Tue Jun 3 00:20:06 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2828, 10000, 02.06.2008 23:55:06, 03.06.2008 00:18:56
|
SiLC beam test - CERN SPS June 2008
HV scan, HV=200V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
Tue Jun 3 12:32:51 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2831, 10000, 03.06.2008 12:31:42, 03.06.2008 13:19:36
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 10 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Tue Jun 3 13:28:15 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2832, 10000, 03.06.2008 13:24:07, 03.06.2008 13:53:18
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 20 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Tue Jun 3 14:12:02 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2833, 10000, 03.06.2008 14:10:40, 03.06.2008 14:29:26
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 30 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Tue Jun 3 14:59:14 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2834, 10000, 03.06.2008 14:56:32, 03.06.2008 15:15:37
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 40 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Tue Jun 3 15:39:57 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2835, 10000, 03.06.2008 15:36:47, 03.06.2008 15:55:34
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 50 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Tue Jun 3 16:14:26 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2836, 10000, 03.06.2008 16:13:18, 03.06.2008 16:33:20
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 60 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask
Please note that there are 8 modules read out in this run, but the last one (#7) is placed outside the beam and
hence does not provide any meaningful data. |
Tue Jun 3 16:53:20 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2837, 20000, 03.06.2008 16:49:40, 03.06.2008 17:26:49
|
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 0 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Sun Jun 1 08:06:57 2008, stephan hänsel, SiLC, APVDAQ + telescope (raw), run2721-2737, 22000, 01.06.2008 - 08:01:53, 01.06.2008 - 14:19:13
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
horizontal position ("target") = -7.5mm
this is LEFT position |
Sun Jun 1 16:06:42 2008, Markus Friedl, SiLC, APVDAQ + telescope (raw), run2741 - run2757, 22000, 01.06.2008 16:02:56, 01.06.2008 22:02:34
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
right from the start: no beam... |
Sun Jun 1 23:46:33 2008, Markus Friedl, SiLC, APVDAQ + telescope (raw), run2758 - run2783, 34873, 01.06.2008 23:44:57, 02.06.2008 10:08:46
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2.0 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
last raw run in RIGHT position |
Fri May 30 19:42:13 2008, stephan hänsel, SiLC, APVDAQ only, run0001, 51803, 30.05.2008 19:38:04, 30.05.2008 22:54:59
|
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope
terminated after 51803 events due to beam drop out @ 22.00h |
Sun Jun 1 14:58:53 2008, Markus Friedl, SiLC, APVDAQ only, ped002, 10000, 01.06.2008 14:55:31, 01.06.2008 14:59:06
|
SiLC beam test - CERN SPS June 2008 - PEDESTAL
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
software trigger
no telescope
PEDESTAL with BEAM (10k events) @ LEFT |
Sun Jun 1 15:02:51 2008, Markus Friedl, SiLC, APVDAQ only, ped003, 10000, 01.06.2008 15:00:54, 01.06.2008 15:04:14
|
SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
software trigger
no telescope
PEDESTAL WITH BEAM (10k) @ MID |
Sun Jun 1 23:20:10 2008, Markus Friedl, SiLC, APVDAQ only, ped004, 10000, 01.06.2008 23:16:52, 01.06.2008 23:19:59
|
SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
software trigger
no telescope
this is RIGHT position |
Tue Jun 3 09:12:42 2008, Markus Friedl, BELLE, APVDAQ only, run0005, 45020, 03.06.2008 09:11:30, 03.06.2008 09:24:42
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
SAME AS PREVIOUS, BUT 0-SUP WITHOUT TELESCOPE
stuck after 45020 events with the repeated message
***WARNING*** FIFO3 empty, FADC 0. Event discarded, reset sent.
to be investigated. |
Tue Jun 3 09:27:27 2008, Markus Friedl, BELLE, APVDAQ only, run0006, 23929, 03.06.2008 09:26:16, 03.06.2008 09:34:22
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
RETRY
STUCK again after some time - now adding veto clear in error handling routine |
Tue Jun 3 09:57:17 2008, Markus Friedl, BELLE, APVDAQ only, run0007, 105000, 03.06.2008 09:40:18, 03.06.2008 10:12:48
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
RETRY after software bugfix - apparently works |
Tue Jun 3 10:58:54 2008, Markus Friedl, BELLE, APVDAQ only, ped007, 10000, 03.06.2008 10:53:04, 03.06.2008 10:58:47
|
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
beam on (lower intensity) |
Sun Jun 1 14:36:23 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0002, 100000, 01.06.2008 14:25:43, 01.06.2008 14:54:14
|
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-7.5 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is LEFT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~300 Hz during spill |
|