ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Rate Setting |
Particle Type |
Data |
t-Start |
t-Stop |
Duration_min |
Frontend |
Phantom |
Phantom thickness |
Text |
|
57
|
Sat Mar 30 16:15:20 2024 |
hh, mb, ps | 1st tests | 1040 | TJ-Monopix2 | 800 MeV | Low Flux Low | Proton | Unknown | 30.03.2024 16:15:22 | 30.03.2024 16:17:46 | 2 | HV | | | automatic log for run 1040
Comment: |
|
103
|
Sun Aug 25 06:42:38 2024 |
tb-crew | Piggy test | 45 | RD50-MPW4 | 800 MeV | Low Flux Low | Proton | Unknown | 25.08.2024 06:40:52 | 25.08.2024 06:43:04 | 2 | Normal | | | automatic log for run 45
Comment: |
|
107
|
Sun Aug 25 06:51:00 2024 |
tb-crew | Piggy test | 47 | RD50-MPW4 | 800 MeV | Low Flux Very Low | Proton | Unknown | 25.08.2024 06:48:29 | 25.08.2024 06:51:27 | 2 | Normal | | | automatic log for run 47
Comment:
with tracker |
|
124
|
Sun Aug 25 10:06:51 2024 |
tb-crew | only base | 59 | RD50-MPW4 | 800 MeV | Low Flux Very Low | Proton | Crap | 25.08.2024 10:05:01 | 25.08.2024 10:07:18 | 2 | Normal | | | automatic log for run 59
Comment:
reducing base threshold |
|
129
|
Sun Aug 25 11:16:09 2024 |
tb-crew | only base | 64 | RD50-MPW4 | 800 MeV | Low Flux Very Low | Proton | Unknown | 25.08.2024 11:14:19 | 25.08.2024 11:16:36 | 2 | Normal | | | automatic log for run 64
Comment:
experimental DAC settings |
|
130
|
Sun Aug 25 11:19:53 2024 |
tb-crew | only base | 65 | RD50-MPW4 | 800 MeV | Low Flux Very Low | Proton | Unknown | 25.08.2024 11:17:22 | 25.08.2024 11:20:20 | 2 | Normal | | | automatic log for run 65
Comment:
experimental DAC settings |
|
140
|
Fri Dec 13 11:48:21 2024 |
Felix Ulrich-Pur | Shift 23.11.24 low flux He test with RaMon | 1 | RaMon | 205.2 MeV/u | Low Flux Medium | Helium | Good | 06:28 | 06:30 | 2 | | | | Mean rate per spill~ 4-6E5 p/s (online
estimation without proper analysis) |
|
167
|
Sat Dec 14 13:45:34 2024 |
Felix Ulrich-Pur | threshold and preamp tests | 28 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 63.3 MeV/u | Low Flux High | Helium | Good | 13:20 | 13:32 | 2 | | | | TRB Setup: 260V bias and 250mA pre-amps,
threshold 1000 (changed threshold)
Diamond: 900mA, threshold 1000 |
|
135
|
Sun Aug 25 12:23:44 2024 |
tb-crew | only base | 69 | RD50-MPW4 | 175.3 MeV | Low Flux Very Low | Proton | Unknown | 25.08.2024 12:04:32 | 25.08.2024 12:24:10 | 19 | Normal | | | automatic log for run 69
Comment:
E-scan |
|
155
|
Sat Dec 14 13:04:57 2024 |
Felix Ulrich-Pur | Shift 23.11.24 low flux Carbon test with RaMon (did not work) | 16 | RaMon | | Low Flux High | Carbon | Crap | 07:02 | 07:20 | 18 | | | | Low flux carbon did not work
5µs EFE, 10s Extraction,
Deg100 |
|
163
|
Sat Dec 14 13:37:26 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 24 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 73.2 MeV/u | Low Flux High | Helium | Good | 11:42 | 12:00 | 18 | | | | TRB Setup: 260V bias and 250mA pre-amps,
threshold 1000
2MHz with Ramon and only 200kHz |
|
164
|
Sat Dec 14 13:39:15 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 25 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 63.3 MeV/u | Low Flux High | Helium | Good | 12:05 | 12:23 | 18 | | | | TRB Setup: 260V bias and 250mA pre-amps,
threshold 1000
380 kHz with Ramon and only 180kHz |
|
170
|
Sat Dec 14 13:56:16 2024 |
Felix Ulrich-Pur | WET measurement slabs | 31 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 14:48 | 15:06 | 18 | | Plastic Water Slabs | 2cm | 2cm plastic water
TRB Setup: 260V bias and 250mA
pre-amps, threshold 1000 |
|
198
|
Sat Dec 14 15:39:42 2024 |
Felix Ulrich-Pur | plastic mouse radiography | 60 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 97.2MeV/u | Low Flux High | Helium | Good | 23:50 | 00:08 | 18 | | plastic mouse | | pos x=-100, posy=-75
TRB Setup: 260V bias and 250mA
pre-amps, threshold 5000 |
|
207
|
Sat Dec 14 15:45:05 2024 |
Felix Ulrich-Pur | plastic mouse radiography | 69 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 97.2MeV/u | Low Flux High | Helium | Good | 02:07 | 02:25 | 18 | | plastic mouse | | pos x=25, posy=75
TRB Setup: 260V bias and 250mA
pre-amps, threshold 5000 |
|
70
|
Sat Mar 30 20:46:41 2024 |
hh, mb, ps | High statistics | 1053 | TJ-Monopix2 | 800 MeV | Low Flux High | Proton | Unknown | 30.03.2024 20:31:14 | 30.03.2024 20:49:08 | 17 | HV | | | automatic log for run 1053
Comment:
Back to stock veto period of 7us (100)
|
|
158
|
Sat Dec 14 13:26:29 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 19 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 177.8 MeV/u | Low Flux Medium | Helium | Good | 10:08 | 10:25 | 17 | | | | TRB Setup: 260V bias and 250mA pre-amps,
threshold 1000
750kHz with Ramon and only 160kHz |
|
174
|
Sat Dec 14 15:12:46 2024 |
Felix Ulrich-Pur | WET measurement slabs | 35 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 15:53 | 16:10 | 17 | | Plastic Water Slabs | 4cm | 4cm plastic water
TRB Setup: 260V bias and 250mA
pre-amps, threshold 1000 |
|
201
|
Sat Dec 14 15:41:19 2024 |
Felix Ulrich-Pur | plastic mouse radiography | 63 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 97.2MeV/u | Low Flux High | Helium | Good | 00:37 | 00:54 | 17 | | plastic mouse | | pos x=100, posy=-75
TRB Setup: 260V bias and 250mA
pre-amps, threshold 5000 |
|
202
|
Sat Dec 14 15:41:43 2024 |
Felix Ulrich-Pur | plastic mouse radiography | 64 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 97.2MeV/u | Low Flux High | Helium | Good | 00:54 | 01:08 | 17 | | plastic mouse | | pos x=175, posy=-75
TRB Setup: 260V bias and 250mA
pre-amps, threshold 5000 |
|