686-07

 

ITE Modules:

  9   Thu Jul 9 10:29:58 2009 Stephan HänselSiLCMeasurements - Modules    

Pt Modules:

- Sensoren sind Luftfeuhtigkeitsempfindlich

- die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren 

small Problems:

 

Optical Modules:

small Problems with h03-Module:

ITE Modules:

 

  10   Fri Jul 17 14:03:21 2009 Stephan Hänsel What to measure    

Origami

 

Testbeam08 Module

- Anglescan

 

Pt Modules (2Stück - je 2 Sensoren):

Anglescan

- einzelne module (auch als "stub" (fixer Abstand zwischen ihnen) ?)

wichtig: brauchen wir 2 Testbeam08 module um 90° verdreht für höheninformation??? (sensoren in den Pt-modulen sind nicht 100%ig parallel - MESSEN!)

 

Optical Modules:(DAUER ca 18 Stunden)

- tests in box mit laserbeam (laser auf anderer Höhe al beam?!? - sonst geht der beam durch den Laser)

 

ITE Modules:

- 8 ter stack: (2 Testbeam08 module quer + 2 x 1stmetal128 + 2 x 2nd metal 128 + 2 x normal128)

- 2ndmetal512 module 3 stück bauen und im beam versetzt einbauen parasitär bei den spanier-modulen)

 

zusätliche ideen:

- CMS-Tracker slice (2Pt + 2 optische + 3 2ndmetal512 hintereinander in unterschiedlichen winkeln um einen tracker-slice zu simulieren - CMS-layout !?!)

 

 

  11   Fri Jul 31 19:23:26 2009 Thomas Bergauer Laser Spot size    
10cm nach Kollimator: Durchmesser 1.45mm (FWHM) 20cm nach Kollimator: Durchmesser 1,54mm (FWHM)
Attachment 1: laser_spot_overview.jpg
laser_spot_overview.jpg
Attachment 2: laser_spot_10cm.jpg
laser_spot_10cm.jpg
Attachment 3: laser_spot_20cm.jpg
laser_spot_20cm.jpg
Attachment 4: laser_spot_30cm.jpg
laser_spot_30cm.jpg
  12   Tue Aug 11 14:03:57 2009 Marko Dragicevic Sensor Designs    

Screenshots

HEPHY Gallery

GDS File Viewer

 KLayout Website

 Layer Properties File Warsaw.lyp in den Attachments.

Attachment 1: Wafer.gds
Attachment 2: SensorSTD.gds
Attachment 3: SensorPAS.gds
Attachment 4: SensorPAD.gds
Attachment 5: Sensor512.gds
Attachment 6: Warsaw.lyp
<?xml version="1.0"?>
<layer-properties>
 <properties>
  <frame-color>#01ff6b</frame-color>
  <fill-color>#01ff6b</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I3</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>NPlus</name>
  <source>1/0@1</source>
 </properties>
 <properties>
  <frame-color>#ff0000</frame-color>
  <fill-color>#ff0000</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I9</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>PPlus</name>
  <source>2/0@1</source>
 </properties>
 <properties>
  <frame-color>#ff8000</frame-color>
  <fill-color>#ff8000</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I0</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Via</name>
  <source>3/0@1</source>
 </properties>
 <properties>
  <frame-color>#00ffff</frame-color>
  <fill-color>#00ffff</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I15</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Metal</name>
  <source>4/0@1</source>
 </properties>
 <properties>
  <frame-color>#ff00ff</frame-color>
  <fill-color>#ff00ff</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I2</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Passivation</name>
  <source>5/0@1</source>
 </properties>
 <properties>
  <frame-color>#91ff00</frame-color>
  <fill-color>#91ff00</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I3</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>PolySilicon</name>
  <source>6/0@1</source>
 </properties>
 <properties>
  <frame-color>#008050</frame-color>
  <fill-color>#008050</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I2</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>PolySiHeads</name>
  <source>7/0@1</source>
 </properties>
 <properties>
  <frame-color>#ffa080</frame-color>
  <fill-color>#ffa080</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I0</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Via2</name>
  <source>8/0@1</source>
 </properties>
 <properties>
  <frame-color>#000080</frame-color>
  <fill-color>#000080</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I12</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Metal2</name>
  <source>10/0@1</source>
 </properties>
 <properties>
  <frame-color>#ffa080</frame-color>
  <fill-color>#ffa080</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I1</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Margins</name>
  <source>11/0@1</source>
 </properties>
 <properties>
  <frame-color>#805000</frame-color>
  <fill-color>#805000</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I0</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Dicing Lines</name>
  <source>12/0@1</source>
 </properties>
 <custom-dither-pattern>
  <pattern>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
  </pattern>
  <order>1</order>
  <name></name>
 </custom-dither-pattern>
</layer-properties>
  13   Fri Aug 14 16:45:25 2009 Stephan Hänsel Module - Setups    

 

