Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  Testbeams at MedAustron in 2023, Page 8 of 11  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Thu Apr 27 15:59:00 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 025, , 100.4, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 05:00 trigger on third LGAD

21 PMMA slabs (~3.5cm)
Entry  Thu Apr 27 15:58:35 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 024, , 83, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 04:37 trigger on third LGAD

18 PMMA slabs (~3cm)
Entry  Thu Apr 27 15:58:04 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 023, , 100.4, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 04:20 trigger on third LGAD

18 PMMA slabs (~3cm)
Entry  Thu Apr 27 15:57:31 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 022, , 83, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 03:58 trigger on third LGAD

15 PMMA slabs (~2.5cm)
Entry  Thu Apr 27 15:56:37 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 021, , 100.4, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 03:40 trigger on third LGAD

15 PMMA slabs (~2.5cm)
Entry  Thu Apr 27 15:56:18 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 020, , 83, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 03:19 trigger on third LGAD

12 PMMA slabs (~2cm)
Entry  Thu Apr 27 15:55:35 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 019, , 100.4, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 03:05 trigger on third LGAD

12 PMMA slabs (~2cm)
Entry  Thu Apr 27 15:54:15 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 018, , 83, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 02:43 trigger on third LGAD

9 PMMA slabs (~1.5cm)
Entry  Thu Apr 27 15:53:54 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 017, , 100.4, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 02:28 trigger on third LGAD

9 PMMA slabs (~1.5cm)
Entry  Thu Apr 27 15:53:11 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 016, , 83, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 02:07 trigger on third LGAD

3 PMMA slabs (~0.5cm)
Entry  Thu Apr 27 15:52:25 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 015, , 100.4, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 01:47 trigger on third LGAD

3 PMMA slabs (~0.5cm)

 
Entry  Thu Apr 27 15:52:02 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 014, , 83, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 01:26 trigger on third LGAD

6 PMMA slabs (~1cm)
Entry  Thu Apr 27 15:51:18 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 013, , 100.4, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 01:09 trigger on third LGAD

6 PMMA slabs (~1cm)
Entry  Thu Apr 27 15:50:55 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 012, , 100.4, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 00:35 trigger on third LGAD

no DUT
Entry  Thu Apr 27 15:49:58 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 011, , 145.4, Low Flux Medium, Proton, , Good, , , ,  
23.04.23 00:17 trigger on third LGAD

no DUT
Entry  Thu Apr 27 15:49:27 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 010, , 252.7, Low Flux Medium, Proton, , Good, , , ,  
22.04.23 23:58 trigger on third LGAD

no DUT

beam was down between 00:05 and 00:15
Entry  Thu Apr 27 15:48:29 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 009, , 83, Low Flux Medium, Proton, , Good, , , ,  
22.04.23 23:35 trigger on third LGAD

no DUT
Entry  Thu Apr 27 15:47:05 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 008, , 800, 200kHz, Proton, , Good, , , ,  
22.04.23 23:20 trigger on third LGAD

beam spot was off. telescope was shifted
Entry  Thu Apr 27 15:45:23 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 007, , 800, 200kHz, Proton, , Good, , , ,  
22.04.23 trigger on second LGAD (run 006 is missing since cable of pre-amps was loose and 3rd sensor signal was lost)
Entry  Thu Apr 27 15:44:37 2023, Felix Ulrich-Pur, low flux p800 recommissioning, 005, , 800, 1.2MHz, Proton, , Good, , , ,  
Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front
of the RaMon scintillators (5x5cm^2)
rate slightly lower due to additional material in front
ELOG V3.1.5-fc6679b