Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2008, Page 2 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun Jun 1 16:06:42 2008, Markus Friedl, SiLC, APVDAQ + telescope (raw), run2741 - run2757, 22000, 01.06.2008 16:02:56, 01.06.2008 22:02:34 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware

right from the start: no beam...
Entry  Sun Jun 1 18:23:38 2008, Markus Friedl, SiLC, Very simple tracking, run2719, 100000, ,  silc_verysimple_res_2REF4.pngsilc_verysimple_res_012REF4567.png
Very simple alignment (manual linear x direction shifting only, no rotation, assuming equal z spacing) and tracking.
Reference plane = Module 3 (~center)
Deviation calculated from track prediction using the other layers.
Simple Center-of-gravity algorithm (as of APVDAQ_Analysis), no eta applied.
Using only events which have exactly 1 hit per plane (~80% of all events).

Results: 
 Residual RMS = 4.99 um (REFERENCE against neighbor layers 2+4 only)
 Residual RMS = 6.35 um (REFERENCE against all 7 other layers) -> needs more sophisticated alignment
Entry  Sun Jun 1 23:20:10 2008, Markus Friedl, SiLC, APVDAQ only, ped004, 10000, 01.06.2008 23:16:52, 01.06.2008 23:19:59 
SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
software trigger
no telescope

this is RIGHT position
Entry  Sun Jun 1 23:23:16 2008, Markus Friedl, SiLC, APVDAQ only (0-sup), run0004, 100000, 01.06.2008 23:21:12, 01.06.2008 23:41:09 
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope

This is RIGHT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~430 Hz during spill (TLU says ~86 Hz)
Entry  Sun Jun 1 23:46:33 2008, Markus Friedl, SiLC, APVDAQ + telescope (raw), run2758 - run2783, 34873, 01.06.2008 23:44:57, 02.06.2008 10:08:46 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2.0 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware

last raw run in RIGHT position
Entry  Mon Jun 2 13:19:10 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2787, 30000, 02.06.2008 13:15:04, 02.06.2008 14:27:57 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=100V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12


Reference run with nominal HV after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 14:32:40 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2788, 10000, 02.06.2008 14:31:15, 02.06.2008 14:51:55 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=10V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 14:55:38 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2789, 10000, 02.06.2008 14:54:33, 02.06.2008 15:19:12 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=20V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 15:21:53 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2790, 10000, 02.06.2008 15:20:44, 02.06.2008 15:38:04 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=30V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 15:41:20 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2791, 10000, 02.06.2008 15:40:20, 02.06.2008 15:58:16 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=40V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 16:01:10 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2792, 4536, 02.06.2008 16:00:09, 02.06.2008 16:19:42 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

stopped after beam problem


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 21:37:10 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2821, 10000, 02.06.2008 21:32:57, 02.06.2008 21:51:55 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

re-try after several hours of beam down


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 21:54:34 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2822, 10000, 02.06.2008 21:53:37, 02.06.2008 22:10:53 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=60V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 22:13:17 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2823, 10000, 02.06.2008 22:12:44, 02.06.2008 22:34:49 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=70V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 22:37:13 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2824, 10000, 02.06.2008 22:36:37, 02.06.2008 22:53:15 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=80V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 22:55:49 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2825, 10000, 02.06.2008 22:55:03, 02.06.2008 23:12:09 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=90V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 23:14:58 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2826, 10000, 02.06.2008 23:14:19, 02.06.2008 23:31:29 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=120V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Mon Jun 2 23:34:29 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2827, 10000, 02.06.2008 23:33:40, 02.06.2008 23:52:04 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=150V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Tue Jun 3 00:20:06 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** HV-scan ***, run2828, 10000, 02.06.2008 23:55:06, 03.06.2008 00:18:56 
SiLC beam test - CERN SPS June 2008
HV scan,  HV=200V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


HV scan after re-arranging the modules:

               JURA
          | | |
          | | | | |
beam ---->| | | | | | | |
                | | | | |
                    | | |
          0 1 2 3 4 5 6 7
               SALEVE
Entry  Tue Jun 3 02:38:21 2008, Markus Friedl, BELLE, APVDAQ + telescope (0-sup), run2829, 105000, 03.06.2008 02:29:51, 03.06.2008 09:08:58 
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
ELOG V3.1.5-fc6679b