Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 10 of 15  Not logged in ELOG logo
ID Date Author Subject Run Number DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Eventsdown Data
  287   Sun Dec 6 16:32:54 2020 Christian IrmlerMPW2206W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r1 c6

stopped after r3 c2

stopped due to time difference of ~10s between TLU and Caribou

  288   Sun Dec 6 16:53:35 2020 Christian IrmlerMPW2207W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r3 c3

tried to syncronized clocks of Caribou and TLU syncronized before run started.
clock of caribou is still 3s ahead. --> need to use ntp server next time.

was interrupted between spill 64 an 65 for about 40 minutes due to MAPTA error (HL-tank error)

stopped after r7 c7

  289   Sun Dec 6 18:59:48 2020 Christian IrmlerMPW2208W13_04252.7   1 SID0 HV = 80V10 spills 

single pixel r0 c2

shutter time set to 2.5s (half of previous value)

  290   Sun Dec 6 19:07:20 2020 Christian IrmlerMPW2209W13_04252.7   1 SID0 HV = 80V10 spills 

single pixel r0 c2

shutter time set to 6s 

  291   Sun Dec 6 19:29:57 2020 Christian IrmlerMPW2210W13_04252.71  1   HV = 80V10 spills 

single pixel r0 c2

test run for new beam settings

  292   Sun Dec 6 19:30:38 2020 Christian IrmlerMPW2211W13_04252.71  1   HV = 80V10 spills 

pixle scan, starting with r0 c0

stopped after r0 c6 due network error (oscilloscope connected)

beam rate ~400k

hit rate MPW2: ~400 hits per spill

  293   Sun Dec 6 19:51:49 2020 Christian IrmlerMPW2212W13_04252.71  1   HV = 80V10 spillsCrap

pixel scan, starting with r0 c7

stopped due to broken pipe

Caribou rebooted

Entry is currently edited by Felix Ulrich-Pur on 80.120.130.63    294   Sun Dec 6 20:04:27 2020 Christian IrmlerMPW2213W13_04252.71  1   HV = 80V10 spills 

pixel scan, starting with r0 c7

 

  194   Sat Oct 10 18:33:20 2020 Manuel Christanell2020-10-1040Drehtisch100.41  1  Alu298.81.000.000 

Start 18:25; PCT phase; No internet in guest WLAN

  270   Sat Nov 21 20:09:13 2020 Patrick Sieberer2020-11-2141Diamond + DSSD tracker80010602010  none - 

inverse bias, local run

  Draft   Fri May 8 15:17:39 2020 Felix Ulrich-Pur  DSSD-TrackerNoise          
  2   Sun May 10 13:43:49 2020 Christian Irmlersetup1Diamond + DSSD tracker       none   
  3   Sun May 10 14:51:12 2020 Christian IrmlerCalibration Runs1Diamond + DSSD trackerNoise      none   

ADC delay, FIR, ped, noise,cal with DSSD tracker + diamond
DSSD HV= +/- 50V
Dia HV = +/- 250V

diamond not yet pumped

calibration files: pct_dia_01_silimond_tb_01-000001.xml

  6   Sun May 10 16:44:46 2020 Christian IrmlerCalibration Diamond 500V3Diamond252.7nonenone    none   

diamond only
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

  7   Sun May 10 16:47:10 2020 Christian IrmlerCalibration Diamond 600V4Diamond252.7nonenone    none   

diamond only
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

  9   Sun May 10 17:01:42 2020 Christian IrmlerCalibration Diamond + pCT-6 600V6Diamond + DSSD-pCT6252.7nonenone    none   

pCT-6 + diamond

DSSD HV = +/-50V
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

  10   Sun May 10 17:14:00 2020 Christian IrmlerCalibration Diamond + pCT-6 300V7Diamond + DSSD-pCT6252.7nonenone    none   

pCT-6 + diamond

DSSD HV = +/-50V
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

  11   Sun May 10 17:16:58 2020 Christian IrmlerCalibration Diamond 300V8Diamond252.7nonenone    none   

Diamond only
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

  12   Sun May 10 17:21:28 2020 Felix Ulrich-PurCalibration Diamond 400V9Diamond252.7nonenone    none   

Diamond only
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal

  13   Sun May 10 17:38:55 2020 Felix Ulrich-PurCalibration Diamond+pCT6 400V10Diamond + DSSD-pCT6252.7nonenone    none   

Diamond+pCT6
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal

ELOG V3.1.5-fc6679b