Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  Testbeams at MedAustron in 2023, Page 8 of 11  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
IDdown Date Author Subject Run Number DUT Beam Energy Rate Setting Particle Type Events Data t-Start t-Stop Duration_min Frontend
  78   Thu Apr 27 15:59:00 2023 Felix Ulrich-Pursandwich TOF-iCT calibration025 100.4Low Flux MediumProton Good    

23.04.23 05:00 trigger on third LGAD

21 PMMA slabs (~3.5cm)

  77   Thu Apr 27 15:58:35 2023 Felix Ulrich-Pursandwich TOF-iCT calibration024 83Low Flux MediumProton Good    

23.04.23 04:37 trigger on third LGAD

18 PMMA slabs (~3cm)

  76   Thu Apr 27 15:58:04 2023 Felix Ulrich-Pursandwich TOF-iCT calibration023 100.4Low Flux MediumProton Good    

23.04.23 04:20 trigger on third LGAD

18 PMMA slabs (~3cm)

  75   Thu Apr 27 15:57:31 2023 Felix Ulrich-Pursandwich TOF-iCT calibration022 83Low Flux MediumProton Good    

23.04.23 03:58 trigger on third LGAD

15 PMMA slabs (~2.5cm)

  74   Thu Apr 27 15:56:37 2023 Felix Ulrich-Pursandwich TOF-iCT calibration021 100.4Low Flux MediumProton Good    

23.04.23 03:40 trigger on third LGAD

15 PMMA slabs (~2.5cm)

  73   Thu Apr 27 15:56:18 2023 Felix Ulrich-Pursandwich TOF-iCT calibration020 83Low Flux MediumProton Good    

23.04.23 03:19 trigger on third LGAD

12 PMMA slabs (~2cm)

  72   Thu Apr 27 15:55:35 2023 Felix Ulrich-Pursandwich TOF-iCT calibration019 100.4Low Flux MediumProton Good    

23.04.23 03:05 trigger on third LGAD

12 PMMA slabs (~2cm)

  71   Thu Apr 27 15:54:15 2023 Felix Ulrich-Pursandwich TOF-iCT calibration018 83Low Flux MediumProton Good    

23.04.23 02:43 trigger on third LGAD

9 PMMA slabs (~1.5cm)

  70   Thu Apr 27 15:53:54 2023 Felix Ulrich-Pursandwich TOF-iCT calibration017 100.4Low Flux MediumProton Good    

23.04.23 02:28 trigger on third LGAD

9 PMMA slabs (~1.5cm)

  69   Thu Apr 27 15:53:11 2023 Felix Ulrich-Pursandwich TOF-iCT calibration016 83Low Flux MediumProton Good    

23.04.23 02:07 trigger on third LGAD

3 PMMA slabs (~0.5cm)

  68   Thu Apr 27 15:52:25 2023 Felix Ulrich-Pursandwich TOF-iCT calibration015 100.4Low Flux MediumProton Good    

23.04.23 01:47 trigger on third LGAD

3 PMMA slabs (~0.5cm)

 

01:53 fail accelerator

  67   Thu Apr 27 15:52:02 2023 Felix Ulrich-Pursandwich TOF-iCT calibration014 83Low Flux MediumProton Good    

23.04.23 01:26 trigger on third LGAD

6 PMMA slabs (~1cm)

  66   Thu Apr 27 15:51:18 2023 Felix Ulrich-Pursandwich TOF-iCT calibration013 100.4Low Flux MediumProton Good    

23.04.23 01:09 trigger on third LGAD

6 PMMA slabs (~1cm)

  65   Thu Apr 27 15:50:55 2023 Felix Ulrich-PurLGAD beam telescope calibration012 100.4Low Flux MediumProton Good    

23.04.23 00:35 trigger on third LGAD

no DUT

  64   Thu Apr 27 15:49:58 2023 Felix Ulrich-PurLGAD beam telescope calibration011 145.4Low Flux MediumProton Good    

23.04.23 00:17 trigger on third LGAD

no DUT

  63   Thu Apr 27 15:49:27 2023 Felix Ulrich-PurLGAD beam telescope calibration010 252.7Low Flux MediumProton Good    

22.04.23 23:58 trigger on third LGAD

no DUT

beam was down between 00:05 and 00:15

  62   Thu Apr 27 15:48:29 2023 Felix Ulrich-PurLGAD beam telescope calibration009 83Low Flux MediumProton Good    

22.04.23 23:35 trigger on third LGAD

no DUT

  61   Thu Apr 27 15:47:05 2023 Felix Ulrich-PurLGAD beam telescope calibration008 800200kHzProton Good    

22.04.23 23:20 trigger on third LGAD

beam spot was off. telescope was shifted

  60   Thu Apr 27 15:45:23 2023 Felix Ulrich-PurLGAD beam telescope calibration007 800200kHzProton Good    

22.04.23 trigger on second LGAD (run 006 is missing since cable of pre-amps was loose and 3rd sensor signal was lost)

  59   Thu Apr 27 15:44:37 2023 Felix Ulrich-Purlow flux p800 recommissioning005 8001.2MHzProton Good    

Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2)
rate slightly lower due to additional material in front
higher voltage in PMTs (no significant change in rate)

ELOG V3.1.5-fc6679b