Thu Aug 20 15:50:58 2009, Manfred Valentan, alignment_laser, slow control: HV graph, all alignemnt_laser runs, , 20.08.09 10:36, 4h 43m 52s later  
 |  
blue graph: h03 
white graph: h04  |  
   Wed Aug 26 07:19:42 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode + cooling, run044, 13504, 26.08.2009  07:18:19, 26.08.2009  08:46:11  (beam shut down @ 8:00) 
 |  
Belle DUT, HV=80V,  31.8 MHz, 120 GeV 
6 samples, transparent mode 
w cooling, chiller set to 13 deg, 2900 rpm 
after realignement of modules 
new beam spot:  
 
    
        
            APV # 
             | 
            n-side 
             | 
            p-side 
             | 
         
    
    
        
            JP 
             | 
            1/2 
             | 
            1/2 
             | 
         
        
            Origami 
             | 
            2/3 
             | 
            1/2 | 
         
        
            Flex 
             | 
            1/2 
             | 
            1/2 | 
         
        
            Micron 
             | 
            0/1 
             | 
            1/2 | 
         
    
 
   |  
   Wed Aug 26 01:32:25 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode + cooling, run043, 100600, 26.08.2009  01:46:38 , 26.08.2009  07:10:14 
 |  
Belle DUT, HV=80V,  40 MHz, 120 GeV 
6 samples, transparent mode 
w cooling, chiller set to 13 deg, 2900 rpm 
after realignement of modules 
new beam spot:  
 
    
        
            APV # 
             | 
            n-side 
             | 
            p-side 
             | 
         
    
    
        
            JP 
             | 
            1/2 
             | 
            1/2 
             | 
         
        
            Origami 
             | 
            2/3 
             | 
            1/2 | 
         
        
            Flex 
             | 
            1/2 
             | 
            1/2 | 
         
        
            Micron 
             | 
            0/1 
             | 
            1/2 | 
         
    
 
   |  
   Tue Aug 25 20:21:31 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode, run042, 85189, 25.08.2009  20:18:18, 26.08.2009  01:27:12 
 |  
Belle DUT, HV=80V,  40 MHz, 120 GeV 
6 samples, transparent mode 
no cooling 
after realignement of modules 
new beam spot:  
 
    
        
            APV # 
             | 
            n-side 
             | 
            p-side 
             | 
         
    
    
        
            JP 
             | 
            1/2 
             | 
            1/2 
             | 
         
        
            Origami 
             | 
            2/3 
             | 
            1/2 | 
         
        
            Flex 
             | 
            1/2 
             | 
            1/2 | 
         
        
            Micron 
             | 
            0/1 
             | 
            1/2 | 
         
    
 
   |  
   Tue Aug 25 15:33:07 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 12deg NO air! , run039, 20k, 25.08.2009 15:35, 25.08.2009 17:10 
 |  
Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV 
ITE512: HV=70V, I=50muA 
X-Y-Table: x=99.6, y=36  |  
   Tue Aug 25 17:14:52 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 17deg NO air!, run040, 20k, 25.08.2009  17:17:11, 25.08.2009  18:08:57  
 |  
Pt: 17 Grad, HV=200V, 36.5% (start run) to xx.1% (end run) RH, beam on, 120GeV 
ITE512: HV=70V, I=51muA 
X-Y-Table: x=99.6, y=36  |  
   Tue Aug 25 13:48:30 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 10deg  NO air!, run038, 20k, 25.08.2009  13:54:54, 25.08.2009  15:22:38 
 |  
Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV 
ITE512: HV=70V, I=50muA 
X-Y-Table: x=99.6, y=36  |  
   Tue Aug 25 12:30:04 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 8deg  NO air!, run037, 20k, 25.08.2009  12:45, 25.08.2009  13:40:13 
 |  
Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV 
ITE512: HV=70V, I=49.1muA 
X-Y-Table: x=99.6, y=36  |  
   Tue Aug 25 11:26:23 2009, Thomas Bergauer, Pt_ITE512, Pt_ITE512 6deg NO air!, run036, 20k, 25.08.2009 11:25, 25.08.2009  12:19:55 
 |  
Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36 
MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD |  
   Tue Aug 25 09:53:16 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 4deg  NO air!, run035, 20k, 25.08.2009  09:50, 25.08.2009  11:00 
 |  
Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36  |  
   Tue Aug 25 01:33:18 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 0deg air, run033, 151724, 25.08.09 01:35:18, 25.08.2009  08:44:27 
 |  
Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36  |  
   Tue Aug 25 18:22:25 2009, Manfred Valentan, Pt_ITE512, Pt_ITE512 40deg NO air! (for calibration), run041, 10k, 25.08.2009 18:20:30, 25.08.2009 
 |  
Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV 
ITE512: HV=70V, I=51muA 
X-Y-Table: x=99.6, y=36  |  
   Tue Aug 25 09:01:12 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 2deg air , run034, 20k, 25.08.09 08:56:18 , 25.08.09 09:45:  
 |  
Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36  |  
   Mon Aug 24 14:23:01 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 5deg air, run027, 20k, 24.08.2009  14:27:07, 24.08.2009  15:26:20 
 |  
Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36  |  
   Mon Aug 24 13:01:14 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 3deg air, run026, 20k, 24.08.09 11:24:33, 24.08.2009  14:11:45 
 |  
Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36  |  
   Mon Aug 24 22:12:22 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 15deg air, run032, 19456, 24.08.09 22:18:08, 24.08.09 23:25:52 
 |  
Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36 
  
no beam 
--> run stopped after 19456 events  |  
   Mon Aug 24 22:04:56 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 13deg air, run031, 20k, 24.08.09 20:53:50, 24.08.09 22:00:49 
 |  
Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36  |  
   Mon Aug 24 16:44:36 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 9deg air, run029, 20k, 24.08.09 17:03:21, 24.08.09 18:20:55 
 |  
Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36  |  
   Mon Aug 24 15:28:49 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 7deg air, run028, 20k, 24.08.09 15:39:50, 24.08.09 16:40:54 
 |  
Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36  |  
   Mon Aug 24 11:58:23 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 1deg air, run025, 20k, 24.08.09 11:24:33, 24.08.09 12:40:25 
 |  
Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV 
ITE512: HV=70V, 
X-Y-Table: x=99.6, y=36  |  
 
 |