Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 1 of 15  Not logged in ELOG logo
Entry  Sun Dec 6 15:53:12 2020, Christian Irmler, MPW2, 202, W13_04, 252.7, , , , 1, , SID0, , HV off, 10 spills,  

r0 c2

HV set to 0V, but KeithRC SW turned SMU output off 

Entry  Sun Dec 6 15:44:51 2020, Christian Irmler, MPW2, 200, W13_04, 252.7, , , , 1, , SID0, , HV = during ramping, 10 spills, Crap 

HV = 

r0 c2

Entry  Sun Dec 6 15:37:05 2020, Christian Irmler, MPW2, 197, W13_04, 252.7, , , , 1, , SID0, , HV = 80V, 10 spills,  

HV = 80V

r0 c2

Entry  Sun Dec 6 16:01:02 2020, Christian Irmler, MPW2, 205, W13_04, 252.7, , , , 1, , SID0, , HV = 80V, 10 spills,  

pixel scan, starting with r0 c0

stopped after r1 c5 due to synch issues

Entry  Sun Dec 6 16:32:54 2020, Christian Irmler, MPW2, 206, W13_04, 252.7, , , , 1, , SID0, , HV = 80V, 10 spills,  

pixel scan, starting with r1 c6

stopped after r3 c2

stopped due to time difference of ~10s between TLU and Caribou

Entry  Sun Dec 6 16:53:35 2020, Christian Irmler, MPW2, 207, W13_04, 252.7, , , , 1, , SID0, , HV = 80V, 10 spills,  

pixel scan, starting with r3 c3

tried to syncronized clocks of Caribou and TLU syncronized before run started.
clock of caribou is still 3s ahead. --> need to use ntp server next time.

was interrupted between spill 64 an 65 for about 40 minutes due to MAPTA error (HL-tank error)

stopped after r7 c7

Entry  Sun Dec 6 18:59:48 2020, Christian Irmler, MPW2, 208, W13_04, 252.7, , , , 1, , SID0, , HV = 80V, 10 spills,  

single pixel r0 c2

shutter time set to 2.5s (half of previous value)

Entry  Sun Dec 6 19:07:20 2020, Christian Irmler, MPW2, 209, W13_04, 252.7, , , , 1, , SID0, , HV = 80V, 10 spills,  

single pixel r0 c2

shutter time set to 6s 

Entry  Sun Dec 6 19:29:57 2020, Christian Irmler, MPW2, 210, W13_04, 252.7, 1, , , 1, , , , HV = 80V, 10 spills,  

single pixel r0 c2

test run for new beam settings

Entry  Sun Dec 6 19:30:38 2020, Christian Irmler, MPW2, 211, W13_04, 252.7, 1, , , 1, , , , HV = 80V, 10 spills,  

pixle scan, starting with r0 c0

stopped after r0 c6 due network error (oscilloscope connected)

beam rate ~400k

hit rate MPW2: ~400 hits per spill

Entry  Sun Dec 6 19:51:49 2020, Christian Irmler, MPW2, 212, W13_04, 252.7, 1, , , 1, , , , HV = 80V, 10 spills, Crap 

pixel scan, starting with r0 c7

stopped due to broken pipe

Caribou rebooted

Entry is currently edited by Felix Ulrich-Pur on 80.120.130.63  Entry  Sun Dec 6 20:04:27 2020, Christian Irmler, MPW2, 213, W13_04, 252.7, 1, , , 1, , , , HV = 80V, 10 spills,  

pixel scan, starting with r0 c7

 

Entry  Sun Dec 6 15:38:59 2020, Christian Irmler, MPW2, 198, W13_04, 252.7, , , , 1, , SID0, , HV = 60V, 10 spills,  

HV = 60V

r0 c2

Entry  Sun Dec 6 15:41:31 2020, Christian Irmler, MPW2, 199, W13_04, 252.7, , , , 1, , SID0, , HV = 40V, 10 spills,  

HV = 40V

r0 c2

Entry  Sun Dec 6 15:57:28 2020, Christian Irmler, MPW2, 204, W13_04, 252.7, , , , 1, , SID0, , HV = 20V, 10 spills,  

r0 c2

Entry  Sun Dec 6 15:55:13 2020, Christian Irmler, MPW2, 203, W13_04, 252.7, , , , 1, , SID0, , HV = 1V, 10 spills,  

r0 c2

lowest Voltage, which could be set with SMU outputs on.

Entry  Sun Dec 6 15:45:45 2020, Christian Irmler, MPW2, 201, W13_04, 252.7, , , , 1, , SID0, , HV = 100V, 10 spills,  

r0 c2

Entry  Sun Oct 11 03:07:56 2020, Stefanie Kaser, 2020-10-11, 60, Drehtisch, 100.4, 1, , , 1, , , Alu, 97.2, 2.500.000,  

Start 02:39; Stop 03:04; PCT phase; 

Entry  Sun Oct 11 21:56:52 2020, Albert Hirtl, 2020-10-11, 108, Drehtisch, 100.4, 1, , , 1, , , Alu, 91.8, 1326000,  

Start 21:57; Stop 22:10; PCT phase; 

Entry  Sat Oct 10 13:46:54 2020, Manuel Christanell, 2020-10-10, 29, Drehtisch, 145.4, 1, , , 1, , , Alu, 90, 3.200.000,  

Start 13:44; PCT test phase; Trigger events: 10.600.000;

ELOG V3.1.5-fc6679b