Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 4 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScandown PhantomType PhantomAngle Events Data
  281   Sun Dec 6 15:44:51 2020 Christian IrmlerMPW2200W13_04252.7   1 SID0 HV = during ramping10 spillsCrap

HV = 

r0 c2

  282   Sun Dec 6 15:45:45 2020 Christian IrmlerMPW2201W13_04252.7   1 SID0 HV = 100V10 spills 

r0 c2

  283   Sun Dec 6 15:53:12 2020 Christian IrmlerMPW2202W13_04252.7   1 SID0 HV off10 spills 

r0 c2

HV set to 0V, but KeithRC SW turned SMU output off 

  284   Sun Dec 6 15:55:13 2020 Christian IrmlerMPW2203W13_04252.7   1 SID0 HV = 1V10 spills 

r0 c2

lowest Voltage, which could be set with SMU outputs on.

  285   Sun Dec 6 15:57:28 2020 Christian IrmlerMPW2204W13_04252.7   1 SID0 HV = 20V10 spills 

r0 c2

  286   Sun Dec 6 16:01:02 2020 Christian IrmlerMPW2205W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r0 c0

stopped after r1 c5 due to synch issues

  287   Sun Dec 6 16:32:54 2020 Christian IrmlerMPW2206W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r1 c6

stopped after r3 c2

stopped due to time difference of ~10s between TLU and Caribou

  288   Sun Dec 6 16:53:35 2020 Christian IrmlerMPW2207W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r3 c3

tried to syncronized clocks of Caribou and TLU syncronized before run started.
clock of caribou is still 3s ahead. --> need to use ntp server next time.

was interrupted between spill 64 an 65 for about 40 minutes due to MAPTA error (HL-tank error)

stopped after r7 c7

  289   Sun Dec 6 18:59:48 2020 Christian IrmlerMPW2208W13_04252.7   1 SID0 HV = 80V10 spills 

single pixel r0 c2

shutter time set to 2.5s (half of previous value)

  290   Sun Dec 6 19:07:20 2020 Christian IrmlerMPW2209W13_04252.7   1 SID0 HV = 80V10 spills 

single pixel r0 c2

shutter time set to 6s 

  Draft   Fri May 8 15:17:39 2020 Felix Ulrich-Pur  DSSD-TrackerNoise          
  2   Sun May 10 13:43:49 2020 Christian Irmlersetup1Diamond + DSSD tracker       none   
Attachment 1: setup.jpg
setup.jpg
  3   Sun May 10 14:51:12 2020 Christian IrmlerCalibration Runs1Diamond + DSSD trackerNoise      none   

ADC delay, FIR, ped, noise,cal with DSSD tracker + diamond
DSSD HV= +/- 50V
Dia HV = +/- 250V

diamond not yet pumped

calibration files: pct_dia_01_silimond_tb_01-000001.xml

  6   Sun May 10 16:44:46 2020 Christian IrmlerCalibration Diamond 500V3Diamond252.7nonenone    none   

diamond only
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

  7   Sun May 10 16:47:10 2020 Christian IrmlerCalibration Diamond 600V4Diamond252.7nonenone    none   

diamond only
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

  9   Sun May 10 17:01:42 2020 Christian IrmlerCalibration Diamond + pCT-6 600V6Diamond + DSSD-pCT6252.7nonenone    none   

pCT-6 + diamond

DSSD HV = +/-50V
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

  10   Sun May 10 17:14:00 2020 Christian IrmlerCalibration Diamond + pCT-6 300V7Diamond + DSSD-pCT6252.7nonenone    none   

pCT-6 + diamond

DSSD HV = +/-50V
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

  11   Sun May 10 17:16:58 2020 Christian IrmlerCalibration Diamond 300V8Diamond252.7nonenone    none   

Diamond only
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

  12   Sun May 10 17:21:28 2020 Felix Ulrich-PurCalibration Diamond 400V9Diamond252.7nonenone    none   

Diamond only
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal

  13   Sun May 10 17:38:55 2020 Felix Ulrich-PurCalibration Diamond+pCT6 400V10Diamond + DSSD-pCT6252.7nonenone    none   

Diamond+pCT6
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal

ELOG V3.1.5-fc6679b