Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 7 of 15  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energydown Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data
  288   Sun Dec 6 16:53:35 2020 Christian IrmlerMPW2207W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r3 c3

tried to syncronized clocks of Caribou and TLU syncronized before run started.
clock of caribou is still 3s ahead. --> need to use ntp server next time.

was interrupted between spill 64 an 65 for about 40 minutes due to MAPTA error (HL-tank error)

stopped after r7 c7

  289   Sun Dec 6 18:59:48 2020 Christian IrmlerMPW2208W13_04252.7   1 SID0 HV = 80V10 spills 

single pixel r0 c2

shutter time set to 2.5s (half of previous value)

  290   Sun Dec 6 19:07:20 2020 Christian IrmlerMPW2209W13_04252.7   1 SID0 HV = 80V10 spills 

single pixel r0 c2

shutter time set to 6s 

  291   Sun Dec 6 19:29:57 2020 Christian IrmlerMPW2210W13_04252.71  1   HV = 80V10 spills 

single pixel r0 c2

test run for new beam settings

  292   Sun Dec 6 19:30:38 2020 Christian IrmlerMPW2211W13_04252.71  1   HV = 80V10 spills 

pixle scan, starting with r0 c0

stopped after r0 c6 due network error (oscilloscope connected)

beam rate ~400k

hit rate MPW2: ~400 hits per spill

  293   Sun Dec 6 19:51:49 2020 Christian IrmlerMPW2212W13_04252.71  1   HV = 80V10 spillsCrap

pixel scan, starting with r0 c7

stopped due to broken pipe

Caribou rebooted

Entry is currently edited by Felix Ulrich-Pur on 80.120.130.63    294   Sun Dec 6 20:04:27 2020 Christian IrmlerMPW2213W13_04252.71  1   HV = 80V10 spills 

pixel scan, starting with r0 c7

 

  23   Sun May 10 20:41:43 2020 Felix Ulrich-PurBeam+Diamond 500V21Diamond194.3nonenone EFE SID2none 150960 

Diamond
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

  119   Sat Jul 4 04:04:53 2020 Felix Ulrich-PurEFE SID0 spot-size measurement9Lynx+RaMon+Octavius194.3   yes SID0    

tested 90,60 and 30s exposure time of Lynx

  126   Sat Jul 4 04:16:09 2020 Felix Ulrich-PurBeta+EFE spot-size measurement16Lynx+RaMon+Octavius194.3yes  yes      

tested 180s exposure time of Lynx

  135   Sat Jul 4 04:48:19 2020 Felix Ulrich-PurEFE SID0 spot-size measurement25Lynx+RaMon+Octavius194.3   yes SID0    

 

 

  138   Sat Jul 4 05:42:48 2020 Felix Ulrich-PurEFE SID0 Energy measurement28Peakfinder194.3   yes SID0    

 

 

  121   Sat Jul 4 04:05:32 2020 Felix Ulrich-PurEFE SID0 spot-size measurement11Lynx+RaMon+Octavius175.3   yes SID0    

tested 30 and 20s exposure time of Lynx

  127   Sat Jul 4 04:16:25 2020 Felix Ulrich-PurBeta+EFE spot-size measurement17Lynx+RaMon+Octavius175.3yes  yes      

tested 180s exposure time of Lynx

  136   Sat Jul 4 05:05:16 2020 Felix Ulrich-PurEFE SID0 spot-size measurement26Lynx+RaMon+Octavius175.3   yes SID0    

 

 

  139   Sat Jul 4 05:43:29 2020 Felix Ulrich-PurEFE SID0 Energy measurement29Peakfinder175.3   yes SID0    

 

 

  50   Sat Jun 13 04:11:34 2020 Felix Ulrich-PurLinearity measurement TERA 145.4 gain 20024TERA-Cal145.4BETA  EFE  none 200000 

Linearity Messung Gain 200 10e5 rate

  51   Sat Jun 13 04:14:29 2020 Felix Ulrich-PurLinearity measurement TERA 145.4 gain 30025TERA-Cal145.4BETA  EFE  none 200000 

Linearity Messung Gain 300 10e5 rate

  52   Sat Jun 13 04:14:44 2020 Felix Ulrich-PurLinearity measurement TERA 145.4 gain 40026TERA-Cal145.4BETA  EFE  none 200000 

Linearity Messung Gain 400 10e5 rate

  54   Sat Jun 13 04:16:42 2020 Felix Ulrich-PurLinearity measurement TERA 145.4 gain 60027TERA-Cal145.4BETA  EFE  none 200000 

Linearity Messung Gain 700 10e5 rate

ELOG V3.1.5-fc6679b