Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2) rate slightly lower due to additional material in front
22.04.23 trigger on second LGAD (run 006 is missing since cable of pre-amps was loose and 3rd sensor signal was lost)
22.04.23 23:20 trigger on third LGAD
beam spot was off. telescope was shifted