Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 9 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Numberdown DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data
  94   Sun Jun 21 06:12:08 2020 Felix Ulrich-PurSilimond 800MeV 500V32Diamond + DSSD tracker800106020106dB   24116 

800 MeV global run (tracking effciency)
setting4

  186   Sat Oct 10 15:17:51 2020 Manuel Christanell2020-10-1032Drehtisch100.41  1  Alu59.43.600.000 

Start 15:16; PCT test phase;

  93   Sun Jun 21 05:31:37 2020 Felix Ulrich-PurSilimond31Diamond + DSSD trackerNoise          

local run

  185   Sat Oct 10 14:49:45 2020 Manuel Christanell2020-10-1031Drehtisch100.41  1  Alu28.83.100.000 

Start 14:47; PCT test phase;

  56   Sat Jun 13 04:17:12 2020 Felix Ulrich-PurLinearity measurement TERA 125.41(145.4+rangeshifter) gain 40030TERA-Cal125.41BETA  EFE  none 200000 

Linearity Messung Gain 400 10e5 rate range shifter

  92   Fri Jun 19 19:22:10 2020 Felix Ulrich-PurCalibration Diamond,Silimond,pCT6+Diamand30Diamond           

300V-800V in 100V steps

xml files:

/mnt/data/xmls/local/pct_dia_01_diamond_800V_02-000030.xml
/mnt/data/xmls/global/pct_dia_01_diamond_800V_beam_02-000030.xml

all calibration files

800 is only example replace with according voltage

  184   Sat Oct 10 14:17:59 2020 Manuel Christanell2020-10-1030Drehtisch100.41  1  Alu903.300.000 

Start 14:14; PCT test phase;

  6   Sun May 10 16:44:46 2020 Christian IrmlerCalibration Diamond 500V3Diamond252.7nonenone    none   

diamond only
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

  28   Sat Jun 13 00:01:43 2020 Felix Ulrich-PurCalibration TERA MPV 3003TERA-Cal800106020106dB none   

Setting 4

 

  113   Sat Jul 4 04:00:05 2020 Felix Ulrich-PurEFE SID0 Energy measurement3Peakfinder62.4   yes SID0    

1 spills per measurement point

  142   Sun Sep 20 06:43:34 2020 Alexander Burker2020-09-203TERA-Cal800      none   

800 MeV, "Setting 4"

Calibration

  155   Sat Oct 10 09:37:41 2020 Alexander Burker2020-10-103TERA-Cal145.41  1  none   

Start 09:37; TERA Linearity

 

  55   Sat Jun 13 04:16:59 2020 Felix Ulrich-PurLinearity measurement TERA 125.41(145.4+rangeshifter) gain 30029TERA-Cal125.41BETA  EFE  none 200000 

Linearity Messung Gain 300 10e5 rate range shifter

  139   Sat Jul 4 05:43:29 2020 Felix Ulrich-PurEFE SID0 Energy measurement29Peakfinder175.3   yes SID0    

 

 

  183   Sat Oct 10 13:46:54 2020 Manuel Christanell2020-10-1029Drehtisch145.41  1  Alu903.200.000 

Start 13:44; PCT test phase; Trigger events: 10.600.000;

  53   Sat Jun 13 04:15:48 2020 Felix Ulrich-PurLinearity measurement TERA 125.41(145.4+rangeshifter) gain 20028TERA-Cal125.41BETA  EFE  none 200000 

Linearity Messung Gain 200 10e5 rate range shifter

  138   Sat Jul 4 05:42:48 2020 Felix Ulrich-PurEFE SID0 Energy measurement28Peakfinder194.3   yes SID0    

 

 

  182   Sat Oct 10 13:24:40 2020 Manuel Christanell2020-10-1028Drehtisch145.41  1  Alu02.600.000 

Start 13:18; Latency from 40 to 41; TRG_Busy from 50 to 30; Phantom okay; PCT test phase; Tracker events 8.800.000

  54   Sat Jun 13 04:16:42 2020 Felix Ulrich-PurLinearity measurement TERA 145.4 gain 60027TERA-Cal145.4BETA  EFE  none 200000 

Linearity Messung Gain 700 10e5 rate

  137   Sat Jul 4 05:05:29 2020 Felix Ulrich-PurEFE SID0 spot-size measurement27Lynx+RaMon+Octavius145.4   yes SID0    

 

 

ELOG V3.1.5-fc6679b