| ID | Date | Author | Project  | Subject | Run Number | Events | StartTime | EndTime | 
| 1 | Mon Jul  6 12:22:47 2009 | Stephan Hänsel | SiLC | Measurements - hybrids with APV |  |  |  |  | 
| Pt Modules:    Optical Modules:   ITE Modules:  | 
| 2 | Mon Jul  6 12:24:53 2009 | Stephan Hänsel | SiLC | Module Drawings |  |  |  |  | 
|  Pt Modules:    Optical Modules:   ITE Modules: :   | 
| 5 | Mon Jul  6 12:29:20 2009 | Stephan Hänsel | SiLC | Sensors - layout |  |  |  |  | 
|  Pt Modules:  CMS OB1 Sensors:    Optical Modules:  Sensors:     ITE Modules:  | 
| Attachment 1: Wafer-Screenshot.png | 
|  | 
| 7 | Mon Jul  6 16:22:36 2009 | Stephan Hänsel | SiLC | Measurements - Sensors |  |  |  |  | 
|  Pt Modules:    Optical Modules:    ITE Modules:      | 
| 8 | Mon Jul  6 16:23:51 2009 | Stephan Hänsel | SiLC | Module Components |  |  |  |  | 
|  Pt Modules:  Pt-1:
 hybrid:  h01-4APV
 bottom sensor:  30210331516116
 top sensor: 30210332911309
 
 Pt-2:
 hybrid:  h02-4APV
 bottom sensor:  30210331415917
 top sensor:  30210314845402
    Optical Modules:  Opt_AC-Test-1:
 hybrid:  h21-2APV
 sensor:  HPK-ILC-TS-SPL-6687-05
 
 Opt_AC-Test-2:
 hybrid:  h22-2APV
 sensor:  HPK-ILC-TS-SPL-6687-07
 modules with SiLC alignment sensors:
 Opt-1:
 hybrid: h03
 sensor: HPK-SPL-6686-03
 
 Opt-2:
 hybrid: h04
 sensor: HPK-SPL-6686-07
   ITE Modules:  | 
| 9 | Thu Jul  9 10:29:58 2009 | Stephan Hänsel | SiLC | Measurements - Modules |  |  |  |  | 
|  Pt Modules:  - Sensoren sind Luftfeuhtigkeitsempfindlich - die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren  small Problems:   Optical Modules:  small Problems with h03-Module: ITE Modules:    | 
| 17 | Wed Aug 19 15:41:17 2009 | Wolfgang Kiesenhofer | SiLC | angle scan templates |  |  |  |  | 
| Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen auf die Beam Richtung). | 
| Attachment 1: angle_scan0.pdf | 
| Attachment 2: angle_scan5.pdf | 
| Attachment 3: angle_scan10.pdf | 
| Attachment 4: angle_scan15.pdf | 
| Attachment 5: angle_scan20.pdf | 
| Attachment 6: angle_scan25.pdf | 
| Attachment 7: angle_scan30.pdf | 
| Attachment 8: angle_scan35.pdf | 
| Attachment 9: angle_scan40.pdf | 
| Attachment 10: angle_scan45.pdf | 
| Attachment 11: angle_scan50.pdf | 
| Attachment 12: angle_scan55.pdf | 
| Attachment 13: angle_scan60.pdf | 
| 14 | Fri Aug 14 19:35:43 2009 | Thomas Bergauer | Pt_ITE512 | intcal |  |  |  |  | 
| HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off) h01-Pt: 10uA h02-Pt: 1.6uA 3 SiLC DUTs mit je ca. 38nA h07-ITE-512: 3.77uA h05-ITE-512: breakthrough h06-ITE-512: breakthrough | 
| 67 | Sat Aug 22 13:28:53 2009 | Wolfgang Kiesenhofer | Pt_ITE512 | runlist for pt-module angle-scan |  |  |  |  | 
| Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6 
    