  • 5mm Inbus-Schlüssel
  • 3mm Inbus Schlüssel
  • 6- 2(1) x 30 Pt-Pins
  • beim 5mm-Sockel müssen die 2 Löcher über die das optische Modul h03 verschraubt wird noch ausgeweitet werden (Thomas)
  • bei Pt-Deckel oben einzeichnen welche Balkenstellung welchem Winkel entspricht

(SK) ... SenkKopf

(ZK) ... ZylinderKopf

 

Beam Positions  (alle mit 5mm-Sockel)

 

OPTISCHER SETUP Setup-alignment-modules

upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend

1) Collimator

  • Alu-Spacer (neuer = höheren verwenden) + 4- M6 x 15 (ZK)
  • schwarzer-Spanier-x-y-z-Tisch - Schreuben dabei -> Plastikschrauben abschneiden ?!?

2) 5mm Spacer + h03 - backplane richtung Collimator -  APV3210

  • 2- M4 x 15 (SK) - 5mm Spacer durch Alignment-Boden mit h03 verschrauben
  • 3- M4 x 15 (SK) - Alignment-Boden auf Drehteller verschrauben

3) h04 - backplane richtung Collimator -  APV3210

  • 2 Positionen
  • 2- M4 x 10 (SK)

 

 

Pt + ITE-512-Stack + 3 SiLC08-Module

upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend

1) h06-ITE-512 - APV0123 (allerdings nur eineinhalb APVs gebondet!)

2) h05-ITE-512 - APV0123

3) h07-ITE-512 - APV3210 !!!

4) SiLC08-2 - APV12 - 90° gedreht

5) SiLC08-1 - APV12 - 90° gedreht

6) SiLC08-0 - APV12 - 90° gedreht

Stack 1) bis 6)

  • schwarzer Sockel +4- M4 x 35 (ZK) -> verschraubt in h06 und h07
  • 2 Gewindestangen M6 x 80 + 4 Scheiben + 4 Muttern M6 -> die 3 ITE-512er zusammen
  • 3 Gewindestangen M6 x 160 + 6 Scheiben + 5 Flügelmuttern M6 + 1 Mutter M6 -> 3- SiLC08-Module VORSICHTIG dazu

7) h02-Pt - APV0123 - überprüfen - kann rotieren ;-)

  • Schrauben gehen von oben (ausserhalb der Box): Balken - Box-Deckel - Beilagscheibe - Pt-Modul
  • Balken + 4- 2(1) x 30 Pins + 2- Scheiben + 2- M4 x 20

8) h01-Pt - APV0123 - überprüfen - kann rotieren;-)

  • Schrauben gehen von oben (ausserhalb der Box): Balken - Box-Deckel - Beilagscheibe - Pt-Modul
  • Balken + 4- 2(1) x 30 Pins + 2- Scheiben + 2- M4 x 20

 

 

ITE128-Stack

upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend

1) h21_alignment-TS05 - APV12 - 90°gedreht

2) h13_ITE-PAS - APV1

3) h14_ITE-PAS - APV1

4) h15_ITE-PAD - APV1

5) h16_ITE-PAD - APV1

6) h11_ITE-STD - APV1

7) h12_ITE-STD - APV1

8) h22-alignment-TS07 - APV12 - 90°gedreht

Schrauben verwenden je nach Sockel und Spacer

 

SiLC08-Stack

upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend

1) SiLC08-7 - APV12 - Überprüfen

2) SiLC08-6 - APV12 - Überprüfen

3) SiLC08-5 - APV12 - Überprüfen

4) SiLC08-4 - APV12 - Überprüfen

5) SiLC08-3 - APV12 - Überprüfen

6) SiLC08-2 - APV12 - Überprüfen

7) SiLC08-1 - APV12 - Überprüfen

8) SiLC08-0 - APV12 - Überprüfen 

Schrauben verwenden je nach Sockel und Spacer

  14   Fri Aug 14 19:35:43 2009 Thomas BergauerPt_ITE512intcal    

HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)

h01-Pt: 10uA

h02-Pt: 1.6uA

3 SiLC DUTs mit je ca. 38nA

h07-ITE-512: 3.77uA

h05-ITE-512: breakthrough

h06-ITE-512: breakthrough

  15   Fri Aug 14 21:36:17 2009 Markus Friedl Config files    

Status of config files as of Friday 14 August 2009 late evening

Config file name Timing adjusted Sensor definition Tested
cern09_ite128_single1 YES NOT YET (?) YES

cern09_ite128_multi6

YES NOT YET (?) YES

cern09_pt_ite512_single1

YES NOT YET (?) YES

cern09_pt_ite512_multi6

YES NOT YET (?) NO

cern09_alignment_beam_single1

YES NOT YET (?) YES

cern09_alignment_beam_multi6

YES NOT YET (?) YES

cern09_belle_single

YES NOT YET (?) YES

cern09_belle_multi6

YES NOT YET (?) YES
cern09_silc_all_single YES (2008) YES (2008) NO
cern09_silc_all_multi6 YES (2008) YES (2008) NO




  17   Wed Aug 19 15:41:17 2009 Wolfgang KiesenhoferSiLCangle scan templates    

Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen auf die Beam Richtung).

