axis 1: 13
axis 2: 14
axis 2: 11
last files of hades81 are already for the next run, forgot to copy xml to 81.
Problems with the source -> no beam
Beam started at 1:50
30Mb/s Events and 1Mb/s rejected
axis 2: 8
axis 2: 5
PreTriggerWindow 640ns and PostTriggerWindow 85ns
axis 2: 2
axis 2: -1