ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Rate Setting |
Particle Type |
Events |
Data |
Beam Betatron |
Beam Chopper |
Beam Degrader |
Beam EFE |
Beam Orb |
Beam QuadScan |
PhantomType |
PhantomAngle |
Text |
 |
81
|
Sat Feb 27 09:40:15 2021 |
Felix Ulrich-Pur | Rate verification | 7 | SiC+Si+RaMon | 62.4 | I(EFE+SID0) | | | Good | | | | | | | | | Start 07:40
rate looks fine, however operators
mentioned, that CPD data might have been |
|
152
|
Tue Mar 16 14:57:21 2021 |
Patrick Sieberer | Pad Sensoren | 7 | | 62.4 | III(EFE+SID2) | Proton | | Good | | | | | | | none | | Start: 07:54
Range Shifter Out, Filter 1 IN, Filter
2 IN |
|
233
|
Sun Jun 20 19:37:37 2021 |
Felix Ulrich-Pur | HADES energy run | 7 | HADES-LGADs | 83 | I(EFE+SID0) | Proton | | Good | | | | | | | none | 0 | TB 19.6.21
Start 18:48
Mean rate O(MHz) |
|
279
|
Sun Nov 7 18:57:03 2021 |
Felix Ulrich-Pur | Low flux test 7.11.21 | 7 | | 252.7 | II(BETA+EFE) | | 30 spills | Good | | | | | | | none | | Start: 07:13 O(100kHz) |
|
318
|
Sat Oct 8 09:02:20 2022 |
Patrick Sieberer | ramon + tracker + DUT | 7 | RD50-MPW3 | 252.7 | | | 5 min data taking | Good | lowflux high | | | | | | | | First data run w/ ramon + tracker + MPW3
+ monitor connected |
|
62
|
Wed Jan 20 17:42:31 2021 |
Felix Ulrich-Pur | Lowflux p800 commissioning | 69 | Ramon+Tracker | 800 | | | 30 spills | | 11% | 60.5% | 20 | 10 | 6dB | | | | MT=1, BSY=50,
setting IV
|
|
111
|
Sat Feb 27 23:39:57 2021 |
Christian Irmler | E Scan DSSD+SiC | 69 | SiC+DSSD tracker | 62.4 | II(BETA+EFE) | Proton | 7E5 | Good | | | | | | | | | Start 19:14:
Final MT=1, final BSY length =600
(2kHz), Trigger latency 41 optimal |
|
206
|
Tue Mar 16 15:32:48 2021 |
Patrick Sieberer | SiC strip sensor | 69 | SiC+DSSD tracker | 62.4 | II(BETA+EFE) | Proton | | Crap | | | | | | | | | Testrun for Beam
Ripple Filter jumping around |
|
61
|
Wed Jan 20 17:42:02 2021 |
Felix Ulrich-Pur | Lowflux p800 commissioning | 68 | Ramon+Tracker | 800 | | | 30 spills | | 11% | 60% | 20 | 10 | 6dB | | | | MT=1, BSY=50,
setting IV
|
|
110
|
Sat Feb 27 23:35:43 2021 |
Christian Irmler | E Scan DSSD+SiC | 68 | SiC+DSSD tracker | 83 | II(BETA+EFE) | Proton | 5E5 | Good | | | | | | | | | Start 19:00:
Final MT=1, final BSY length =600
(2kHz), Trigger latency 41 optimal |
|
205
|
Tue Mar 16 15:32:10 2021 |
Patrick Sieberer | SiC strip sensor | 68 | SiC+DSSD tracker | 62.4 | II(BETA+EFE) | Proton | | Crap | | | | | | | | | Testrun for Beam
Davor: Filter-Spiele :D |
|
60
|
Wed Jan 20 17:41:27 2021 |
Felix Ulrich-Pur | Lowflux p800 commissioning | 67 | Ramon+Tracker | 800 | | | 30 spills | | 10% | 60.5% | 20 | 10 | 6dB | | | | MT=1, BSY=50,
beam shifted again
max 30kHz, low rate |
|
109
|
Sat Feb 27 23:33:55 2021 |
Christian Irmler | HV Scan DSSD+SiC | 67 | SiC+DSSD tracker | 100.4 | II(BETA+EFE) | Proton | 5E5 | Good | | | | | | | | | Start 18:46:
Final MT=1, final BSY length =600
(2kHz), Trigger latency 41 optimal |
|
204
|
Tue Mar 16 15:31:06 2021 |
Patrick Sieberer | SiC strip sensor | 67 | SiC+DSSD tracker | 62.4 | II(BETA+EFE) | Proton | | Good | | | | | | | | | Energy Scan SiC Sensor
23:37
30.000 Hz, falsche Rate -> Filter |
|
58
|
Wed Jan 20 17:35:51 2021 |
Felix Ulrich-Pur | Lowflux p800 commissioning | 66 | Ramon+Tracker | 800 | | | 30 spills | | 10% | 62% | 20 | 10 | 6dB | | | | MT=1, BSY=50,
beam is centered
rate few 100kHz and two peaks in beam |
|
108
|
Sat Feb 27 23:33:19 2021 |
Christian Irmler | HV Scan DSSD+SiC | 66 | SiC+DSSD tracker | 100.4 | II(BETA+EFE) | Proton | 5E5 | Good | | | | | | | | | Start 18:33:
Final MT=1, final BSY length =600
(2kHz), Trigger latency 41 optimal |
|
203
|
Tue Mar 16 15:29:55 2021 |
Patrick Sieberer | SiC strip sensor | 66 | SiC+DSSD tracker | 62.4 | II(BETA+EFE) | Proton | | Crap | | | | | | | | | Energy Scan SiC Sensor
23:36
timing zu frueh |
|
59
|
Wed Jan 20 17:36:21 2021 |
Felix Ulrich-Pur | Lowflux p800 commissioning | 65 | Ramon+Tracker | 800 | | | 30 spills | | 10% | 80% | 20 | 10 | 6dB | | | | MT=1, BSY=50,
beam shifted again
jumps in rate too high |
|
107
|
Sat Feb 27 23:32:40 2021 |
Christian Irmler | HV Scan DSSD+SiC | 65 | SiC+DSSD tracker | 100.4 | II(BETA+EFE) | Proton | 5E5 | Good | | | | | | | | | Start 18:20:
Final MT=1, final BSY length =500
(2kHz), Trigger latency 41 optimal |
|
202
|
Tue Mar 16 15:29:14 2021 |
Patrick Sieberer | SiC strip sensor | 65 | Ramon+Tracker | 252.7 | I(EFE+SID0) | Proton | | Good | | | | | | | | | 2er Koinzidenz
Alignment Run SiC
23:21 |
|