Linearity Messung Gain 400 10e5 rate
252.7 MeV 400MHz flux test: spill structure in current visible
nominal flux degrader 10, random trigger
telescope shifted 6mm to the left (in beam direction)
Start 20:54; Stop 21:16; PCT phase;
Linearity Messung Gain 300 10e5 rate
252.7 MeV 4MHz flux text no spill structure in current visible
Start 20:32; Stop 20:53; PCT phase;
tracking, (with switched APV channels)
Due to invers bias, p- and n-side of diamond are also flipped!
Linearity Messung Gain 200 10e5 rate
62.4MeV global run
Start 20:09; PCT phase;
local run, (with switched APV channels)
34Linearity Messung Gain 600 10e5 rate range shifter
252.7 MeV global run
Start 19:46; PCT phase;
inverse bias, tracking, crap because wrong polarity of APV channels
4Linearity Messung Gain 400 10e5 rate range shifter
Start 19:22; PCT phase;
inverse bias, tracking, no hits in diamond seen
4Linearity Messung Gain 300 10e5 rate range shifter