23.04.23 03:40 trigger on third LGAD
15 PMMA slabs (~2.5cm)
23.04.23 03:58 trigger on third LGAD
23.04.23 04:20 trigger on third LGAD
18 PMMA slabs (~3cm)
23.04.23 04:37 trigger on third LGAD
23.04.23 05:00 trigger on third LGAD
21 PMMA slabs (~3.5cm)
23.04.23 05:18 trigger on third LGAD
23.04.23 05:55 trigger on third LGAD
1cm Al stair phantom profile view (i.e. only 1cm Al) 0deg
23.04.23 07:35 trigger on third LGAD
23.04.23 09:36 trigger on third LGAD
1cm Al stair phantom frontal view (i.e. 5 steps) 90deg
23.04.23 10:38 trigger on third LGAD
20 PMMA slabs
23.04.23 10:53 trigger on third LGAD
23.04.23 11:13 trigger on third LGAD
19 PMMA slabs
23.04.23 11:43 trigger on third LGAD
run 33 is missing as accelerator failed
23.04.23 12:03 trigger on third LGAD
17 PMMA slabs
23.04.23 12:35 trigger on third LGAD
2cm Al slab with hole (in front of only half of the sensor)
23.04.23 13:00 trigger on third LGAD
XML für local run: MPW3_TJMP2_20230506_00-000099.xml
XML für TLU runs (global): MPW3_TJMP2_20230506_TLU_00-000099.xml
Orientation of tracker, MPW3 and TJMP2