Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 3 of 4  Not logged in ELOG logo
Entry  Fri Mar 14 23:21:11 2025, elog-producer, 1st tests with beam, 208, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 23:19:47, 14.03.2025 23:21:37, 1, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 208
Comment:
Entry  Fri Mar 14 22:47:46 2025, elog-producer, 1st tests with beam, 203, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 22:42:30, 14.03.2025 22:48:12, 5, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 203
Comment:
Entry  Fri Mar 14 22:41:04 2025, elog-producer, 1st tests with beam, 202, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 22:38:51, 14.03.2025 22:41:30, 2, HV, None,  tjmonopix2.initjmonopix2.conf
automatic log for run 202
Comment:
Entry  Fri Mar 14 22:20:25 2025, elog-producer, 1st tests with beam, 201, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 22:11:23, 14.03.2025 22:20:51, 9, HV, None,  tjmonopix2.conftjmonopix2_1.conf
automatic log for run 201
Comment:
Entry  Fri Mar 14 22:09:23 2025, elog-producer, 1st tests with beam, 200, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 22:04:01, 14.03.2025 22:09:49, 5, HV, None,  tjmonopix2.conftjmonopix2_1.conf
automatic log for run 200
Comment:
Entry  Sat Mar 15 08:52:52 2025, RD50 Generic User, Alignment Run 800MeV, 2, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Medium, Proton, Good, 08:22, 9:40, 78, , ,  

RaMon Rate 400kHz

front sensors 200mu: ~10-20kHz pro Streifen

Comments:

In between run, sensors were shifted by 2mm to the left (left and right in online DAQ is mirrored)

 

Entry  Sat Mar 15 21:25:18 2025, RD50 Generic User, Slab Test Water 5cm, 14, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 21:26, 21:50, 24, , Plastic Water Slabs, 5cm 

RaMon rate: 4.5MHz

Entry  Sat Mar 15 21:29:28 2025, RD50 Generic User, Slab and rate testing (with Michael), 13, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 20:44, 21:22, 38, , Plastic Water Slabs, 4cm 

totzeit optimieren und deadtime finden

hex wert mal 10ns deadtime

13 ab file 10 besat effort
ab 52 wieder ohne best effort

600

Entry  Sat Mar 15 19:37:42 2025, RD50 Generic User, Slab Test Water 4cm, 12, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 19:39, 20:41, 62, , Plastic Water Slabs, 4cm 

RaMon Rate 1.4MHz

Entry  Fri Mar 14 21:44:46 2025, elog-producer, validating setup, 118, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:44:20, 14.03.2025 21:45:12, 0, HV, None,  tjmonopix2.conf
automatic log for run 118
Comment:
tracker test without beam
Entry  Fri Mar 14 21:43:10 2025, elog-producer, validating setup, 117, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:42:46, 14.03.2025 21:43:36, 0, HV, None,  tjmonopix2.conf
automatic log for run 117
Comment:
tracker test without beam
Entry  Fri Mar 14 21:41:12 2025, elog-producer, validating setup, 116, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 21:41:05, 14.03.2025 21:41:38, 0, HV, None,  tjmonopix2.conf
automatic log for run 116
Comment:
tracker test without beam
Entry  Fri Mar 14 20:40:06 2025, elog-producer, validating setup, 112, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 20:07:47, 14.03.2025 20:40:32, 32, HV, None,  tjmonopix2.conf
automatic log for run 112
Comment:
still testing nonsense
Entry  Fri Mar 14 20:04:41 2025, elog-producer, validating setup, 111, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 20:03:34, 14.03.2025 20:05:07, 1, HV, None,  tjmonopix2.conf
automatic log for run 111
Comment:
bla
Entry  Fri Mar 14 19:57:28 2025, elog-producer, validating setup, 110, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 19:51:51, 14.03.2025 19:57:54, 6, HV, None,  tjmonopix2.conf
automatic log for run 110
Comment:
bla
Entry  Sat Mar 15 18:37:36 2025, RD50 Generic User, Slab Test Water 3cm, 11, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 18:41, 19:28, 47, , Plastic Water Slabs, 3cm 

RaMon Rate 1.5MHz

Entry  Fri Mar 14 19:50:29 2025, elog-producer, validating setup, 109, TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, 14.03.2025 19:49:10, 14.03.2025 19:50:55, 1, HV, None,  tjmonopix2.conf
automatic log for run 109
Comment:
system tests
Entry  Sat Mar 15 17:30:18 2025, RD50 Generic User, Slab Test Water 2cm, 10, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 17:30, 18:24, 54, , Plastic Water Slabs, 2cm 

RaMon Rate 1.5 MHz

Entry  Sat Mar 15 08:58:26 2025, RD50 Generic User, Alignment Run 800MeV, 1, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Low, Proton, Good, 07:40, 08:20, 40, , ,  

RaMon Rate not measured

front sensors 200mu: ~40-60Hz pro Streifen

Comments:

stopped run due to too low rate

 

Entry  Wed Mar 12 09:29:08 2025, tb-crew, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
1st test
ELOG V3.1.5-fc6679b