Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 2 of 15  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScandown PhantomType PhantomAngle Events Data
  44   Sat Jun 13 03:08:39 2020 Felix Ulrich-PurLinearity measurement TERA 100.4 gain Sr9019TERA-Cal100.4BETA  EFE SID2none 200000 

9Linearity Messung Gain Sr-90

Calibration from Lab not useful-> maybe different voltages if all slices are connected

  73   Sat Jun 13 05:00:28 2020 Felix Ulrich-PurLinearity measurement TERA 83 gain 30048TERA-Cal83   EFE SID2none 200000 

Linearity Messung Gain 300

  74   Sat Jun 13 05:03:45 2020 Felix Ulrich-PurLinearity measurement TERA 83 gain 40049TERA-Cal83   EFE SID2none 200000 

Linearity Messung Gain 400

  104   Sun Jun 21 12:29:57 2020 Felix Ulrich-PurDiamond only 252.7MeV 700V42Diamond252.7   EFE SID2  113770 

252.7 MeV global run

 

telescope shifted 6mm to the left (in beam direction)

 

  105   Sun Jun 21 13:11:19 2020 Felix Ulrich-PurDiamond only 252.7MeV 500V43Diamond252.7   EFE SID2  101536 

252.7 MeV global run

 

telescope shifted 6mm to the left (in beam direction)

 

  106   Sun Jun 21 13:11:37 2020 Felix Ulrich-PurDiamond only 62.4MeV 700V44Diamond62.4   EFE SID2  100528 

62.4MeV global run

 

telescope shifted 6mm to the left (in beam direction)

 

  109   Sun Jun 21 14:16:41 2020 Felix Ulrich-PurDiamond only 252.7 MeV 800V47Diamond252.7   EFE SID2  118671 

252.7 MeV lobal run

 

telescope shifted 6mm to the left (in beam direction)

 

  115   Sat Jul 4 04:00:58 2020 Felix Ulrich-PurEFE SID2 Energy measurement5Peakfinder252.7   yes SID2    

6 spills per point -> no signal measurable (always 0)

  116   Sat Jul 4 04:01:29 2020 Felix Ulrich-PurEFE SID2 Energy measurement6Peakfinder62.4   yes SID2    

6 spills per point -> no signal measurable (always 0)

  131   Sat Jul 4 04:44:19 2020 Felix Ulrich-PurEFE SID2 spot-size measurement21Lynx+RaMon+Octavius+Film62.4   yes SID2    

tested 180s exposure time of Lynx, no signal in Lynx or Octavius

35min irradiation of film (no signal)

  132   Sat Jul 4 04:46:14 2020 Felix Ulrich-PurEFE SID2 spot-size measurement22Lynx+RaMon+Octavius252.7   yes SID2    

tested 180s exposure time of Lynx, no signal in Lynx or Octavius

 

  160   Sat Oct 10 09:53:42 2020 Alexander Burker2020-10-106TERA-Cal100.4   1 SID2none   

Start 09:53; TERA linearity

  173   Sat Oct 10 11:51:19 2020 Manuel Christanell2020-10-1019TERA+Tracker100.4   1 SID2  300.000 

Start 11:38

  174   Sat Oct 10 11:53:27 2020 Manuel Christanell2020-10-1020TERA+Tracker100.4   1 SID2    

Start 11:45

  107   Sun Jun 21 13:54:57 2020 Felix Ulrich-PurDiamond only 252.7 MeV 500V45Diamond252.7   EFE SID0    

252.7 MeV 4MHz flux text no spill structure  in current visible

 

telescope shifted 6mm to the left (in beam direction)

 

  111   Sat Jul 4 03:58:14 2020 Felix Ulrich-PurEFE SID0 Energy measurement1Peakfinder100.4   yes SID0    

3 spills per measurement point

  112   Sat Jul 4 03:59:45 2020 Felix Ulrich-PurEFE SID0 Energy measurement2Peakfinder145.4   yes SID0    

2 spills per measurement point

  113   Sat Jul 4 04:00:05 2020 Felix Ulrich-PurEFE SID0 Energy measurement3Peakfinder62.4   yes SID0    

1 spills per measurement point

  114   Sat Jul 4 04:00:31 2020 Felix Ulrich-PurEFE SID0 Energy measurement4Peakfinder252.7   yes SID0    

2 spills per measurement point

  117   Sat Jul 4 04:02:17 2020 Felix Ulrich-PurEFE SID0 spot-size measurement7Lynx+RaMon+Octavius+Film62.4   yes SID0    

11 min irradiation of film (spot visible)

tested 180,90 and 60s exposure time of Lynx (saturated at >=90)

ELOG V3.1.5-fc6679b