Attachment 1: angle_scan0.pdf
Attachment 2: angle_scan5.pdf
Attachment 3: angle_scan10.pdf
Attachment 4: angle_scan15.pdf
Attachment 5: angle_scan20.pdf
Attachment 6: angle_scan25.pdf
Attachment 7: angle_scan30.pdf
Attachment 8: angle_scan35.pdf
Attachment 9: angle_scan40.pdf
Attachment 10: angle_scan45.pdf
Attachment 11: angle_scan50.pdf
Attachment 12: angle_scan55.pdf
Attachment 13: angle_scan60.pdf
  20   Wed Aug 19 22:57:13 2009 Marko Dragicevic How-To    

TLU (run from DAQPCHEPHY):

ssh eudet@eudetmac001.cern.ch
ssh tlupc
~\eudaq\bin\TLUControl.exe -d1 -a12

-t100 internal trigger
-aXX Mask for Szintis:
1   4 mm (front)
2   4 mm (front)
4   9 mm (back)
8   9 mm (back)

DAQ:

Hostname: DAQPCHEPHY.CERN.CH

XY Table PC:

Hostname: XYPCEUDET.CERN.CH

Beam Control:

Hostname: cwo-hna453-h6b1.cern.ch
137.138.61.206

Eudet DAQ:

vnc eudetmac001.cern.ch
Cycle Run:
o) stop DAQ
o) kill eudaq Run Control
o) restart: ./STARTRUN.FORTIS.1
o) load config: testfortis_with_eudrb_beam_backpressure_WITH_SILC
o) press: Config (wait ~1 min.)
o) press: Start

  33   Thu Aug 20 15:54:45 2009 Manfred ValentanBELLEtemp/humidty logger data    

position: underneath telescope. dewpoint ~ 15 degree

test with chiller: running 4 hours at 15 degress: NO condensation on alu pipe

Attachment 1: easylog_under_telescope.gif
easylog_under_telescope.gif
  58   Fri Aug 21 22:42:32 2009 Thomas BergauercommonEUDAQ config file used when running with telescope    

 

Used until Friday, 21.08.09:

 

AndMask = 0xf # 4x4 mm scintillator for trigger 

Used since Friday, 21.08.09: 
AndMask = 0xc # 9x9 mm scintillator for trigger 





Local trigger using TLU only: ALWAYS WITH 9x9mm scintillator

Attachment 1: testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf
[RunControl]
RunSizeLimit = 1800000000
NoTrigWarnTime = 10

[DataCollector]

[LogCollector]
SaveLevel = EXTRA
PrintLevel = INFO

[Producer.TLU]
AndMask = 0xc # 9x9 mm scintillaotr for trigger
#AndMask = 0xf # 4x4 mm scintillator for trigger
OrMask = 0
VetoMask = 0
# EUDRB plugged into DUT#4 , FORTIS plugged into DUT#1, SiLC plugged into DUT#0 
#DutMask = 20 # EUDRB, FORTIS, SiLC in
DutMask = 17 # FORTIS, SiLC in
EnableDUTVeto = 2#0
TriggerInterval = 0
TrigRollover = 0
StrobePeriod = 16000000
StrobeWidth = 480000

[Producer.EUDRB]
Version = 2
Det = MIMOTEL
Mode = ZS
Unsynchronized = 1
AdcDelay = 3
ClkSelect = 2
#Marker1 = 0xff
#Marker2 = 0xff
PostDetResetDelay = 4
PedestalFile = auto
IDOffset = 0
NumBoards = 6
Board0.Slot = 3
Board1.Slot = 5
Board2.Slot = 7
Board3.Slot = 9
Board4.Slot = 11
Board5.Slot = 13

[Producer.FORTIS]
# Need \ not / for directory name with Cygwin...
# ExecutableDirectory = /home/cussans/optodaq/halsall_test_v5/
ExecutableDirectory = /home/cussans/optodaq/MyF11/
# ExecutableDirectory = /home/cussans/optodaq/MyF10/
ExecutableProcessName = optodaqV.exe
#ExecutableFilename = test_run_128_block_mod_C2.bat
ExecutableFilename = test_run_512_128_block_mod_CX.bat
# ExecutableFilename = test_run_512_448_block_mod_full.bat
ExecutableArgs = 
NumRows = 512
NumColumns = 128
  65   Sat Aug 22 11:54:49 2009 Thomas Bergauercommonbeam profile    

beam shifted a bit in vertical direction downwards since 21. August 09 evening

Beam configuration:

Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008

Attachment 1: 20090822_1150_beam_conditions.jpg
20090822_1150_beam_conditions.jpg
ELOG V3.1.5-fc6679b