Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 8 of 10  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Fri Mar 14 22:20:25 2025, elog-producer, 1st tests with beam, 201, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 22:11:23, 14.03.2025 22:20:51, 9, HV, None,  tjmonopix2.conftjmonopix2_1.conf
automatic log for run 201
Comment:
Entry  Fri Mar 14 22:09:23 2025, elog-producer, 1st tests with beam, 200, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 22:04:01, 14.03.2025 22:09:49, 5, HV, None,  tjmonopix2.conftjmonopix2_1.conf
automatic log for run 200
Comment:
Entry  Sat Jun 21 22:04:52 2025, Julia Müllner, 124.4 MeV w slab, 20, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 22:09, 22:21, 12, , PTW Slabs, 0.5cm 

Recorded data: 20GB

Entry  Sat Mar 15 08:52:52 2025, RD50 Generic User, Alignment Run 800MeV, 2, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Medium, Proton, Good, 08:22, 9:40, 78, , ,  

RaMon Rate 400kHz

front sensors 200mu: ~10-20kHz pro Streifen

Comments:

In between run, sensors were shifted by 2mm to the left (left and right in online DAQ is mirrored)

 

Entry  Sat Jun 21 15:43:47 2025, Julia Müllner, 800MeV systemtest , 2, TOF-Cal GSI, 800 MeV, Low Flux High, Proton, Good, 16:02, 16:29, 27, , ,  

Threshold set to 1000

Factor 4 chosen for future runs, 80 GB in total recorded in this run

Entry  Sat Jun 21 21:47:40 2025, Julia Müllner, 124.4 MeV/u w 4slabs, 19, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 21:51, 22:05, 14, , PTW Slabs, 4cm 
 
Entry  Sat Jun 21 21:33:45 2025, Julia Müllner, 124.4 MeV/u w 3slabs, 18, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 21:34, 21:47, 13, , PTW Slabs, 3cm 
 
Entry  Sat Jun 21 21:11:04 2025, Julia Müllner, 124.4 MeV/u w 2slabs, 17, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 21:16, 21:29, 13, , PTW Slabs, 2cm 
 
Entry  Sat Jun 21 20:42:42 2025, Julia Müllner, 124.4 MeV/u w slabs, 16, TOF-Cal GSI, 124.4 MeV/u, Low Flux High, Helium, Good, 21:01, 21:10, 9, , PTW Slabs, 1cm 

1.041 WET RW3 (mm)

Entry  Sat Jun 21 20:32:58 2025, Julia Müllner, 402MeV systemtest , 15, TOF-Cal GSI, 402MeV/u, Low Flux High, Helium, Good, 20:35, 20:47, 12, , ,  

rejected roughly 10-20%, 8MHz beam

rejected quite a lot of data later -> eventloader restarted

Entry  Sat Mar 15 21:25:18 2025, RD50 Generic User, Slab Test Water 5cm, 14, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 21:26, 21:50, 24, , Plastic Water Slabs, 5cm 

RaMon rate: 4.5MHz

Entry  Sat Jun 21 20:24:05 2025, Julia Müllner, 205.2 MeV systemtest , 14, TOF-Cal GSI, 205.2 MeV/u, Low Flux High, Helium, Good, 20:24, 20:32, 8, , ,  

last events already with 400MeV/u

Entry  Sat Mar 15 21:29:28 2025, RD50 Generic User, Slab and rate testing (with Michael), 13, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 20:44, 21:22, 38, , Plastic Water Slabs, 4cm 

totzeit optimieren und deadtime finden

hex wert mal 10ns deadtime

13 ab file 10 besat effort
ab 52 wieder ohne best effort

600

Entry  Sat Jun 21 20:15:25 2025, Julia Müllner, 177.8 MeV systemtest , 13, TOF-Cal GSI, 177.8 MeV/u, Low Flux High, Helium, Good, 20:16, 20:23, 7, , ,  

16.2 GB collected

Entry  Sat Mar 15 19:37:42 2025, RD50 Generic User, Slab Test Water 4cm, 12, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 19:39, 20:41, 62, , Plastic Water Slabs, 4cm 

RaMon Rate 1.4MHz

Entry  Sat Jun 21 20:05:49 2025, Julia Müllner, 147.2 MeV systemtest , 12, TOF-Cal GSI, 147.2 MeV/u, Low Flux High, Helium, Good, 20:06, 20:15, 9, , ,  
 
Entry  Fri Mar 14 21:44:46 2025, elog-producer, validating setup, 118, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:44:20, 14.03.2025 21:45:12, 0, HV, None,  tjmonopix2.conf
automatic log for run 118
Comment:
tracker test without beam
Entry  Fri Mar 14 21:43:10 2025, elog-producer, validating setup, 117, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:42:46, 14.03.2025 21:43:36, 0, HV, None,  tjmonopix2.conf
automatic log for run 117
Comment:
tracker test without beam
Entry  Fri Mar 14 21:41:12 2025, elog-producer, validating setup, 116, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:41:05, 14.03.2025 21:41:38, 0, HV, None,  tjmonopix2.conf
automatic log for run 116
Comment:
tracker test without beam
Entry  Fri Mar 14 20:40:06 2025, elog-producer, validating setup, 112, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 20:07:47, 14.03.2025 20:40:32, 32, HV, None,  tjmonopix2.conf
automatic log for run 112
Comment:
still testing nonsense
ELOG V3.1.5-fc6679b