800 MeV global run (tracking effciency) setting4
telescope shifted 6mm to the left (in beam direction)
4 strips on n- side started to getted really noisy (408,409,483,484)
strips are not noisy
252.7 MeV 400MHz flux test: spill structure in current visible
nominal flux degrader 10, random trigger
500 V run after high flux irradiation
tested 120+180s exposure time of Lynx
tested 180s exposure time of Lynx
800 MeV, "Setting 4"
Timeout stop