ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
32
|
Thu Aug 20 15:50:58 2009 |
Manfred Valentan | alignment_laser | slow control: HV graph | all alignemnt_laser runs | | 20.08.09 10:36 | 4h 43m 52s later | blue graph: h03
white graph: h04 |
Attachment 1: slow_control_alignment_sensors.gif
| |
105
|
Wed Aug 26 07:19:42 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run044 | 13504 | 26.08.2009 07:18:19 | 26.08.2009 08:46:11 (beam shut down @ 8:00) | Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
104
|
Wed Aug 26 01:32:25 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run043 | 100600 | 26.08.2009 01:46:38 | 26.08.2009 07:10:14 | Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
103
|
Tue Aug 25 20:21:31 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode | run042 | 85189 | 25.08.2009 20:18:18 | 26.08.2009 01:27:12 | Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
no cooling
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
100
|
Tue Aug 25 15:33:07 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 12deg NO air! | run039 | 20k | 25.08.2009 15:35 | 25.08.2009 17:10 | Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36 |
101
|
Tue Aug 25 17:14:52 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 17deg NO air! | run040 | 20k | 25.08.2009 17:17:11 | 25.08.2009 18:08:57 | Pt: 17 Grad, HV=200V, 36.5% (start run) to xx.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36 |
Attachment 1: Pt-17deg.png
| |
99
|
Tue Aug 25 13:48:30 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 10deg NO air! | run038 | 20k | 25.08.2009 13:54:54 | 25.08.2009 15:22:38 | Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36 |
98
|
Tue Aug 25 12:30:04 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 8deg NO air! | run037 | 20k | 25.08.2009 12:45 | 25.08.2009 13:40:13 | Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=49.1muA
X-Y-Table: x=99.6, y=36 |
97
|
Tue Aug 25 11:26:23 2009 |
Thomas Bergauer | Pt_ITE512 | Pt_ITE512 6deg NO air! | run036 | 20k | 25.08.2009 11:25 | 25.08.2009 12:19:55 | Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD |
96
|
Tue Aug 25 09:53:16 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 4deg NO air! | run035 | 20k | 25.08.2009 09:50 | 25.08.2009 11:00 | Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
93
|
Tue Aug 25 01:33:18 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 0deg air | run033 | 151724 | 25.08.09 01:35:18 | 25.08.2009 08:44:27 | Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
102
|
Tue Aug 25 18:22:25 2009 |
Manfred Valentan | Pt_ITE512 | Pt_ITE512 40deg NO air! (for calibration) | run041 | 10k | 25.08.2009 18:20:30 | 25.08.2009 | Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36 |
95
|
Tue Aug 25 09:01:12 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 2deg air | run034 | 20k | 25.08.09 08:56:18 | 25.08.09 09:45: | Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
87
|
Mon Aug 24 14:23:01 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 5deg air | run027 | 20k | 24.08.2009 14:27:07 | 24.08.2009 15:26:20 | Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
86
|
Mon Aug 24 13:01:14 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 3deg air | run026 | 20k | 24.08.09 11:24:33 | 24.08.2009 14:11:45 | Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
92
|
Mon Aug 24 22:12:22 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 15deg air | run032 | 19456 | 24.08.09 22:18:08 | 24.08.09 23:25:52 | Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
no beam
--> run stopped after 19456 events |
91
|
Mon Aug 24 22:04:56 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 13deg air | run031 | 20k | 24.08.09 20:53:50 | 24.08.09 22:00:49 | Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
89
|
Mon Aug 24 16:44:36 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 9deg air | run029 | 20k | 24.08.09 17:03:21 | 24.08.09 18:20:55 | Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
88
|
Mon Aug 24 15:28:49 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 7deg air | run028 | 20k | 24.08.09 15:39:50 | 24.08.09 16:40:54 | Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
85
|
Mon Aug 24 11:58:23 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 1deg air | run025 | 20k | 24.08.09 11:24:33 | 24.08.09 12:40:25 | Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
|