ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
76
|
Sat Aug 22 23:06:22 2009 |
Christian Irmler | BELLE | pedestal correction 40 MHz transparent mode + cooling | pedcorr007 | | 22.08.2009 23:04:29 | 22.08.2009 23:13:51 | Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction
chiller set to 13 deg, 2900 rpm |
82
|
Sun Aug 23 17:18:25 2009 |
Christian Irmler | Pt_ITE512 | pedestal correction | pedcorr008 | | 23.08.2009 17:17:36 | | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
83
|
Sun Aug 23 17:19:50 2009 |
Christian Irmler | Pt_ITE512 | internal calibration | cal011 | | 23.08.2009 16:30:43 | 23.08.2009 17:02:14 | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
103
|
Tue Aug 25 20:21:31 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode | run042 | 85189 | 25.08.2009 20:18:18 | 26.08.2009 01:27:12 | Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
no cooling
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
104
|
Wed Aug 26 01:32:25 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run043 | 100600 | 26.08.2009 01:46:38 | 26.08.2009 07:10:14 | Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
105
|
Wed Aug 26 07:19:42 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run044 | 13504 | 26.08.2009 07:18:19 | 26.08.2009 08:46:11 (beam shut down @ 8:00) | Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
84
|
Sun Aug 23 23:38:27 2009 |
Georg Auzinger | | Phone numbers | | | | | Georg #70
Wolfgang - Building: 41, Room: 204, Tel: ?
Manfred: Building 38, Room 522, Tel: 70522
Chrisu: B39, room 309, Tel: 79309
Bergi: Tel Zimmer: 79112, Handy: 16-2471
Maks: Tel Zimmer: 79117 |
85
|
Mon Aug 24 11:58:23 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 1deg air | run025 | 20k | 24.08.09 11:24:33 | 24.08.09 12:40:25 | Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
86
|
Mon Aug 24 13:01:14 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 3deg air | run026 | 20k | 24.08.09 11:24:33 | 24.08.2009 14:11:45 | Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
87
|
Mon Aug 24 14:23:01 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 5deg air | run027 | 20k | 24.08.2009 14:27:07 | 24.08.2009 15:26:20 | Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
88
|
Mon Aug 24 15:28:49 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 7deg air | run028 | 20k | 24.08.09 15:39:50 | 24.08.09 16:40:54 | Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
89
|
Mon Aug 24 16:44:36 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 9deg air | run029 | 20k | 24.08.09 17:03:21 | 24.08.09 18:20:55 | Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
90
|
Mon Aug 24 18:30:07 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 11deg air | run030 | 20k | 24.08.09 18:45:09 | 24.08.09 20:37:04 | Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
91
|
Mon Aug 24 22:04:56 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 13deg air | run031 | 20k | 24.08.09 20:53:50 | 24.08.09 22:00:49 | Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
92
|
Mon Aug 24 22:12:22 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 15deg air | run032 | 19456 | 24.08.09 22:18:08 | 24.08.09 23:25:52 | Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
no beam
--> run stopped after 19456 events |
93
|
Tue Aug 25 01:33:18 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 0deg air | run033 | 151724 | 25.08.09 01:35:18 | 25.08.2009 08:44:27 | Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
32
|
Thu Aug 20 15:50:58 2009 |
Manfred Valentan | alignment_laser | slow control: HV graph | all alignemnt_laser runs | | 20.08.09 10:36 | 4h 43m 52s later | blue graph: h03
white graph: h04 |
Attachment 1: slow_control_alignment_sensors.gif
| |
33
|
Thu Aug 20 15:54:45 2009 |
Manfred Valentan | BELLE | temp/humidty logger data | | | | | position: underneath telescope. dewpoint ~ 15 degree
test with chiller: running 4 hours at 15 degress: NO condensation on alu pipe |
Attachment 1: easylog_under_telescope.gif
| |
35
|
Thu Aug 20 19:12:23 2009 |
Manfred Valentan | alignment_laser | background mesurement with laser OFF | laser002 | 10000 | 20.08.2009 19:10:09 | 20.08.2009 19:11:57 | |
36
|
Thu Aug 20 19:15:29 2009 |
Manfred Valentan | alignment_laser | laser on | laser003 | 10000 | 20.08.2009 19:13:04 | 20.08.2009 19:14:49 | HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA,
Photodiode: pulse_width=15ns, amplitude=7mV
same settings as run laser001 |
|