        
            | run | angle[deg] | pos | height (xy-table) | importance | events |  
            | 1 | 1 | center module |  | + | 10k |  
            | 2 | 2 | center module |  | + | 10k |  
            | 3 | 3 | center module |  | + | 10k |  
            | 4 | 4 | center module |  | + | 10k |  
            | 5 | 5 | center module |  | + | 10k |  
            | 6 | 6 | center module |  | + | 10k |  
            | 7 | 7 | center module |  | + | 10k |  
            | 8 | 8 | center module |  | + | 10k |  
            | 9 | 9 | center module |  | + | 10k |  
            | 10 | 10 | center module |  | + | 10k |  
            | 11 | 12 | center module |  | + | 10k |  
            | 12 | 14 | center module |  | - | 10k |  
            | 13 | 16 | center module |  | - | 10k |  
            | 14 | 0 | center module |  | + | ? depends on ite512 |  
            | 15 | 0 | upper pos |  | + | 10k |  
            | 16 | 0 | lower pos |  | + | 10k |    | 
| 80 | Sun Aug 23 13:15:42 2009 | Marko Dragicevic | Pt_ITE512 | Current and Humindity during first Run |  |  |  |  | 
| Current of Pt modules during first runData of the run was dicarded. Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure. Timescales for RH and I graph are different!!! after 3 hours first bottle of compressed air (dewpoint -170 degree C) is gone and sensor Pt-h01 starts to fluctuate again   Current of ITE512 plus 2 SiLC08 modulesHV=70V, Current: 25uA first, 29uA then, 35uA latest. now stable   | 
| Attachment 1: IandRH_first_Pt_run.png | 
|  | 
| Attachment 2: Picture_1.png | 
|  | 
| 81 | Sun Aug 23 14:03:14 2009 | Manfred Valentan | Pt_ITE512 | Pt & ITE512 center position, 1 deg | run024 | 20000 | 23.08.2009 13:59:06 |  | 
| Pt: 1 Grad, HV=200V, 0% RHITE512: HV=70V
 X-Y-Table: x=99.6, y=36
 Telescope: run7316
 | 
| 82 | Sun Aug 23 17:18:25 2009 | Christian Irmler | Pt_ITE512 | pedestal correction | pedcorr008 |  | 23.08.2009  17:17:36 |  | 
| Pt: 1 Grad, HV=200V, 0% RH, intcal, beam offITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 | 
| 83 | Sun Aug 23 17:19:50 2009 | Christian Irmler | Pt_ITE512 | internal calibration | cal011 |  | 23.08.2009  16:30:43 | 23.08.2009  17:02:14 | 
| Pt: 1 Grad, HV=200V, 0% RH, intcal, beam offITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 | 
| 85 | Mon Aug 24 11:58:23 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 1deg air | run025 | 20k | 24.08.09 11:24:33 | 24.08.09 12:40:25 | 
| Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 86 | Mon Aug 24 13:01:14 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 3deg air | run026 | 20k | 24.08.09 11:24:33 | 24.08.2009  14:11:45 | 
| Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 87 | Mon Aug 24 14:23:01 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 5deg air | run027 | 20k | 24.08.2009  14:27:07 | 24.08.2009  15:26:20 | 
| Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 88 | Mon Aug 24 15:28:49 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 7deg air | run028 | 20k | 24.08.09 15:39:50 | 24.08.09 16:40:54 | 
| Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 89 | Mon Aug 24 16:44:36 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 9deg air | run029 | 20k | 24.08.09 17:03:21 | 24.08.09 18:20:55 | 
| Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 90 | Mon Aug 24 18:30:07 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 11deg air | run030 | 20k | 24.08.09 18:45:09 | 24.08.09  20:37:04 | 
| Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 91 | Mon Aug 24 22:04:56 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 13deg air | run031 | 20k | 24.08.09 20:53:50 | 24.08.09 22:00:49 | 
| Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 |