Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  Testbeams at MedAustron in 2024, Page 8 of 11  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energydown Rate Setting Particle Type Data t-Start t-Stop Duration_min Frontend Phantom Phantom thickness Text Attachments
  166   Sat Dec 14 13:42:52 2024 Felix Ulrich-Purthreshold and preamp tests 27TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon63.3 MeV/uLow Flux HighHeliumGood12:5213:1624   TRB Setup: 260V bias and 250mA pre-amps,
threshold 1000 (changed threshold)

Diamond: 900mA, threshold 50
  
  167   Sat Dec 14 13:45:34 2024 Felix Ulrich-Purthreshold and preamp tests 28TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon63.3 MeV/uLow Flux HighHeliumGood13:2013:322   TRB Setup: 260V bias and 250mA pre-amps,
threshold 1000 (changed threshold)

Diamond: 900mA, threshold 1000
  
  80   Sat Jun 8 21:41:04 2024 Felix Ulrich-PurTOF CAL HADES LGADs Calibrationcurve9TOF-Cal GSI62.4 MeVLow Flux HighProtonGood20:5521:21    changed back to high due to beamsize vs
LGAD size factor
650 khz on Ramon (after 5 Layers of
  
  137   Sun Aug 25 12:51:10 2024 tb-crewonly base71RD50-MPW462.4 MeVLow Flux Very LowProtonUnknown25.08.2024 12:40:4125.08.2024 12:51:3710Normal  automatic log for run 71
Comment:
E-scan
 peary_config.cfgmatrix_mpw4_base.txtmatrix_mpw4_piggy.txtmpw4.conf 
  138   Sun Aug 25 13:04:26 2024 tb-crewonly base RD50-MPW462.4 MeVLow Flux Very LowProtonUnknown   Normal  End of (promising) shift   
  218   Sat Dec 14 15:50:19 2024 Felix Ulrich-PurLGAD+Diamond test with clinical carbon beam80TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon402MeV/u CarbonGood05:1505:5035   Carbon Deg10 (clinical rate)

TRB Setup: 260V bias and 250mA
pre-amps, threshold 5000
  
  72   Sat Jun 8 19:53:47 2024 Felix Ulrich-PurTOF CAL HADES LGADs Test High Rate1TOF-Cal GSI252.7 MeVLow Flux HighProtonGood16:0016:18    7.5 Mhz on Ramon (after 5 Layers of Silicon
and close to second iso centre) and 2.5 MHz
on LGAD
  
  73   Sat Jun 8 19:56:37 2024 Felix Ulrich-PurTOF CAL HADES LGADs Calibrationcurve2TOF-Cal GSI252.7 MeVLow Flux MediumProtonGood16:2916:47    1 Mhz on Ramon (after 5 Layers of Silicon
and close to second iso centre) and 350kHz
on LGAD
  
  133   Sun Aug 25 11:35:21 2024 tb-crewonly base67RD50-MPW4252.7 MeVLow Flux Very LowProtonUnknown25.08.2024 11:35:3325.08.2024 11:35:480Normal  automatic log for run 67
Comment:
E-scan
 peary_config.cfgmatrix_mpw4_base.txtmatrix_mpw4_piggy.txtmpw4.conf 
  134   Sun Aug 25 12:00:00 2024 tb-crewonly base68RD50-MPW4252.7 MeVLow Flux Very LowProtonUnknown25.08.2024 11:37:4125.08.2024 12:00:2722Normal  automatic log for run 68
Comment:
E-scan
 peary_config.cfgmatrix_mpw4_base.txtmatrix_mpw4_piggy.txtmpw4.conf 
  140   Fri Dec 13 11:48:21 2024 Felix Ulrich-PurShift 23.11.24 low flux He test with RaMon1RaMon205.2 MeV/uLow Flux MediumHeliumGood06:2806:302   Mean rate per spill~ 4-6E5 p/s (online
estimation without proper analysis)
  
  147   Sat Dec 14 12:56:05 2024 Felix Ulrich-PurShift 23.11.24 low flux He test with RaMon8RaMon205.2 MeV/uLow Flux HighHeliumGood06:3906:401   Mean rate per spill~ 5e6 p/s (online estimation
without proper analysis)
  
  156   Sat Dec 14 13:07:15 2024 Felix Ulrich-PurEnergy vs TOF calibration17TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon205.2 MeV/uLow Flux MediumHeliumGood08:4609:4256   before run, setups had to be aligned (first
slab in slabholder was put in isocentre.
However, in this run, no slab was used).
  
  157   Sat Dec 14 13:16:33 2024 Felix Ulrich-PurEnergy vs TOF calibration +Alignment of DOGMA setup18TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon205.2 MeV/uLow Flux MediumHeliumGood09:4209:486   TRB Setup: 260V bias and 250mA pre-amps,
threshold 1000
  
  168   Sat Dec 14 13:46:11 2024 Felix Ulrich-PurWET measurement slabs29TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon205.2 MeV/uLow Flux HighHeliumGood13:3414:0329 Plastic Water Slabs1cm1cm Plastic Water

TRB Setup: 260V bias and 250mA
pre-amps, threshold 1000 (changed threshold)
  
  170   Sat Dec 14 13:56:16 2024 Felix Ulrich-PurWET measurement slabs31TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon205.2 MeV/uLow Flux HighHeliumGood14:4815:0618 Plastic Water Slabs2cm2cm plastic water

TRB Setup: 260V bias and 250mA
pre-amps, threshold 1000
  
  172   Sat Dec 14 15:10:35 2024 Felix Ulrich-PurWET measurement slabs33TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon205.2 MeV/uLow Flux HighHeliumGood15:2415:3612 Plastic Water Slabs3cm3cm plastic water

TRB Setup: 260V bias and 250mA
pre-amps, threshold 1000
  
  174   Sat Dec 14 15:12:46 2024 Felix Ulrich-PurWET measurement slabs35TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon205.2 MeV/uLow Flux HighHeliumGood15:5316:1017 Plastic Water Slabs4cm4cm plastic water

TRB Setup: 260V bias and 250mA
pre-amps, threshold 1000
  
  176   Sat Dec 14 15:15:46 2024 Felix Ulrich-PurWET measurement slabs37TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon205.2 MeV/uLow Flux HighHeliumGood16:2816:4212 Plastic Water Slabs5cm5cm plastic water

TRB Setup: 260V bias and 250mA
pre-amps, threshold 1000
  
  178   Sat Dec 14 15:17:57 2024 Felix Ulrich-PurWET measurement slabs39TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon205.2 MeV/uLow Flux HighHeliumGood17:0017:1413 Dense Bone Slabs1cm1cm dense bone

TRB Setup: 260V bias and 250mA
pre-amps, threshold 1000
  
ELOG V3.1.5-fc6679b