axis 1: 13
axis 2: -1
axis 2: -4
16GB collected
RaMon Rate 1.4MHz
Threshold change from 50 to 500
10GB collected
new callibration was done, dimanond detector connected to readout
Threshold = 4000
thresholds were too low -> run was canceled
RaMon Rate 1.5MHz
Threshold set to 2000
50GB data collected
Room Entry Request: 18:21
Threshold set to 4000
40GB data collected
Threshold set to 3000
moved Ripple filters back in
100GB data collected
RaMon Rate 1.5 MHz
Data was good, we have to shuft the setup in x direction and slightly down. Enter room request 17:12.
Threshold set to 5000
dead channels on last LGAD, changed trigger from LGAD 12 to LGAD 11
RaMon Rate: 1.3MHz
Threshold set to 1000
Factor 4 chosen for future runs, 80 GB in total recorded in this run
Comments:
Tested different evenbuilder settings which made things worse, probably switch is the bottleneck, changed rate settings inbetween, requires sergey
RaMon Rate 4.5MHz
From File 7 until 21 optional false, and from 22 true (everything deleted)