ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Rate Setting |
Particle Type |
Data |
t-Start |
t-Stop |
Duration_min |
Frontend |
Phantom |
Phantom thickness |
Text |
|
159
|
Sat Dec 14 13:28:57 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 20 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux Medium | Helium | Good | 10:33 | 10:38 | 5 | | | | TRB Setup: 260V bias and 250mA pre-amps,
threshold 1000
300kHz with Ramon and only 40kHz |
|
188
|
Sat Dec 14 15:28:46 2024 |
Felix Ulrich-Pur | threshold and preamp tests | 49 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 97.2MeV/u | Low Flux High | Helium | Good | 20:04 | 20:09 | 5 | | | | TRB Setup: 260V bias and 250mA pre-amps,
threshold 10000 (was too high)
Diamond: 900mA, threshold 1000 |
|
169
|
Sat Dec 14 13:49:20 2024 |
Felix Ulrich-Pur | WET measurement slabs | 30 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 14:02 | 14:45 | 43 | | Plastic Water Slabs | 1cm | 1cm plastic water
TRB Setup: 260V bias and 250mA
pre-amps, threshold 1000 |
|
4
|
Sat Mar 30 07:00:10 2024 |
bp, ci, hh | RD50-MPW4 | 1001 | RD50-MPW4 | 800 MeV | Low Flux Very Low | Proton | Unknown | 30.03.2024 06:58:03 | 30.03.2024 07:02:36 | 4 | Normal | | | automatic log for run 1001
Comment:
1st test runs |
|
51
|
Sat Mar 30 15:31:41 2024 |
hh, mb, ps | 1st tests | 1034 | TJ-Monopix2 | 800 MeV | Low Flux Low | Proton | Unknown | 30.03.2024 15:29:49 | 30.03.2024 15:34:08 | 4 | HV | | | automatic log for run 1034
Comment: |
|
60
|
Sat Mar 30 16:50:35 2024 |
hh, mb, ps | 1st tests | 1043 | TJ-Monopix2 | 800 MeV | Low Flux Low | Proton | Unknown | 30.03.2024 16:48:39 | 30.03.2024 16:53:01 | 4 | HV | | | automatic log for run 1043
Comment: |
|
218
|
Sat Dec 14 15:50:19 2024 |
Felix Ulrich-Pur | LGAD+Diamond test with clinical carbon beam | 80 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 402MeV/u | | Carbon | Good | 05:15 | 05:50 | 35 | | | | Carbon Deg10 (clinical rate)
TRB Setup: 260V bias and 250mA
pre-amps, threshold 5000 |
|
193
|
Sat Dec 14 15:35:56 2024 |
Felix Ulrich-Pur | plastic mouse radiography | 55 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 97.2MeV/u | Low Flux High | Helium | Good | 22:12 | 22:45 | 33 | | plastic mouse | | pos x=25, posy=0
TRB Setup: 260V bias and 250mA
pre-amps, threshold 5000 |
|
40
|
Sat Mar 30 12:28:29 2024 |
bp, ci, hh | useful datataking | 1024 | RD50-MPW4 | 800 MeV | Low Flux Low | Proton | Good | 30.03.2024 11:58:45 | 30.03.2024 12:30:56 | 32 | Normal | | | automatic log for run 1024
Comment:
changed thr to 1V (not 100% sure, configure |
|
42
|
Sat Mar 30 13:28:15 2024 |
bp, ci, hh | useful datataking | 1026 | RD50-MPW4 | 800 MeV | Low Flux Low | Proton | Good | 30.03.2024 12:58:02 | 30.03.2024 13:30:42 | 32 | Normal | | | automatic log for run 1026
Comment:
changed thr to 0.98V |
|
35
|
Sat Mar 30 10:34:27 2024 |
bp, ci, hh | RD50-MPW4 | 1020 | RD50-MPW4 | 800 MeV | Low Flux Low | Proton | Good | 30.03.2024 10:33:01 | 30.03.2024 10:36:53 | 3 | Normal | | | automatic log for run 1020
Comment: |
|
37
|
Sat Mar 30 11:04:10 2024 |
bp, ci, hh | RD50-MPW4 | 1022 | RD50-MPW4 | 800 MeV | Low Flux Low | Proton | Good | 30.03.2024 11:03:05 | 30.03.2024 11:06:37 | 3 | Normal | | | automatic log for run 1022
Comment:
changed alignment again |
|
45
|
Sat Mar 30 15:05:28 2024 |
hh, mb, ps | 1st tests | 1028 | TJ-Monopix2 | 800 MeV | Low Flux Low | Proton | Unknown | 30.03.2024 15:04:47 | 30.03.2024 15:07:55 | 3 | HV | | | automatic log for run 1028
Comment: |
|
54
|
Sat Mar 30 15:55:32 2024 |
hh, mb, ps | 1st tests | 1037 | TJ-Monopix2 | 800 MeV | Low Flux Low | Proton | Unknown | 30.03.2024 15:54:44 | 30.03.2024 15:57:59 | 3 | HV | | | automatic log for run 1037
Comment: |
|
62
|
Sat Mar 30 17:07:45 2024 |
hh, mb, ps | 1st tests | 1045 | TJ-Monopix2 | 800 MeV | Low Flux Low | Proton | Unknown | 30.03.2024 17:07:01 | 30.03.2024 17:10:12 | 3 | HV | | | automatic log for run 1045
Comment: |
|
71
|
Sat Mar 30 20:51:31 2024 |
hh, mb, ps | High statistics | 1054 | TJ-Monopix2 | 800 MeV | Low Flux High | Proton | Unknown | 30.03.2024 20:50:53 | 30.03.2024 20:53:58 | 3 | HV | | | automatic log for run 1054
Comment:
Litle high settings run |
|
168
|
Sat Dec 14 13:46:11 2024 |
Felix Ulrich-Pur | WET measurement slabs | 29 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 13:34 | 14:03 | 29 | | Plastic Water Slabs | 1cm | 1cm Plastic Water
TRB Setup: 260V bias and 250mA
pre-amps, threshold 1000 (changed threshold) |
|
68
|
Sat Mar 30 20:13:29 2024 |
hh, mb, ps | High statistics | 1051 | TJ-Monopix2 | 800 MeV | Low Flux Medium | Proton | Unknown | 30.03.2024 19:48:36 | 30.03.2024 20:15:55 | 27 | HV | | | automatic log for run 1051
Comment:
Try with increased veto period of 20us (800) |
|
114
|
Sun Aug 25 08:10:54 2024 |
tb-crew | Piggy test | 51 | RD50-MPW4 | 800 MeV | Low Flux Very Low | Proton | Unknown | 25.08.2024 07:45:15 | 25.08.2024 08:11:20 | 26 | Normal | | | automatic log for run 51
Comment:
stuck again? |
|
161
|
Sat Dec 14 13:34:18 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 21 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 97.2MeV/u | Low Flux High | Helium | Good | 10:58 | 11:23 | 25 | | | | TRB Setup: 260V bias and 250mA pre-amps,
threshold 1000
3MHz with Ramon and only 300kHz |
|