Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  Testbeams at MedAustron in 2024, Page 7 of 11  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Datedown Author Subject Run Number DUT Beam Energy Rate Setting Particle Type Data t-Start t-Stop Duration_min Frontend Phantom Phantom thickness
  97   Sun Jun 9 01:32:51 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Knochen26TOF-Cal GSI145.4 MeVLow Flux HighProtonGood01:3001:45    

3 cm dense bone (in isocentre)
1.7 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 230 kHz on LGAD

WET measurement

  96   Sun Jun 9 01:27:38 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Knochen25TOF-Cal GSI194.3 MeVLow Flux HighProtonGood01:1601:30    

3 cm dense bone (in isocentre)
2.8 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 600 kHz on LGAD

WET measurement

  95   Sun Jun 9 01:26:56 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Knochen24TOF-Cal GSI145.4 MeVLow Flux HighProtonGood01:0201:14    

2 cm dense bone (in isocentre)
2.1 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 315 kHz on LGAD

WET measurement

  94   Sun Jun 9 01:25:26 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Knochen23TOF-Cal GSI194.3 MeVLow Flux HighProtonGood00:3001:02    

2 cm dense bone (in isocentre)
- Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1 MHz on LGAD

interlock at 00:31 till 00:50 --> 19min break

WET measurement

  93   Sun Jun 9 01:22:48 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Knochen22TOF-Cal GSI145.4 MeVLow Flux HighProtonGood00:1400:23    

1 cm dense bone (in isocentre)
2.8 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 600 kHz on LGAD

WET measurement

  92   Sun Jun 9 00:12:41 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Knochen21TOF-Cal GSI194.3 MeVLow Flux HighProtonGood00:0000:14    

1 cm dense bone (in isocentre)
4.5 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1.2 MHz on LGAD

WET measurement

  91   Sun Jun 9 00:10:38 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser20TOF-Cal GSI145.4 MeVLow Flux HighProtonGood23:3100:00    

5 cm plastic water (in isocentre)
2 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 330 kHz on LGAD

14 min break with beam off (DAQ failed, had to power cycle TRB3s and all DIRICH boards-->out of synch DIRICH)

WET measurement

  90   Sun Jun 9 00:08:07 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser19TOF-Cal GSI194.3 MeVLow Flux HighProtonGood23:2023:30    

5 cm plastic water (in isocentre)
3.7 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 795 kHz on LGAD

WET measurement

  89   Sun Jun 9 00:07:17 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser18TOF-Cal GSI145.4 MeVLow Flux HighProtonGood23:0423:20    

4 cm plastic water (in isocentre)
2 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 500 kHz on LGAD

WET measurement

  88   Sun Jun 9 00:06:01 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser17TOF-Cal GSI194.3 MeVLow Flux HighProtonGood22:5323:04    

4 cm plastic water (in isocentre)
3.8 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 900 kHz on LGAD

WET measurement

  87   Sun Jun 9 00:05:11 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser (wrong energy)16TOF-Cal GSI194.3 MeVLow Flux HighProtonCrap22:5022:52    

wrong energy don't use

  86   Sun Jun 9 00:04:23 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser15TOF-Cal GSI194.3 MeVLow Flux HighProtonGood22:3422:50    

3 cm plastic water (in isocentre)
2.6 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 400 kHz on LGAD

WET measurement

  85   Sat Jun 8 22:38:41 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser14TOF-Cal GSI194.3 MeVLow Flux HighProtonGood22:1922.34    

3 cm plastic water (in isocentre)
4.3 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1MHz on LGAD

WET measurement

  84   Sat Jun 8 22:12:06 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser13TOF-Cal GSI145.4 MeVLow Flux HighProtonGood22:0522:34    

2cm plastic water (in isocentre)
3.2 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 600 kHz on LGAD

WET measurement

  83   Sat Jun 8 21:54:59 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser12TOF-Cal GSI194.3 MeVLow Flux HighProtonGood21:5322:05    

2cm plastic water (in isocentre)
5 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1.2 MHz on LGAD

WET measurement

  82   Sat Jun 8 21:43:26 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser11TOF-Cal GSI145.4 MeVLow Flux HighProtonGood21:3921:48    

1cm plastic water (in isocentre)
4 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 700 kHz on LGAD

WET measurement

  81   Sat Jun 8 21:42:13 2024 Felix Ulrich-PurTOF CAL HADES LGADs WET Messung Wasser10TOF-Cal GSI194.3 MeVLow Flux HighProtonGood21:2721:39    

1cm plastic water (in isocentre)
6 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1.5 MHz on LGAD

WET measurement

  80   Sat Jun 8 21:41:04 2024 Felix Ulrich-PurTOF CAL HADES LGADs Calibrationcurve9TOF-Cal GSI62.4 MeVLow Flux HighProtonGood20:5521:21    

changed back to high due to beamsize vs LGAD size factor
650 khz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 230kHz on LGAD

TOF Calibration Curve

  79   Sat Jun 8 20:11:00 2024 Felix Ulrich-PurTOF CAL HADES LGADs Calibrationcurve8TOF-Cal GSI83 MeVLow Flux MediumProtonGood19:4220:51    

300 khz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 35kHz on LGAD

TOF Calibration Curve

  78   Sat Jun 8 20:09:25 2024 Felix Ulrich-PurTOF CAL HADES LGADs Calibrationcurve7TOF-Cal GSI100.4 MeVLow Flux MediumProtonGood19:0019:42    

300 khz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 65kHz on LGAD

TOF Calibration Curve

ELOG V3.1.5-fc6679b