ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Text |
|
1
|
Mon Jul 6 12:22:47 2009 |
Stephan Hänsel | SiLC | Measurements - hybrids with APV | | | | | Pt Modules:
Hybrids with 4 APVs:
|
|
2
|
Mon Jul 6 12:24:53 2009 |
Stephan Hänsel | SiLC | Module Drawings | | | | | Pt Modules:
3D-View
technical drawings:
|
|
5
|
Mon Jul 6 12:29:20 2009 |
Stephan Hänsel | SiLC | Sensors - layout | | | | | Pt Modules:
CMS OB1 Sensors:
|
|
7
|
Mon Jul 6 16:22:36 2009 |
Stephan Hänsel | SiLC | Measurements - Sensors | | | | | Pt Modules:
OB1-Sensors:
30210331516116 |
|
8
|
Mon Jul 6 16:23:51 2009 |
Stephan Hänsel | SiLC | Module Components | | | | | Pt Modules:
Pt-1: |
|
9
|
Thu Jul 9 10:29:58 2009 |
Stephan Hänsel | SiLC | Measurements - Modules | | | | | Pt Modules:
- Sensoren sind Luftfeuhtigkeitsempfindlich |
|
17
|
Wed Aug 19 15:41:17 2009 |
Wolfgang Kiesenhofer | SiLC | angle scan templates | | | | | Linie am rechten Seitenrand (in der Vorschau
unten leider nicht gut zu sehen) sollte mit
dem rechten Rand der Basisplatte abschließen |
13x |
14
|
Fri Aug 14 19:35:43 2009 |
Thomas Bergauer | Pt_ITE512 | intcal | | | | | HV=100V except h05-ITE-512 and h06-ITE-512
(runaway, HV off)
h01-Pt: 10uA |
|
67
|
Sat Aug 22 13:28:53 2009 |
Wolfgang Kiesenhofer | Pt_ITE512 | runlist for pt-module angle-scan | | | | | Preliminary run
list for pt-modules + ite512 + silc1, silc2,
silc5, silc6 |
|
80
|
Sun Aug 23 13:15:42 2009 |
Marko Dragicevic | Pt_ITE512 | Current and Humindity during first Run | | | | | Current of Pt modules during first run
Data
of the run was dicarded.
Compressed air flow was at ~2 bars |
|
81
|
Sun Aug 23 14:03:14 2009 |
Manfred Valentan | Pt_ITE512 | Pt & ITE512 center position, 1 deg | run024 | 20000 | 23.08.2009 13:59:06 | | Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36 |
|
82
|
Sun Aug 23 17:18:25 2009 |
Christian Irmler | Pt_ITE512 | pedestal correction | pedcorr008 | | 23.08.2009 17:17:36 | | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam
off
ITE512: HV=70V, |
|
83
|
Sun Aug 23 17:19:50 2009 |
Christian Irmler | Pt_ITE512 | internal calibration | cal011 | | 23.08.2009 16:30:43 | 23.08.2009 17:02:14 | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam
off
ITE512: HV=70V, |
|
85
|
Mon Aug 24 11:58:23 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 1deg air | run025 | 20k | 24.08.09 11:24:33 | 24.08.09 12:40:25 | Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
86
|
Mon Aug 24 13:01:14 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 3deg air | run026 | 20k | 24.08.09 11:24:33 | 24.08.2009 14:11:45 | Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
87
|
Mon Aug 24 14:23:01 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 5deg air | run027 | 20k | 24.08.2009 14:27:07 | 24.08.2009 15:26:20 | Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
88
|
Mon Aug 24 15:28:49 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 7deg air | run028 | 20k | 24.08.09 15:39:50 | 24.08.09 16:40:54 | Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
89
|
Mon Aug 24 16:44:36 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 9deg air | run029 | 20k | 24.08.09 17:03:21 | 24.08.09 18:20:55 | Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
90
|
Mon Aug 24 18:30:07 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 11deg air | run030 | 20k | 24.08.09 18:45:09 | 24.08.09 20:37:04 | Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
91
|
Mon Aug 24 22:04:56 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 13deg air | run031 | 20k | 24.08.09 20:53:50 | 24.08.09 22:00:49 | Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
|