ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
47
|
Mon Jun 2 22:55:49 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2825 | 10000 | 02.06.2008 22:55:03 | 02.06.2008 23:12:09 |
SiLC beam test - CERN SPS June 2008
HV scan, HV=90V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
46
|
Mon Jun 2 22:37:13 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2824 | 10000 | 02.06.2008 22:36:37 | 02.06.2008 22:53:15 |
SiLC beam test - CERN SPS June 2008
HV scan, HV=80V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
45
|
Mon Jun 2 22:13:17 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2823 | 10000 | 02.06.2008 22:12:44 | 02.06.2008 22:34:49 |
SiLC beam test - CERN SPS June 2008
HV scan, HV=70V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
44
|
Mon Jun 2 21:54:34 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2822 | 10000 | 02.06.2008 21:53:37 | 02.06.2008 22:10:53 |
SiLC beam test - CERN SPS June 2008
HV scan, HV=60V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
43
|
Mon Jun 2 21:37:10 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2821 | 10000 | 02.06.2008 21:32:57 | 02.06.2008 21:51:55 |
SiLC beam test - CERN SPS June 2008
HV scan, HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
re-try after several hours of beam down
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
42
|
Mon Jun 2 16:01:10 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2792 | 4536 | 02.06.2008 16:00:09 | 02.06.2008 16:19:42 |
SiLC beam test - CERN SPS June 2008
HV scan, HV=50V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
stopped after beam problem
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
41
|
Mon Jun 2 15:41:20 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2791 | 10000 | 02.06.2008 15:40:20 | 02.06.2008 15:58:16 |
SiLC beam test - CERN SPS June 2008
HV scan, HV=40V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
40
|
Mon Jun 2 15:21:53 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2790 | 10000 | 02.06.2008 15:20:44 | 02.06.2008 15:38:04 |
SiLC beam test - CERN SPS June 2008
HV scan, HV=30V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
38
|
Mon Jun 2 14:55:38 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2789 | 10000 | 02.06.2008 14:54:33 | 02.06.2008 15:19:12 |
SiLC beam test - CERN SPS June 2008
HV scan, HV=20V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
37
|
Mon Jun 2 14:32:40 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2788 | 10000 | 02.06.2008 14:31:15 | 02.06.2008 14:51:55 |
SiLC beam test - CERN SPS June 2008
HV scan, HV=10V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
HV scan after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
36
|
Mon Jun 2 13:19:10 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** HV-scan *** | run2787 | 30000 | 02.06.2008 13:15:04 | 02.06.2008 14:27:57 |
SiLC beam test - CERN SPS June 2008
HV scan, HV=100V
8 modules, modules rearranged, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
Reference run with nominal HV after re-arranging the modules:
JURA
| | |
| | | | |
beam ---->| | | | | | | |
| | | | |
| | |
0 1 2 3 4 5 6 7
SALEVE |
35
|
Sun Jun 1 23:46:33 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (raw) | run2758 - run2783 | 34873 | 01.06.2008 23:44:57 | 02.06.2008 10:08:46 |
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2.0 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
last raw run in RIGHT position |
34
|
Sun Jun 1 23:36:21 2008 |
Christian Irmler | SiLC | HowTo analyse data | | | | |
The analysis consists of two stages:
- The first is zero supression an cluster finding done with "apvdaq_analysis_fadc" (Labwindows/CVI application)
- The second stage is hit time reconstruction done with ROOT. (hitfit)
Both are installed on EUDETMAC.
apvdaq_analysis_fadc:
- start apvdaq_analysis_fadc within the virtal Windows XP machine (parallels).
- select a runfile, e.g. run0001.dat
- select a propper calibration file, default is "cal002.out"
- select pedestal correction file, default is "pedcorr001.ped"
- enable "generate hit file and save results"
- click "Start"
- The result of the analyis is a file containing all hits above threshold, the filename is "xxxxxxx_cluster.hit", where xxxxxxx is the run name
- The data structure of the file is described at http://elog.hephy.at/testbeam-SPS08/04
- The file is located in the same folder as the raw data file (= data)
hitfit:
- Once apvdaq_analysis_fadc is finished, start a console window and change into the directory /Volumes/Data/eudet/APVDAQ
- execute ./hitfitrun nnnn, where nnnn is the run number
- results: file with fitted hits (data structure see http://elog.hephy.at/testbeam-SPS08/04) as well as several plots.
- file name: xxxxxxx_cluster.hit.fit, the file is located in the subdirectory output.
|
Attachment 1: analysis_howto.jpg
|
|
33
|
Sun Jun 1 23:23:16 2008 |
Markus Friedl | SiLC | APVDAQ only (0-sup) | run0004 | 100000 | 01.06.2008 23:21:12 | 01.06.2008 23:41:09 |
SiLC beam test - CERN SPS June 2008 - HIT MODE
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12 (manually)
no telescope
This is RIGHT position
APVDAQ runs in HIT MODE (=0-suppressed)
acquisition rate ~430 Hz during spill (TLU says ~86 Hz) |
32
|
Sun Jun 1 23:20:10 2008 |
Markus Friedl | SiLC | APVDAQ only | ped004 | 10000 | 01.06.2008 23:16:52 | 01.06.2008 23:19:59 |
SiLC beam test - CERN SPS June 2008 - PEDESTAL with beam
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
software trigger
no telescope
this is RIGHT position |
31
|
Sun Jun 1 20:13:37 2008 |
Eudet Telescope | SiLC | BZIP2 compressed APVDAQ data | | | | |
Processed APVDAQ data_cluster - in tar.bzip2 format:
- on machine: eudetmac001.cern.ch
- in directory: /Volumes/Data/eudet/APVDAQ/silc/data_bz2
- size reduction by factor 6
- in order to extract files, write: tar -xjf name.tar.bz2
Zbynek |
30
|
Sun Jun 1 18:23:38 2008 |
Markus Friedl | SiLC | Very simple tracking | run2719 | 100000 | | |
Very simple alignment (manual linear x direction shifting only, no rotation, assuming equal z spacing) and tracking.
Reference plane = Module 3 (~center)
Deviation calculated from track prediction using the other layers.
Simple Center-of-gravity algorithm (as of APVDAQ_Analysis), no eta applied.
Using only events which have exactly 1 hit per plane (~80% of all events).
Results:
Residual RMS = 4.99 um (REFERENCE against neighbor layers 2+4 only)
Residual RMS = 6.35 um (REFERENCE against all 7 other layers) -> needs more sophisticated alignment |
Attachment 1: silc_verysimple_res_2REF4.png
|
|
Attachment 2: silc_verysimple_res_012REF4567.png
|
|
29
|
Sun Jun 1 17:01:12 2008 |
Thomas Bergauer | SiLC | path do data | | | | |
The data of all runs are stored on eudetmac001.cern.ch:
APVDAQ: /Volumes/Data/eudet/APVDAQ/silc/data
Telescope data: /Volumes/Data/eudet/Data/testing
all data will be saved to an external Firewire disk (Vienna Backup) and to CASTOR |
28
|
Sun Jun 1 16:06:42 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (raw) | run2741 - run2757 | 22000 | 01.06.2008 16:02:56 | 01.06.2008 22:02:34 |
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: raw, new firmware
right from the start: no beam... |
27
|
Sun Jun 1 15:52:03 2008 |
Eudet Telescope | SiLC | Telescope Pedestal Run | run2738 | 1247 | 1.6.2008. 15:50 | 1.6.2008. 15:58 |
Telescope Pedestal Run
no DUTs!
no Beam!
Config File: test5boards.conf |