Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 15 of 15  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFEdown Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data
  167   Sat Oct 10 11:22:12 2020 Manuel Christanell2020-10-1013TERA+Tracker           

Start 11:09; without beam; no trigger

  168   Sat Oct 10 11:23:25 2020 Manuel Christanell2020-10-1014TERA+Tracker           

Start 11:10; without beam; no trigger

  169   Sat Oct 10 11:25:38 2020 Manuel Christanell2020-10-1015TERA+Tracker           

Start 11:13; without beam; no trigger

  170   Sat Oct 10 11:41:12 2020 Manuel Christanell2020-10-1016TERA+Tracker           

Test; loose connection kalorimeter

  171   Sat Oct 10 11:43:20 2020 Manuel Christanell2020-10-1017TERA+Tracker           

Test; loose connection kalorimeter

  175   Sat Oct 10 12:58:48 2020 Manuel Christanell2020-10-1021TERA+Tracker           

without Beam; Tracker no trigger; Rotation table problems

  176   Sat Oct 10 12:59:53 2020 Manuel Christanell2020-10-1022TERA+Tracker           

without Beam; Tracker no trigger; Rotation table problems

  177   Sat Oct 10 13:00:05 2020 Manuel Christanell2020-10-1023TERA+Tracker           

without Beam; Tracker no trigger; Rotation table problems

  178   Sat Oct 10 13:00:18 2020 Manuel Christanell2020-10-1024TERA+Tracker           

without Beam; Tracker no trigger; Rotation table problems

  179   Sat Oct 10 13:00:29 2020 Manuel Christanell2020-10-1025TERA+Tracker           

without Beam; Tracker no trigger; Rotation table problems

  180   Sat Oct 10 13:00:41 2020 Manuel Christanell2020-10-1026TERA+Tracker           

without Beam; Tracker no trigger; Rotation table problems

  275   Sun Dec 6 12:52:17 2020 Christian IrmlerMPW2 setup and configuration             

First testbeam with MPW2, Setup as depicted in attachment 1,

Default beam setting EFE/SID0 252 MeV, released setting 

TRIMDAC config from Friday: trimconfig_W13_04_80V_06_12_13_00 - New trimdac run taken on Sunday! 

 

Attachment 1: Setup_for_first_MPW2_Beamtest.pdf
Attachment 2: Shiftplan_MPW2shift_2020-12-06.pdf
ELOG V3.1.5-fc6679b