Entry  Sun Jan 10 06:33:22 2021, Maximilian Tomaschek, Lowflux recommissioning, 3, Ramon+Tracker, 175.3, , , 30 spills, , 10%, , 10, 1, , , ,  
Rate
Entry  Tue Mar 16 14:54:40 2021, Patrick Sieberer, Pad Sensoren, 3, , 252.7, III(EFE+SID2), Proton, , Good, , , , , , , none,  
Start: 07:00
Range Shifter Out, Filter 1 IN, Filter 2 IN
Scintillators in front 
Entry  Wed May 12 08:48:19 2021, Felix Ulrich-Pur, Alu 0deg, 3, Drehtisch, 100.4, II(BETA+EFE), Proton, , Good, , , , , , , Alu, 0 
TB 24.4.21
 

0deg (1cm Alu) Profil von Stiege
Entry  Sun Jun 20 19:33:06 2021, Felix Ulrich-Pur, HADES testrun with increased rate 100.4MeV, 3, HADES-LGADs, 100.4, I(EFE+SID0), Proton, , Good, , , , , , , none, 0 
TB 19.6.21

Start 11:21
paused beam at 13:36
Entry  Sun Nov 7 18:52:29 2021, Felix Ulrich-Pur, Low flux test 7.11.21, 3, , 800, VII, , 30 spills, Good, , , , , , , none,  
Start: 06:46 O(MHz)
Entry  Sun Nov 21 14:05:18 2021, Simon Waid, Comparison SiC, Si, Si LGAD and Diamond, 3, , 62.4, I(EFE+SID0), Proton, 10000, , , , , , , , ,  
Bias voltage SiC: 800

Bias voltage Si LGAD: -100

From a beam perspective the SiC detector was the first target, on oscilloscope channel 4, the Si LGAD was the second target connected to oscilloscope
Entry  Sat Dec 11 17:47:52 2021, Felix Ulrich-Pur, Alignment run, 3, DSSD-Tracker, 800, V, Proton, , Good, , , , , , , none,  
Fluence loss measurement 11.12.2021

 

 
Entry  Sat Oct 8 07:28:42 2022, Christian Irmler, testrun ramon + tracker + DUT, 3, RD50-MPW3, 800, , , , Unknown, lowflux high, , , , , , ,  
Tracker latency lat=42
Entry  Thu Oct 7 11:08:16 2021, Philipp Gaggl, Pad Sensoren, 29, SiC+Si, 213.4, , Carbon, , Unknown, , , 10, , , , ,  
beamtime on 18.09.2021
CH1: SiC
CH3: Si
Entry  Sun Nov 7 19:28:49 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 29, Drehtisch, 100.4, II(BETA+EFE), Proton, 60e6, Good, , , , , , , Alu, 0 
Start: 19:28

1 cm Alu stair phantom on rotary table (0deg)
Entry  Sat Oct 8 11:30:26 2022, Patrick Sieberer, ramon + tracker + DUT, 29, RD50-MPW3, 100.4, , , , Unknown, lowflux high, , , , , , ,  
ASIC: TH 1350
BEAM OFF

 
Entry  Sun Jan 10 07:19:17 2021, Maximilian Tomaschek, Lowflux recommissioning, 28, Ramon+Tracker, 252.7, , , 10 spills 1e6 events, Good, 10%, , 10, 1, , , ,  
Spotsize 
Entry  Thu Oct 7 11:07:08 2021, Philipp Gaggl, Pad Sensoren, 28, SiC+Si, 402.8, , Carbon, , Unknown, , , 10, , , , ,  
beamtime on 18.09.2021
CH1: SiC
CH3: Si
Entry  Sun Nov 7 19:13:36 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 28, Drehtisch, 100.4, II(BETA+EFE), Proton, 60e6, Good, , , , , , , Alu, 90 
Start: 18:00

1 cm Alu stair phantom on rotary table (90deg)
Entry  Sat Oct 8 11:12:32 2022, Christian Irmler, ramon + tracker + DUT, 28, RD50-MPW3, 100.4, , , , Unknown, lowflux high, , , , , , ,  
ASIC: TH 1310
BEAM OFF

 
Entry  Sun Jan 10 07:19:03 2021, Maximilian Tomaschek, Lowflux recommissioning, 27, Ramon+Tracker, , , , 30 spills, Good, , , , , , , ,  
Spotsize test, nach power cycle
Entry  Tue Mar 16 15:11:34 2021, Patrick Sieberer, Pad Sensoren, 27, , 252.7, nominal, Proton, , Good, , , 100, , , , none,  
Start: 14:28
Range Shifter Out, Filter 1 IN, Filter 2 IN
Power supply of si-sensor went into compliance, therefore the compliance value was set to 100 uA again
Entry  Thu Oct 7 11:03:37 2021, Philipp Gaggl, Pad Sensoren, 27, SiC+Si, 120, , Carbon, , Unknown, , , 10, , , , ,  
beamtime on 18.09.2021
CH1: SiC
CH3: Si
Entry  Sun Nov 7 19:12:57 2021, Felix Ulrich-Pur, Fluence loss meas 7.11.21, 27, Drehtisch, 145.4, II(BETA+EFE), Proton, 60e6, Good, , , , , , , Alu, 90 
Start: 16:40

1 cm Alu stair phantom on rotary table (90deg--> 0.2-1cm Alu)
Entry  Sat Oct 8 11:12:05 2022, Patrick Sieberer, ramon + tracker + DUT, 27, RD50-MPW3, 100.4, , , , Unknown, lowflux high, , , , , , ,  
ASIC: TH 1310 seems to be okay
BEAM ON all included

 