Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 11 of 19  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energy Rate Setting Particle Typedown Data t-Start t-Stop Duration_min Frontend Phantom Phantom thickness
  355   Sat Dec 13 18:22:46 2025 elog_producerenergy calibration24Sandwich-iCT setup(GSI)+RaMon200 MeV/uNominalMixed Beam (He+C)Good13.12.2025 18:04:2513.12.2025 18:23:1118NormalRW3 Plate12cm
automatic log for run 24
Comment:
2x ionization chambers
identifier d
  356   Sat Dec 13 18:47:46 2025 elog_producerenergy calibration25Sandwich-iCT setup(GSI)+RaMon200 MeV/uNominalMixed Beam (He+C)Good13.12.2025 18:28:2213.12.2025 18:48:1219NormalRW3 Plate12cm+2mm
automatic log for run 25
Comment:
2x ionization chambers
identifier e
mki: 310
  357   Sat Dec 13 19:11:30 2025 elog_producerenergy calibration26Sandwich-iCT setup(GSI)+RaMon200 MeV/uNominalMixed Beam (He+C)Good13.12.2025 18:50:2113.12.2025 19:11:5621NormalRW3 Plate12cm+2mm
automatic log for run 26
Comment:
2x ionization chambers
identifier f
mki: 290
  358   Sat Dec 13 19:35:03 2025 elog_producerenergy calibration27Sandwich-iCT setup(GSI)+RaMon200 MeV/uNominalMixed Beam (He+C)Good13.12.2025 19:18:3313.12.2025 19:35:2916NormalRW3 Plate12cm+3mm
automatic log for run 27
Comment:
2x ionization chambers
identifier g
mki: 290
  359   Sat Dec 13 19:47:31 2025 elog_producerenergy calibration28Sandwich-iCT setup(GSI)+RaMon200 MeV/uNominalMixed Beam (He+C)Good13.12.2025 19:42:0013.12.2025 19:47:575NormalRW3 Plate12cm+3mm
automatic log for run 28
Comment:
2x ionization chambers
identifier h
mki: 310
(ramon start delayed Frown)
  360   Sat Dec 13 20:04:41 2025 elog_producerenergy calibration29Sandwich-iCT setup(GSI)+RaMon200 MeV/uNominalMixed Beam (He+C)Good13.12.2025 19:49:0113.12.2025 20:05:0716NormalRW3 Plate12cm+3mm
automatic log for run 29
Comment:
2x ionization chambers
C only
identifier i
mki: 430
  361   Sat Dec 13 20:24:58 2025 elog_producerenergy calibration30Sandwich-iCT setup(GSI)+RaMon200 MeV/uNominalMixed Beam (He+C)Good13.12.2025 20:10:4313.12.2025 20:25:2414NormalRW3 Plate12cm+3mm
automatic log for run 30
Comment:
2x ionization chambers
0.5mm Kapton
identifier j
mki: 310
  362   Sat Dec 13 21:23:52 2025 elog_producerKopf Phantom31Sandwich-iCT setup(GSI)+RaMon200 MeV/uNominalMixed Beam (He+C)Crap13.12.2025 20:58:4513.12.2025 21:24:1725NormalRW3 Plate2cm+Kopf
automatic log for run 31
Comment:
sinus cavity spot 5mm down
identifier ba
mki: 310
(problems with HV at 21:00-21:15)
new threshold scan
  363   Sat Dec 13 21:35:30 2025 elog_producerKopf Phantom32Sandwich-iCT setup(GSI)+RaMon200 MeV/uNominalMixed Beam (He+C)Crap13.12.2025 21:26:4513.12.2025 21:35:569NormalKopf 
automatic log for run 32
Comment:
sinus cavity spot 5mm down
identifier ba
mki: 310
sensor 4 seems to be dead, measure without it
enabling preamps for sensor 1+2 is beneficial for data (21:35)
  364   Sat Dec 13 21:47:18 2025 elog_producerKopf Phantom33Sandwich-iCT setup(GSI)+RaMon200 MeV/uNominalMixed Beam (He+C)Good13.12.2025 21:36:0413.12.2025 21:47:4411NormalRW3 Plate2cm+Kopf
automatic log for run 33
Comment:
sinus cavity spot 5mm down
identifier ba
mki: 310
sensor 4 seems to be dead, measure without it
  66   Sat Mar 15 13:15:25 2025 RD50 Generic UserSlab Measurement 205MeV6Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHeliumGood13:2714:4982   

RaMon Rate 1.3 MHz

Comments:

We entered the room and connected the second LAN Port to the ReadOut-PC. The Eventbuilder-parameter got changed.

  67   Sat Mar 15 15:02:39 2025 RD50 Generic UserRate testing7Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux HighHeliumGood15:0415:2521   

RaMon Rate 4.5MHz

Comments:

From File 7 until 21 optional false, and from 22 true (everything deleted)

  68   Sat Mar 15 15:26:08 2025 RD50 Generic UserRate testing8Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHelium 15:3116:3059   

RaMon Rate: 1.3MHz

Comments:

Tested different evenbuilder settings which made things worse, probably switch is the bottleneck, changed rate settings inbetween, requires sergey

  69   Sat Mar 15 16:50:39 2025 RD50 Generic UserSlab Test Water 1cm9Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHeliumGood16:3517:2348 Plastic Water Slabs1cm

RaMon Rate: 1.3MHz

  70   Sat Mar 15 17:30:18 2025 RD50 Generic UserSlab Test Water 2cm10Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHelium 17:3018:2454 Plastic Water Slabs2cm

RaMon Rate 1.5 MHz

  71   Sat Mar 15 18:37:36 2025 RD50 Generic UserSlab Test Water 3cm11Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHelium 18:4119:2847 Plastic Water Slabs3cm

RaMon Rate 1.5MHz

  72   Sat Mar 15 19:37:42 2025 RD50 Generic UserSlab Test Water 4cm12Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux MediumHelium 19:3920:4162 Plastic Water Slabs4cm

RaMon Rate 1.4MHz

  73   Sat Mar 15 21:25:18 2025 RD50 Generic UserSlab Test Water 5cm14Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux HighHeliumGood21:2621:5024 Plastic Water Slabs5cm

RaMon rate: 4.5MHz

  74   Sat Mar 15 21:29:28 2025 RD50 Generic UserSlab and rate testing (with Michael)13Sandwich-iCT setup(GSI)+RaMon205.2 MeV/uLow Flux HighHeliumGood20:4421:2238 Plastic Water Slabs4cm

totzeit optimieren und deadtime finden

hex wert mal 10ns deadtime

13 ab file 10 besat effort
ab 52 wieder ohne best effort

600

  77   Sat Jun 21 16:30:44 2025 Julia Müllner205.2 MeV systemtest 3TOF-Cal GSI205.2 MeV/uLow Flux HighHeliumUnknown16:3816:5719   

Threshold set to 5000

dead channels on last LGAD, changed trigger from LGAD 12 to LGAD 11

ELOG V3.1.5-fc6679b