ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Rate Setting |
Particle Type |
Events |
Data |
t-Start |
t-Stop |
Duration_min |
Frontend |
Text |
![Attachments Attachments](attachment.png) |
78
|
Thu Apr 27 15:59:00 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 025 | | 100.4 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 05:00 trigger on third LGAD
21 PMMA slabs (~3.5cm) |
|
77
|
Thu Apr 27 15:58:35 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 024 | | 83 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 04:37 trigger on third LGAD
18 PMMA slabs (~3cm) |
|
76
|
Thu Apr 27 15:58:04 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 023 | | 100.4 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 04:20 trigger on third LGAD
18 PMMA slabs (~3cm) |
|
75
|
Thu Apr 27 15:57:31 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 022 | | 83 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 03:58 trigger on third LGAD
15 PMMA slabs (~2.5cm) |
|
74
|
Thu Apr 27 15:56:37 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 021 | | 100.4 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 03:40 trigger on third LGAD
15 PMMA slabs (~2.5cm) |
|
73
|
Thu Apr 27 15:56:18 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 020 | | 83 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 03:19 trigger on third LGAD
12 PMMA slabs (~2cm) |
|
72
|
Thu Apr 27 15:55:35 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 019 | | 100.4 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 03:05 trigger on third LGAD
12 PMMA slabs (~2cm) |
|
71
|
Thu Apr 27 15:54:15 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 018 | | 83 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 02:43 trigger on third LGAD
9 PMMA slabs (~1.5cm) |
|
70
|
Thu Apr 27 15:53:54 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 017 | | 100.4 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 02:28 trigger on third LGAD
9 PMMA slabs (~1.5cm) |
|
69
|
Thu Apr 27 15:53:11 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 016 | | 83 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 02:07 trigger on third LGAD
3 PMMA slabs (~0.5cm) |
|
68
|
Thu Apr 27 15:52:25 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 015 | | 100.4 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 01:47 trigger on third LGAD
3 PMMA slabs (~0.5cm)
|
|
67
|
Thu Apr 27 15:52:02 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 014 | | 83 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 01:26 trigger on third LGAD
6 PMMA slabs (~1cm) |
|
66
|
Thu Apr 27 15:51:18 2023 |
Felix Ulrich-Pur | sandwich TOF-iCT calibration | 013 | | 100.4 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 01:09 trigger on third LGAD
6 PMMA slabs (~1cm) |
|
65
|
Thu Apr 27 15:50:55 2023 |
Felix Ulrich-Pur | LGAD beam telescope calibration | 012 | | 100.4 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 00:35 trigger on third LGAD
no DUT |
|
64
|
Thu Apr 27 15:49:58 2023 |
Felix Ulrich-Pur | LGAD beam telescope calibration | 011 | | 145.4 | Low Flux Medium | Proton | | Good | | | | | 23.04.23 00:17 trigger on third LGAD
no DUT |
|
63
|
Thu Apr 27 15:49:27 2023 |
Felix Ulrich-Pur | LGAD beam telescope calibration | 010 | | 252.7 | Low Flux Medium | Proton | | Good | | | | | 22.04.23 23:58 trigger on third LGAD
no DUT
beam was down between 00:05 and |
|
62
|
Thu Apr 27 15:48:29 2023 |
Felix Ulrich-Pur | LGAD beam telescope calibration | 009 | | 83 | Low Flux Medium | Proton | | Good | | | | | 22.04.23 23:35 trigger on third LGAD
no DUT |
|
61
|
Thu Apr 27 15:47:05 2023 |
Felix Ulrich-Pur | LGAD beam telescope calibration | 008 | | 800 | 200kHz | Proton | | Good | | | | | 22.04.23 23:20 trigger on third LGAD
beam spot was off. telescope was
shifted |
|
60
|
Thu Apr 27 15:45:23 2023 |
Felix Ulrich-Pur | LGAD beam telescope calibration | 007 | | 800 | 200kHz | Proton | | Good | | | | | 22.04.23 trigger on second LGAD (run 006
is missing since cable of pre-amps was loose
and 3rd sensor signal was lost) |
|
59
|
Thu Apr 27 15:44:37 2023 |
Felix Ulrich-Pur | low flux p800 recommissioning | 005 | | 800 | 1.2MHz | Proton | | Good | | | | | Measurement with RaMon 22.04.23 (not placed
in isocentre) LGAD beam telescope was placed
in front. LGADs were moved out of the beam. |
|