Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 1 of 18  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energy Rate Setting Particle Type Data t-Start t-Stop Duration_min Frontend Phantom Phantom thickness
  348   Sat Dec 13 14:18:49 2025 elog_producerenergy calibration17Sandwich-iCT setup(GSI)+RaMon63.3 MeV/uLow Flux HighHeliumGood13.12.2025 14:02:3013.12.2025 14:19:1416NormalNone 
automatic log for run 17
Comment:
calibration run 63.3 MeV
  347   Sat Dec 13 14:00:52 2025 elog_producerenergy calibration16Sandwich-iCT setup(GSI)+RaMon73.2 MeV/uLow Flux HighHeliumGood13.12.2025 13:47:2313.12.2025 14:01:1813NormalNone 
automatic log for run 16
Comment:
calibration run 73.2 MeV
  346   Sat Dec 13 13:45:59 2025 elog_producerenergy calibration15Sandwich-iCT setup(GSI)+RaMon97.2MeV/uLow Flux HighHeliumGood13.12.2025 13:35:1213.12.2025 13:46:2411NormalNone 
automatic log for run 15
Comment:
calibration run 97.2 MeV
  345   Sat Dec 13 13:33:47 2025 elog_producerenergy calibration14Sandwich-iCT setup(GSI)+RaMon124.4 MeV/uLow Flux HighHeliumGood13.12.2025 13:24:4713.12.2025 13:34:139NormalNone 
automatic log for run 14
Comment:
alignment run 124.4 MeV
  344   Sat Dec 13 13:23:37 2025 elog_producerenergy calibration13Sandwich-iCT setup(GSI)+RaMon147.2 MeV/uLow Flux HighHeliumGood13.12.2025 13:16:1313.12.2025 13:24:027NormalNone 
automatic log for run 13
Comment:
alignment run 147.2 MeV
  343   Sat Dec 13 13:13:59 2025 elog_producerenergy calibration12Sandwich-iCT setup(GSI)+RaMon177.8 MeV/uLow Flux HighHeliumGood13.12.2025 13:02:4913.12.2025 13:14:2411NormalNone 
automatic log for run 12
Comment:
alignment run 177.8 MeV
  342   Sat Dec 13 13:00:26 2025 elog_producerenergy calibration11Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux HighHeliumGood13.12.2025 12:52:2313.12.2025 13:00:528NormalNone 
automatic log for run 11
Comment:
alignment run 205.2 MeV
  341   Sat Dec 13 12:50:47 2025 elog_produceralignment10Sandwich-iCT setup(GSI)+RaMon402MeV/uLow Flux HighHeliumGood13.12.2025 12:42:4113.12.2025 12:51:128NormalNone 
automatic log for run 10
Comment:
alignment run
  340   Sat Dec 13 12:26:16 2025 elog_producermixed beam9Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 11:47:1913.12.2025 12:26:4139NormalMixed Beam QA phantom (ICs)17cm
automatic log for run 9
Comment:
xx% He
mixed beam QA test run
  339   Sat Dec 13 11:32:59 2025 elog_producermixed beam8Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 11:30:1513.12.2025 11:33:243NormalRW3 Plate9cm
automatic log for run 8
Comment:
0% He
430 mki
amplituden modulation lf12
trigger window: 640ns pre and 85ns post
TDC4 faild, powercycle everything and restart network connections
  338   Sat Dec 13 11:29:15 2025 elog_producermixed beam7Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 11:27:2013.12.2025 11:29:402NormalRW3 Plate9cm
automatic log for run 7
Comment:
20% He
290 mki
trigger window: 640ns pre and 85ns post
  337   Sat Dec 13 11:26:46 2025 elog_producermixed beam6Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 11:15:2913.12.2025 11:27:1111NormalRW3 Plate9cm
automatic log for run 6
Comment:
20% He
300 mki
trigger window: 640ns pre and 85ns post
  336   Sat Dec 13 11:14:38 2025 elog_producermixed beam5Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 10:59:0013.12.2025 11:15:0316NormalRW3 Plate9cm
automatic log for run 5
Comment:
10% He
310 mki
amplitude modulation lf12
trigger window: 640ns pre and 85ns post
  335   Sat Dec 13 10:57:30 2025 elog_producerAlignment4Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 10:27:4913.12.2025 10:57:5530NormalRW3 Plate9cm
automatic log for run 4
Comment:
mixed beam - testing beam settings
trigger window: 640ns pre and 85ns post
beam spot is centered
  334   Sat Dec 13 10:18:41 2025 elog_producerAlignment3Sandwich-iCT setup(GSI)+RaMon200 MeV/ureduced_mixed_beamMixed Beam (He+C)Good13.12.2025 09:41:1913.12.2025 10:19:0637NormalNone 
automatic log for run 3
Comment:
alignment mixed beam - testing beam settings
trigger window: 640ns pre and 85ns post
  333   Sat Dec 13 08:06:08 2025 elog_producerAlignment2TOF-Cal_GSI_8LGAD+RaMon200 MeV/uLow Flux High Good13.12.2025 07:56:3113.12.2025 08:06:3410NormalNone 
automatic log for run 2
Comment:
initial alignment run
(run 1 not recorded, same settings)
  331   Sun Dec 7 08:24:32 2025 RD50 Generic UserMaus386TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumGood8:248:273 Mouse 

angle = 180

x/y=-21/-59.5 

rate:6 10e6

PreTriggerWindow 2.915us and PostTriggerWindow 85ns

  330   Sun Dec 7 08:21:19 2025 RD50 Generic UserMaus385TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumGood8:218:243 Mouse 

angle = 180

x/y=-21/-56.5 

rate:6 10e6

PreTriggerWindow 2.915us and PostTriggerWindow 85ns

  329   Sun Dec 7 08:18:05 2025 RD50 Generic UserMaus384TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumGood8:188:213 Mouse 

angle = 180

x/y=-21/-53.5 

rate:6 10e6

PreTriggerWindow 2.915us and PostTriggerWindow 85ns

  328   Sun Dec 7 08:15:21 2025 RD50 Generic UserMaus383TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon124.4 MeV/uLow Flux HighHeliumGood    Mouse 

angle = 180

x/y=-21/-44.5 (falsche Richtung :( )

rate:6 10e6

PreTriggerWindow 2.915us and PostTriggerWindow 85ns

ELOG V3.1.5-fc6679b