Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 17 of 19  Not logged in ELOG logo
Entry  Sat Aug 16 20:01:32 2025, elog_producer, Castid, 100, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 16.08.2025 19:56:31, 16.08.2025 20:01:35, 5, HV, None,  tjmonopix2.conf
automatic log for run 100
Comment:
self.configure_rx(delay=10, rd_frz_dly=10) (4x)
Entry  Sat Mar 15 17:30:18 2025, RD50 Generic User, Slab Test Water 2cm, 10, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 17:30, 18:24, 54, , Plastic Water Slabs, 2cm 

RaMon Rate 1.5 MHz

Entry  Sat Jun 21 19:35:59 2025, Julia Müllner, 63.3 MeV systemtest , 10, TOF-Cal GSI, 63.3 MeV/u, Low Flux High, Helium, Good, 19:37, 19:53, 16, , ,  
 
Entry  Sat Dec 6 17:45:43 2025, Felix Ulrich-Pur, 402MeV/u systemtest, 10, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 402MeV/u, Low Flux High, Helium, Good, 17:47, 18:08, 21, , None,  

threshold = 2000

Entry  Sat Dec 13 12:50:47 2025, elog_producer, alignment, 10, Sandwich-iCT setup(GSI)+RaMon, 402MeV/u, Low Flux High, Helium, Good, 13.12.2025 12:42:41, 13.12.2025 12:51:12, 8, Normal, None,  ramon.conf
automatic log for run 10
Comment:
alignment run
Entry  Sat Mar 15 08:58:26 2025, RD50 Generic User, Alignment Run 800MeV, 1, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Low, Proton, Good, 07:40, 08:20, 40, , ,  

RaMon Rate not measured

front sensors 200mu: ~40-60Hz pro Streifen

Comments:

stopped run due to too low rate

 

Entry  Sat Jun 21 14:30:29 2025, Julia Müllner, 800MeV systemtest , 1, TOF-Cal GSI, 800 MeV, Low Flux High, Proton, Good, 14:45, 15:42, 57, , ,  

first spills were done with low flux medium, changed to high at 14:49

again changed to medium at 14:55

again changed to high at 15:00

30 MB pro event builder

last few spills were with the wrong threshold

thresholds were set to 2000 instead of 1000 

Entry  Sat Dec 6 16:11:39 2025, Felix Ulrich-Pur, 800MeV systemtest, 1, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 800 MeV, Low Flux High, Proton, Unknown, 15:45, 15:50, 5, , None,  
 
Entry  Wed Mar 12 09:29:08 2025, tb-crew, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
1st test
Entry  Fri Mar 14 19:47:58 2025, mausi, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
system tests
Entry  Fri Mar 14 21:40:34 2025, elog-producer, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
tracker test without beam
Entry  Fri Mar 14 21:53:59 2025, elog-producer, validating setup, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
starting beam
Entry  Fri Mar 14 21:54:32 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
about to get p+
Entry  Fri Mar 14 22:13:14 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
APV25 latency 42 required for these input stretches
Entry  Fri Mar 14 22:41:16 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
ignored veto of tracker
Entry  Fri Mar 14 22:48:01 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
max trigger 75 -> 100
Entry  Fri Mar 14 23:21:26 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
wrong trigger mode used for tracker
Entry  Fri Mar 14 23:22:22 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
changed telescope timing again to latency 40
Entry  Fri Mar 14 23:32:56 2025, elog-producer, 1st tests with beam, , TJ-Monopix2, 800 MeV, Low Flux Very Low, Proton, Unknown, , , , HV, None,  
208 shows correlation
Entry  Sat Mar 15 01:51:31 2025, elog-producer, Fast RO Test, , TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, , , , HV, None,  
Run 219, Medium settings, fast RO, W02R01 to 8b10b a few minutes in
ELOG V3.1.5-fc6679b