Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 12 of 19  Not logged in ELOG logo
Entry  Sat Mar 15 21:29:28 2025, RD50 Generic User, Slab and rate testing (with Michael), 13, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 20:44, 21:22, 38, , Plastic Water Slabs, 4cm 

totzeit optimieren und deadtime finden

hex wert mal 10ns deadtime

13 ab file 10 besat effort
ab 52 wieder ohne best effort

600

Entry  Sat Jun 21 16:30:44 2025, Julia Müllner, 205.2 MeV systemtest , 3, TOF-Cal GSI, 205.2 MeV/u, Low Flux High, Helium, Unknown, 16:38, 16:57, 19, , ,  

Threshold set to 5000

dead channels on last LGAD, changed trigger from LGAD 12 to LGAD 11

Entry  Sat Jun 21 20:24:05 2025, Julia Müllner, 205.2 MeV systemtest , 14, TOF-Cal GSI, 205.2 MeV/u, Low Flux High, Helium, Good, 20:24, 20:32, 8, , ,  

last events already with 400MeV/u

Entry  Sat Dec 6 22:00:50 2025, Felix Ulrich-Pur, 205.2 MeV/u systemtest, 21, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 22:03, 22:20, 17, , None,  

110 Mb/s Events, 65 Mb/s rejected

PreTriggerWindow 3360ns and PostTriggerWindow 640ns 

runs of hadesp81 nicht umbenannt

Entry  Sat Dec 6 22:20:09 2025, Felix Ulrich-Pur, 205.2 MeV/u systemtest, 22, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 205.2 MeV/u, Low Flux High, Helium, , 22:22, 22:34, 12, , None,  

PreTriggerWindow 640ns and PostTriggerWindwo 85ns

Entry  Sat Dec 13 13:00:26 2025, elog_producer, energy calibration, 11, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux High, Helium, Good, 13.12.2025 12:52:23, 13.12.2025 13:00:52, 8, Normal, None,  ramon.conf
automatic log for run 11
Comment:
alignment run 205.2 MeV
Entry  Sat Dec 13 08:06:08 2025, elog_producer, Alignment, 2, TOF-Cal_GSI_8LGAD+RaMon, 200 MeV/u, Low Flux High, , Good, 13.12.2025 07:56:31, 13.12.2025 08:06:34, 10, Normal, None,  ramon.conf
automatic log for run 2
Comment:
initial alignment run
(run 1 not recorded, same settings)
Entry  Sat Dec 13 10:18:41 2025, elog_producer, Alignment, 3, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 09:41:19, 13.12.2025 10:19:06, 37, Normal, None,  ramon.conf
automatic log for run 3
Comment:
alignment mixed beam - testing beam settings
trigger window: 640ns pre and 85ns post
Entry  Sat Dec 13 10:57:30 2025, elog_producer, Alignment, 4, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 10:27:49, 13.12.2025 10:57:55, 30, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 4
Comment:
mixed beam - testing beam settings
trigger window: 640ns pre and 85ns post
beam spot is centered
Entry  Sat Dec 13 11:14:38 2025, elog_producer, mixed beam, 5, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 10:59:00, 13.12.2025 11:15:03, 16, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 5
Comment:
10% He
310 mki
amplitude modulation lf12
trigger window: 640ns pre and 85ns post
Entry  Sat Dec 13 11:26:46 2025, elog_producer, mixed beam, 6, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:15:29, 13.12.2025 11:27:11, 11, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 6
Comment:
20% He
300 mki
trigger window: 640ns pre and 85ns post
Entry  Sat Dec 13 11:29:15 2025, elog_producer, mixed beam, 7, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:27:20, 13.12.2025 11:29:40, 2, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 7
Comment:
20% He
290 mki
trigger window: 640ns pre and 85ns post
Entry  Sat Dec 13 11:32:59 2025, elog_producer, mixed beam, 8, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:30:15, 13.12.2025 11:33:24, 3, Normal, RW3 Plate, 9cm ramon.conf
automatic log for run 8
Comment:
0% He
430 mki
amplituden modulation lf12
trigger window: 640ns pre and 85ns post
TDC4 faild, powercycle everything and restart network connections
Entry  Sat Dec 13 12:26:16 2025, elog_producer, mixed beam, 9, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:47:19, 13.12.2025 12:26:41, 39, Normal, Mixed Beam QA phantom (ICs), 17cm ramon.conf
automatic log for run 9
Comment:
xx% He
mixed beam QA test run
Entry  Sat Dec 13 14:48:42 2025, elog_producer, energy calibration, 18, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Crap, 13.12.2025 14:43:14, 13.12.2025 14:49:07, 5, Normal, RW3 Plate,  ramon.conf
automatic log for run 18
Comment:
2x ionization chambers
detector 4 failed (problem with HV)
Entry  Sat Dec 13 16:00:08 2025, elog_producer, energy calibration, 19, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 15:02:15, 13.12.2025 16:00:34, 58, Normal, RW3 Plate, 11cm ramon.conf
automatic log for run 19
Comment:
2x ionization chambers
new threshold scan
1 spill 400MeV
downtime
Entry  Sat Dec 13 16:26:02 2025, elog_producer, energy calibration, 20, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 16:13:10, 13.12.2025 16:26:28, 13, Normal, RW3 Plate, 10cm ramon.conf
automatic log for run 20
Comment:
2x ionization chambers
start only He without dogma
Starts with only C (16:24)
Entry  Sat Dec 13 16:54:13 2025, elog_producer, energy calibration, 21, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 16:27:34, 13.12.2025 16:54:39, 27, Normal, RW3 Plate, 10cm ramon.conf
automatic log for run 21
Comment:
2x ionization chambers
same C setting now with He
identifier a
powercycle TDCs (16:43)
Entry  Sat Dec 13 17:26:16 2025, elog_producer, energy calibration, 22, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 16:57:59, 13.12.2025 17:26:41, 28, Normal, RW3 Plate, 10cm ramon.conf
automatic log for run 22
Comment:
2x ionization chambers
identifier b
Entry  Sat Dec 13 18:01:55 2025, elog_producer, energy calibration, 23, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 17:43:07, 13.12.2025 18:02:21, 19, Normal, RW3 Plate, 12cm ramon.conf
automatic log for run 23
Comment:
2x ionization chambers
identifier c
ELOG V3.1.5-fc6679b