Sat Mar 30 17:07:45 2024, hh, mb, ps, 1st tests, 1045, TJ-Monopix2, 800 MeV, Low Flux Low, Proton, Unknown, 30.03.2024 17:07:01, 30.03.2024 17:10:12, 3, HV
|
automatic log for run 1045
Comment: |
Sat Mar 30 17:31:59 2024, hh, mb, ps, High statistics, 1046, TJ-Monopix2, 800 MeV, Low Flux Low, Proton, Unknown, 30.03.2024 17:13:09, 30.03.2024 17:34:25, 21, HV
|
automatic log for run 1046
Comment:
High statistics run, from now we fix the geometry
Veto: 7us (100, so 7 us is handshake time) |
Sat Mar 30 18:59:16 2024, hh, mb, ps, 1st tests, 1047, TJ-Monopix2, 800 MeV, Low Flux Low, Proton, Crap, 30.03.2024 19:00:11, 30.03.2024 19:01:43, 1, HV
|
automatic log for run 1047
Comment:
Test if we get beam, MAUS has problems |
Sat Mar 30 19:24:57 2024, hh, mb, ps, High statistics, 1048, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 30.03.2024 19:02:52, 30.03.2024 19:27:24, 24, HV
|
automatic log for run 1048
Comment:
Run with medium settings |
Sat Mar 30 19:36:57 2024, hh, mb, ps, High statistics, 1049, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 30.03.2024 19:28:44, 30.03.2024 19:39:24, 10, HV
|
automatic log for run 1049
Comment:
Try with increased veto period of 20us (800) |
Sat Mar 30 19:44:43 2024, hh, mb, ps, High statistics, 1050, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 30.03.2024 19:40:21, 30.03.2024 19:47:10, 6, HV
|
automatic log for run 1050
Comment:
Try with increased veto period of 20us (800) |
Sat Mar 30 20:13:29 2024, hh, mb, ps, High statistics, 1051, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 30.03.2024 19:48:36, 30.03.2024 20:15:55, 27, HV
|
automatic log for run 1051
Comment:
Try with increased veto period of 20us (800) |
Sat Mar 30 20:27:35 2024, hh, mb, ps, High statistics, 1052, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 30.03.2024 20:17:11, 30.03.2024 20:30:02, 12, HV
|
automatic log for run 1052
Comment:
Back to stock veto period of 7us (100) |
Sat Mar 30 20:46:41 2024, hh, mb, ps, High statistics, 1053, TJ-Monopix2, 800 MeV, Low Flux High, Proton, Unknown, 30.03.2024 20:31:14, 30.03.2024 20:49:08, 17, HV
|
automatic log for run 1053
Comment:
Back to stock veto period of 7us (100)
Lets try with high |
Sat Mar 30 20:51:31 2024, hh, mb, ps, High statistics, 1054, TJ-Monopix2, 800 MeV, Low Flux High, Proton, Unknown, 30.03.2024 20:50:53, 30.03.2024 20:53:58, 3, HV
|
automatic log for run 1054
Comment:
Litle high settings run |
Sat Jun 8 21:41:04 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs Calibrationcurve, 9, TOF-Cal GSI, 62.4 MeV, Low Flux High, Proton, Good, 20:55, 21:21, ,
|
changed back to high due to beamsize vs LGAD size factor
650 khz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 230kHz on LGAD
TOF Calibration Curve |
Sat Jun 8 19:53:47 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs Test High Rate, 1, TOF-Cal GSI, 252.7 MeV, Low Flux High, Proton, Good, 16:00, 16:18, ,
|
7.5 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 2.5 MHz on LGAD |
Sat Jun 8 19:56:37 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs Calibrationcurve, 2, TOF-Cal GSI, 252.7 MeV, Low Flux Medium, Proton, Good, 16:29, 16:47, ,
|
1 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 350kHz on LGAD
TOF Calibration Curve |
Sat Jun 8 19:57:39 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs Calibrationcurve, 3, TOF-Cal GSI, 194.3 MeV, Low Flux Medium, Proton, Good, 16:51, 17:28, ,
|
600 khz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 235kHz on LGAD
TOF Calibration Curve |
Sat Jun 8 21:42:13 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Wasser, 10, TOF-Cal GSI, 194.3 MeV, Low Flux High, Proton, Good, 21:27, 21:39, ,
|
1cm plastic water (in isocentre)
6 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1.5 MHz on LGAD
WET measurement |
Sat Jun 8 21:54:59 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Wasser, 12, TOF-Cal GSI, 194.3 MeV, Low Flux High, Proton, Good, 21:53, 22:05, ,
|
2cm plastic water (in isocentre)
5 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1.2 MHz on LGAD
WET measurement |
Sat Jun 8 22:38:41 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Wasser, 14, TOF-Cal GSI, 194.3 MeV, Low Flux High, Proton, Good, 22:19, 22.34, ,
|
3 cm plastic water (in isocentre)
4.3 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1MHz on LGAD
WET measurement |
Sun Jun 9 00:04:23 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Wasser, 15, TOF-Cal GSI, 194.3 MeV, Low Flux High, Proton, Good, 22:34, 22:50, ,
|
3 cm plastic water (in isocentre)
2.6 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 400 kHz on LGAD
WET measurement |
Sun Jun 9 00:05:11 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Wasser (wrong energy), 16, TOF-Cal GSI, 194.3 MeV, Low Flux High, Proton, Crap, 22:50, 22:52, ,
|
wrong energy don't use |
Sun Jun 9 00:06:01 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Wasser, 17, TOF-Cal GSI, 194.3 MeV, Low Flux High, Proton, Good, 22:53, 23:04, ,
|
4 cm plastic water (in isocentre)
3.8 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 900 kHz on LGAD
WET measurement |
|