Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  Testbeams at MedAustron in 2024, Page 1 of 5  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subjectdown Run Number DUT Beam Energy Rate Setting Particle Type Data t-Start t-Stop Duration_min Frontend
  39   Sat Mar 30 11:55:55 2024 bp, ci, hhuseful datataking1023RD50-MPW4800 MeVLow Flux LowProtonGood30.03.2024 11:06:4930.03.2024 11:58:2251Normal
automatic log for run 1023
Comment:
  40   Sat Mar 30 12:28:29 2024 bp, ci, hhuseful datataking1024RD50-MPW4800 MeVLow Flux LowProtonGood30.03.2024 11:58:4530.03.2024 12:30:5632Normal
automatic log for run 1024
Comment:
changed thr to 1V (not 100% sure, configure was not executed)
  41   Sat Mar 30 12:54:24 2024 bp, ci, hhuseful datataking1025RD50-MPW4800 MeVLow Flux LowProtonGood30.03.2024 12:32:2730.03.2024 12:56:5124Normal
automatic log for run 1025
Comment:
changed thr to 0.95V
  42   Sat Mar 30 13:28:15 2024 bp, ci, hhuseful datataking1026RD50-MPW4800 MeVLow Flux LowProtonGood30.03.2024 12:58:0230.03.2024 13:30:4232Normal
automatic log for run 1026
Comment:
changed thr to 0.98V
  43   Sat Mar 30 13:35:09 2024 bp, ci, hhuseful datataking RD50-MPW4800 MeVLow Flux LowProtonGood   Normal
new users arrived
  87   Sun Jun 9 00:05:11 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser (wrong energy)16TOF-Cal GSI194.3 MeVLow Flux HighProtonCrap22:5022:52  

wrong energy don't use

  81   Sat Jun 8 21:42:13 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser10TOF-Cal GSI194.3 MeVLow Flux HighProtonGood21:2721:39  

1cm plastic water (in isocentre)
6 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1.5 MHz on LGAD

WET measurement

  82   Sat Jun 8 21:43:26 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser11TOF-Cal GSI145.4 MeVLow Flux HighProtonGood21:3921:48  

1cm plastic water (in isocentre)
4 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 700 kHz on LGAD

WET measurement

  83   Sat Jun 8 21:54:59 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser12TOF-Cal GSI194.3 MeVLow Flux HighProtonGood21:5322:05  

2cm plastic water (in isocentre)
5 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1.2 MHz on LGAD

WET measurement

  84   Sat Jun 8 22:12:06 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser13TOF-Cal GSI145.4 MeVLow Flux HighProtonGood22:0522:34  

2cm plastic water (in isocentre)
3.2 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 600 kHz on LGAD

WET measurement

  85   Sat Jun 8 22:38:41 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser14TOF-Cal GSI194.3 MeVLow Flux HighProtonGood22:1922.34  

3 cm plastic water (in isocentre)
4.3 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1MHz on LGAD

WET measurement

  86   Sun Jun 9 00:04:23 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser15TOF-Cal GSI194.3 MeVLow Flux HighProtonGood22:3422:50  

3 cm plastic water (in isocentre)
2.6 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 400 kHz on LGAD

WET measurement

  88   Sun Jun 9 00:06:01 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser17TOF-Cal GSI194.3 MeVLow Flux HighProtonGood22:5323:04  

4 cm plastic water (in isocentre)
3.8 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 900 kHz on LGAD

WET measurement

  89   Sun Jun 9 00:07:17 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser18TOF-Cal GSI145.4 MeVLow Flux HighProtonGood23:0423:20  

4 cm plastic water (in isocentre)
2 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 500 kHz on LGAD

WET measurement

  90   Sun Jun 9 00:08:07 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser19TOF-Cal GSI194.3 MeVLow Flux HighProtonGood23:2023:30  

5 cm plastic water (in isocentre)
3.7 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 795 kHz on LGAD

WET measurement

  91   Sun Jun 9 00:10:38 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser20TOF-Cal GSI145.4 MeVLow Flux HighProtonGood23:3100:00  

5 cm plastic water (in isocentre)
2 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 330 kHz on LGAD

14 min break with beam off (DAQ failed, had to power cycle TRB3s and all DIRICH boards-->out of synch DIRICH)

WET measurement

  92   Sun Jun 9 00:12:41 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Knochen21TOF-Cal GSI194.3 MeVLow Flux HighProtonGood00:0000:14  

1 cm dense bone (in isocentre)
4.5 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1.2 MHz on LGAD

WET measurement

  93   Sun Jun 9 01:22:48 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Knochen22TOF-Cal GSI145.4 MeVLow Flux HighProtonGood00:1400:23  

1 cm dense bone (in isocentre)
2.8 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 600 kHz on LGAD

WET measurement

  94   Sun Jun 9 01:25:26 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Knochen23TOF-Cal GSI194.3 MeVLow Flux HighProtonGood00:3001:02  

2 cm dense bone (in isocentre)
- Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1 MHz on LGAD

interlock at 00:31 till 00:50 --> 19min break

WET measurement

  95   Sun Jun 9 01:26:56 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Knochen24TOF-Cal GSI145.4 MeVLow Flux HighProtonGood01:0201:14  

2 cm dense bone (in isocentre)
2.1 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 315 kHz on LGAD

WET measurement

ELOG V3.1.5-fc6679b