Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 2 of 6  Not logged in ELOG logo
Entry  Mon Jul 6 12:22:47 2009, Stephan Hänsel, SiLC, Measurements - hybrids with APV, , , ,  

Pt Modules:

Optical Modules:

ITE Modules:

Entry  Mon Jul 6 12:24:53 2009, Stephan Hänsel, SiLC, Module Drawings, , , ,  

Pt Modules:

Optical Modules:

ITE Modules: :

 

Entry  Mon Jul 6 12:29:20 2009, Stephan Hänsel, SiLC, Sensors - layout, , , ,  Wafer-Screenshot.png

Pt Modules:

CMS OB1 Sensors:

 

Optical Modules:

Sensors:

 

ITE Modules:

Entry  Mon Jul 6 16:22:36 2009, Stephan Hänsel, SiLC, Measurements - Sensors, , , ,  

Pt Modules:

 

Optical Modules:

 

ITE Modules:

 

 

Entry  Mon Jul 6 16:23:51 2009, Stephan Hänsel, SiLC, Module Components, , , ,  

Pt Modules:


Pt-1:
hybrid: h01-4APV
bottom sensor: 30210331516116
top sensor: 30210332911309

Pt-2:
hybrid: h02-4APV
bottom sensor: 30210331415917
top sensor: 30210314845402

 

Optical Modules:


Opt_AC-Test-1:
hybrid: h21-2APV
sensor: HPK-ILC-TS-SPL-6687-05

Opt_AC-Test-2:
hybrid: h22-2APV
sensor: HPK-ILC-TS-SPL-6687-07


modules with SiLC alignment sensors:
Opt-1:
hybrid: h03
sensor: HPK-SPL-6686-03

Opt-2:
hybrid: h04
sensor: HPK-SPL-6686-07

 

ITE Modules:

Entry  Thu Jul 9 10:29:58 2009, Stephan Hänsel, SiLC, Measurements - Modules, , , ,  

Pt Modules:

- Sensoren sind Luftfeuhtigkeitsempfindlich

- die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren 

small Problems:

 

Optical Modules:

small Problems with h03-Module:

ITE Modules:

 

Entry  Wed Aug 19 15:41:17 2009, Wolfgang Kiesenhofer, SiLC, angle scan templates, , , ,  13x

Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen auf die Beam Richtung).

Entry  Fri Aug 14 19:35:43 2009, Thomas Bergauer, Pt_ITE512, intcal, , , ,  

HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)

h01-Pt: 10uA

h02-Pt: 1.6uA

3 SiLC DUTs mit je ca. 38nA

h07-ITE-512: 3.77uA

h05-ITE-512: breakthrough

h06-ITE-512: breakthrough

Entry  Sat Aug 22 13:28:53 2009, Wolfgang Kiesenhofer, Pt_ITE512, runlist for pt-module angle-scan, , , ,  

Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6

run angle[deg] pos height (xy-table) importance events
1 1 center module   + 10k
2 2 center module   + 10k
3 3 center module   + 10k
4 4 center module   + 10k 
5 5 center module   + 10k 
6 6 center module   + 10k 
7 7 center module   + 10k 
8 8 center module   +  10k
9 9 center module   +  10k
10 10 center module   +  10k
11 12 center module   + 10k 
12 14 center module   - 10k 
13 16 center module   - 10k
14 0 center module   + ? depends on ite512
15 0 upper pos   + 10k
16 0 lower pos   + 10k

 

Entry  Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , ,  IandRH_first_Pt_run.pngPicture_1.png

Current of Pt modules during first run

Data of the run was dicarded.

Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.

Timescales for RH and I graph are different!!!

after 3 hours first bottle of compressed air (dewpoint -170 degree C) is gone and sensor Pt-h01 starts to fluctuate again

 

Current of ITE512 plus 2 SiLC08 modules

HV=70V, Current: 25uA first, 29uA then, 35uA latest. now stable

 

Entry  Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06,  

Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
Telescope: run7316

Entry  Sun Aug 23 17:18:25 2009, Christian Irmler, Pt_ITE512, pedestal correction, pedcorr008, , 23.08.2009 17:17:36 ,  

Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

Entry  Sun Aug 23 17:19:50 2009, Christian Irmler, Pt_ITE512, internal calibration, cal011, , 23.08.2009 16:30:43, 23.08.2009 17:02:14 

Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36

Entry  Mon Aug 24 11:58:23 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 1deg air, run025, 20k, 24.08.09 11:24:33, 24.08.09 12:40:25 

Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 13:01:14 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 3deg air, run026, 20k, 24.08.09 11:24:33, 24.08.2009 14:11:45 

Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 14:23:01 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 5deg air, run027, 20k, 24.08.2009 14:27:07, 24.08.2009 15:26:20 

Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 15:28:49 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 7deg air, run028, 20k, 24.08.09 15:39:50, 24.08.09 16:40:54 

Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 16:44:36 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 9deg air, run029, 20k, 24.08.09 17:03:21, 24.08.09 18:20:55 

Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 18:30:07 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 11deg air, run030, 20k, 24.08.09 18:45:09, 24.08.09 20:37:04 

Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
Entry  Mon Aug 24 22:04:56 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 13deg air, run031, 20k, 24.08.09 20:53:50, 24.08.09 22:00:49 

Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV

ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
ELOG V3.1.5-fc6679b