| 
|  Mon Jul  6 12:22:47 2009, Stephan Hänsel, SiLC, Measurements - hybrids with APV, , , , |  | Pt Modules: Hybrids with 4 APVs:
 h01-4APV
 
 h02-4APV
 
 
 |  |  Mon Jul  6 12:24:53 2009, Stephan Hänsel, SiLC, Module Drawings, , , , |  | Pt Modules: 
 3D-View
 
 technical drawings:
 
 |  |  Mon Jul  6 12:29:20 2009, Stephan Hänsel, SiLC, Sensors - layout, , , ,   |  | Pt Modules: CMS OB1 Sensors:
 
 CMS OB1 Dimensions
 
 
 |  |  Mon Jul  6 16:22:36 2009, Stephan Hänsel, SiLC, Measurements - Sensors, , , , |  | Pt Modules: OB1-Sensors:
 30210331516116
 30210331415917
 
 30210314845402
 30210332911309
 
 
 |  |  Mon Jul  6 16:23:51 2009, Stephan Hänsel, SiLC, Module Components, , , , |  | Pt Modules: 
 Pt-1:
 |  |  Thu Jul  9 10:29:58 2009, Stephan Hänsel, SiLC, Measurements - Modules, , , , |  | Pt Modules: - Sensoren sind Luftfeuhtigkeitsempfindlich
 - die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren
 |  |  Wed Aug 19 15:41:17 2009, Wolfgang Kiesenhofer, SiLC, angle scan templates, , , ,  13x   |  | Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen auf die Beam Richtung).
 |  |  Fri Aug 14 19:35:43 2009, Thomas Bergauer, Pt_ITE512, intcal, , , , |  | HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off) h01-Pt: 10uA
 h02-Pt: 1.6uA
 |  |  Sat Aug 22 13:28:53 2009, Wolfgang Kiesenhofer, Pt_ITE512, runlist for pt-module angle-scan, , , , |  | Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6 
 
 
 run
 angle[deg]
 
 |  |  Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , ,    |  | Current of Pt modules during first run Data of the run was dicarded.
 Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.
 Timescales for RH and I graph are different!!!
 |  |  Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06, |  | Pt: 1 Grad, HV=200V, 0% RH ITE512: HV=70V
 X-Y-Table: x=99.6, y=36
 |  |  Sun Aug 23 17:18:25 2009, Christian Irmler, Pt_ITE512, pedestal correction, pedcorr008, , 23.08.2009  17:17:36 , |  | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off ITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 |  |  Sun Aug 23 17:19:50 2009, Christian Irmler, Pt_ITE512, internal calibration, cal011, , 23.08.2009  16:30:43, 23.08.2009  17:02:14 |  | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off ITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 |  |  Mon Aug 24 11:58:23 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 1deg air, run025, 20k, 24.08.09 11:24:33, 24.08.09 12:40:25 |  | Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 |  |  Mon Aug 24 13:01:14 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 3deg air, run026, 20k, 24.08.09 11:24:33, 24.08.2009  14:11:45 |  | Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 |  |  Mon Aug 24 14:23:01 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 5deg air, run027, 20k, 24.08.2009  14:27:07, 24.08.2009  15:26:20 |  | Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 |  |  Mon Aug 24 15:28:49 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 7deg air, run028, 20k, 24.08.09 15:39:50, 24.08.09 16:40:54 |  | Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 |  |  Mon Aug 24 16:44:36 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 9deg air, run029, 20k, 24.08.09 17:03:21, 24.08.09 18:20:55 |  | Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 |  |  Mon Aug 24 18:30:07 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 11deg air, run030, 20k, 24.08.09 18:45:09, 24.08.09  20:37:04 |  | Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 |  |  Mon Aug 24 22:04:56 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 13deg air, run031, 20k, 24.08.09 20:53:50, 24.08.09 22:00:49 |  | Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 |  |