Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2021, Page 16 of 18  Not logged in ELOG logo
Entry  Thu Oct 7 11:11:42 2021, Philipp Gaggl, Pad Sensoren, 33, SiC+Si, 120, , Carbon, , Unknown, , , 10, , , , ,  
beamtime on 18.09.2021
CH1: SiC
CH3: Si
Entry  Thu Oct 7 11:12:10 2021, Philipp Gaggl, Pad Sensoren, 34, SiC+Si, 62.4, , Proton, , Unknown, , , 10, , , , ,  
beamtime on 18.09.2021
CH1: SiC
CH3: Si
Entry  Thu Oct 7 11:12:44 2021, Philipp Gaggl, Pad Sensoren, 35, SiC+Si, 62.4, , Proton, , Unknown, , , 10, , , , ,  
beamtime on 18.09.2021
CH1: SiC
CH3: Si
Entry  Thu Oct 7 11:13:05 2021, Philipp Gaggl, Pad Sensoren, 36, SiC+Si, 62.4, , Proton, , Unknown, , , 10, , , , ,  
beamtime on 18.09.2021
CH1: SiC
CH3: Si
Entry  Thu Oct 7 11:13:21 2021, Philipp Gaggl, Pad Sensoren, 37, SiC+Si, 62.4, , Proton, , Unknown, , , 10, , , , ,  
beamtime on 18.09.2021
CH1: SiC
CH3: Si
Entry  Thu Oct 7 11:13:46 2021, Philipp Gaggl, Pad Sensoren, 38, SiC+Si, , , , , Unknown, , , , , , , ,  
beamtime on 18.09.2021
CH1: SiC
CH3: Si
Entry  Sun Nov 21 13:51:53 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 1, SiC+Si, 62.4, I(EFE+SID0), Proton, 10000, , , , , , , , ,  
Bias voltage SiC: 800

Bias voltage Si: -150

From a beam perspective the Si detector was the first target, on oscilloscope  channel 1, SiC was the second target connected to oscilloscope
Entry  Sun Nov 21 13:55:05 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 2, SiC+Si, 62.4, I(EFE+SID0), Proton, 1000000, , , , , , , , ,  
Bias voltage SiC: 800

Bias voltage Si: -150

From a beam perspective the Si detector was the first target, on oscilloscope  channel 1, SiC was the second target connected to oscilloscope
Entry  Sun Nov 21 14:05:18 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 3, , 62.4, I(EFE+SID0), Proton, 10000, , , , , , , , ,  
Bias voltage SiC: 800

Bias voltage Si LGAD: -100

From a beam perspective the SiC detector was the first target, on oscilloscope channel 4, the Si LGAD was the second target connected to oscilloscope
Entry  Sun Nov 21 14:53:00 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 4, Diamond+LGAD, 62.4, I(EFE+SID0), Proton, 100000, , , , , , , , ,  
Bias voltage Diamond: 500

Bias voltage Si LGAD: -100

From a beam perspective the Diamond detector was the first target, on oscilloscope channel 4, the Si LGAD was the second target connected to
Entry  Sat Oct 8 07:10:31 2022, Christian Irmler, RD50-MPW3 - First Testbeam, , , , , , , , , , , , , , ,  hvcmos_mpw3_20221008_TLU_00-000053.xml
Tracker xml file: hvcmos_mpw3_20221008_TLU_00-000053.xml

 
Entry  Sat Oct 8 07:11:03 2022, Christian Irmler, Ramon only, 1, RD50-MPW3, 800, , Proton, , Crap, lowflux high, , , , , , ,  
 
Entry  Sat Oct 8 07:20:45 2022, Christian Irmler, testrun ramon + tracker + DUT, 2, RD50-MPW3, 800, , , , Crap, lowflux high, , , , , , ,  
Tracker timing wrong, latency too low, peak at 0 --> changed lat from 40 to 41 for next run.
Entry  Sat Oct 8 07:28:42 2022, Christian Irmler, testrun ramon + tracker + DUT, 3, RD50-MPW3, 800, , , , Unknown, lowflux high, , , , , , ,  
Tracker latency lat=42
Entry  Sat Oct 8 07:30:37 2022, Christian Irmler, testrun ramon + tracker + DUT, 4, RD50-MPW3, 800, , , , Unknown, lowflux high, , , , , , ,  beam-profil-tracker.pngtiming_tracker.png
Tracker latency lat=42

RD50-MPW3 monitor connected first
Entry  Sat Oct 8 07:40:51 2022, Christian Irmler, ramon + tracker + DUT, 5, RD50-MPW3, 800, , , 24260338, Good, lowflux high, , , , , , ,  
Tracker latency lat=42

First data run w/ ramon + tracker + MPW3 + monitor connected

Tracker dropped some udp packages, total tracker events 23166448
Entry  Sat Oct 8 08:43:15 2022, Christian Irmler, ramon + tracker + DUT, 6, RD50-MPW3, 252.7, , , , Good, lowflux high, , , , , , ,  APV_sync_error.png
~4 MHz particle rate
MPW3 data file size after 5 minutes: 11 GB :-$

Tracker lost data again.
Entry  Sat Oct 8 09:02:20 2022, Patrick Sieberer, ramon + tracker + DUT, 7, RD50-MPW3, 252.7, , , 5 min data taking, Good, lowflux high, , , , , , ,  
First data run w/ ramon + tracker + MPW3 + monitor connected
Entry  Sat Oct 8 09:07:48 2022, Patrick Sieberer, ramon + tracker + DUT, 8, RD50-MPW3, 252.7, , , kurz, Good, lowflux high, , , , , , ,  
short run for uploading to analysis
Entry  Sat Oct 8 09:08:13 2022, Patrick Sieberer, ramon + tracker + DUT, 9, RD50-MPW3, 252.7, , , kurz, Good, lowflux high, , , , , , ,  
TLU: 6,8M Tracker nur 4 M -> Let's reset FADC
ELOG V3.1.5-fc6679b