Sat Sep 20 21:19:29 2025, elog_producer, Caribou 1.5, 1043, RD50-MPW4, 800 MeV, Low Flux High, Proton, Unknown, 20.09.2025 21:18:09, 20.09.2025 21:19:40, 1, Normal, ,  
|
automatic log for run 1043
Comment:
DMA debugging
not waiting for IOC flag
frame rate UDP vs. DMA similar now |
Sat Sep 20 21:23:52 2025, elog_producer, Caribou 1.5, 1044, RD50-MPW4, 800 MeV, Low Flux High, Proton, Unknown, 20.09.2025 21:23:44, 20.09.2025 21:24:03, 0, Normal, ,  
|
automatic log for run 1044
Comment:
DMA debugging
no data |
Sat Dec 6 16:11:39 2025, Felix Ulrich-Pur, 800MeV systemtest, 1, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 800 MeV, Low Flux High, Proton, Unknown, 15:45, 15:50, 5, , None,
|
| |
Sat Dec 6 18:08:39 2025, Felix Ulrich-Pur, 800MeV systemtest, 11, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 800 MeV, Low Flux High, Proton, Good, 18:16, 18:23, 7, , None,
|
adjusted threshold for double-sided LGAD (accounted for polarity of signal) |
Sat Dec 6 18:36:14 2025, Felix Ulrich-Pur, 800MeV systemtest, 13, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 800 MeV, Low Flux Very Low, Proton, Good, 18:53, 19:18, 25, , None,
|
Run nr. 12 wasn't recorded.
new calib from this run on |
Sat Dec 6 19:20:24 2025, Felix Ulrich-Pur, 800MeV systemtest, 14, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 800 MeV, Low Flux High, Proton, Good, 19:30, 19:45, 15, , None,
|
3360ns PreTriggerWindow and 640ns PostTriggerWindow
Had to restart eventbuilder at 19:39 due to high rejected rate
60Mb/s Events and 10-15Mb/s rejected |
Sat Dec 6 19:47:32 2025, Felix Ulrich-Pur, 800MeV systemtest, 15, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 800 MeV, Low Flux High, Proton, Good, 19:48, 19:57, 9, , None,
|
PreTriggerWindow: 640ns and PostTriggerWindow: 3.36µs
25Mb/s Events and 25Mb/s rejected |
Sat Dec 13 10:18:41 2025, elog_producer, Alignment, 3, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 09:41:19, 13.12.2025 10:19:06, 37, Normal, None,
|
automatic log for run 3
Comment:
alignment mixed beam - testing beam settings
trigger window: 640ns pre and 85ns post |
Sat Dec 13 10:57:30 2025, elog_producer, Alignment, 4, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 10:27:49, 13.12.2025 10:57:55, 30, Normal, RW3 Plate, 9cm
|
automatic log for run 4
Comment:
mixed beam - testing beam settings
trigger window: 640ns pre and 85ns post
beam spot is centered |
Sat Dec 13 11:14:38 2025, elog_producer, mixed beam, 5, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 10:59:00, 13.12.2025 11:15:03, 16, Normal, RW3 Plate, 9cm
|
automatic log for run 5
Comment:
10% He
310 mki
amplitude modulation lf12
trigger window: 640ns pre and 85ns post |
Sat Dec 13 11:26:46 2025, elog_producer, mixed beam, 6, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:15:29, 13.12.2025 11:27:11, 11, Normal, RW3 Plate, 9cm
|
automatic log for run 6
Comment:
20% He
300 mki
trigger window: 640ns pre and 85ns post |
Sat Dec 13 11:29:15 2025, elog_producer, mixed beam, 7, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:27:20, 13.12.2025 11:29:40, 2, Normal, RW3 Plate, 9cm
|
automatic log for run 7
Comment:
20% He
290 mki
trigger window: 640ns pre and 85ns post |
Sat Dec 13 11:32:59 2025, elog_producer, mixed beam, 8, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:30:15, 13.12.2025 11:33:24, 3, Normal, RW3 Plate, 9cm
|
automatic log for run 8
Comment:
0% He
430 mki
amplituden modulation lf12
trigger window: 640ns pre and 85ns post
TDC4 faild, powercycle everything and restart network connections |
Sat Dec 13 12:26:16 2025, elog_producer, mixed beam, 9, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Good, 13.12.2025 11:47:19, 13.12.2025 12:26:41, 39, Normal, Mixed Beam QA phantom (ICs), 17cm
|
automatic log for run 9
Comment:
xx% He
mixed beam QA test run |
Sat Dec 13 14:48:42 2025, elog_producer, energy calibration, 18, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, reduced_mixed_beam, Mixed Beam (He+C), Crap, 13.12.2025 14:43:14, 13.12.2025 14:49:07, 5, Normal, RW3 Plate,
|
automatic log for run 18
Comment:
2x ionization chambers
detector 4 failed (problem with HV) |
Sat Dec 13 16:00:08 2025, elog_producer, energy calibration, 19, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 15:02:15, 13.12.2025 16:00:34, 58, Normal, RW3 Plate, 11cm
|
automatic log for run 19
Comment:
2x ionization chambers
new threshold scan
1 spill 400MeV
downtime |
Sat Dec 13 16:26:02 2025, elog_producer, energy calibration, 20, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 16:13:10, 13.12.2025 16:26:28, 13, Normal, RW3 Plate, 10cm
|
automatic log for run 20
Comment:
2x ionization chambers
start only He without dogma
Starts with only C (16:24) |
Sat Dec 13 16:54:13 2025, elog_producer, energy calibration, 21, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 16:27:34, 13.12.2025 16:54:39, 27, Normal, RW3 Plate, 10cm
|
automatic log for run 21
Comment:
2x ionization chambers
same C setting now with He
identifier a
powercycle TDCs (16:43) |
Sat Dec 13 17:26:16 2025, elog_producer, energy calibration, 22, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 16:57:59, 13.12.2025 17:26:41, 28, Normal, RW3 Plate, 10cm
|
automatic log for run 22
Comment:
2x ionization chambers
identifier b |
Sat Dec 13 18:01:55 2025, elog_producer, energy calibration, 23, Sandwich-iCT setup(GSI)+RaMon, 200 MeV/u, Nominal, Mixed Beam (He+C), Good, 13.12.2025 17:43:07, 13.12.2025 18:02:21, 19, Normal, RW3 Plate, 12cm
|
automatic log for run 23
Comment:
2x ionization chambers
identifier c |
|